An administrator is configuring software only. Data-at-Rest Encryption on their Nutanix cluster. They are planning to deploy a third-party key management server (KMS).

Where should this server be hosted?

Options:

A.

As a single VM on the Nutanix cluster

B.

On hardware external to the Nutanix duster

C.

As a clustered VM setup on the Nutanix cluster

D.

As a single VM deployed on the host that contains the Prism leader CVM

Buy Now
Questions 5

Which Nutanix tool does the Field Installation Guide provide instructions for?

Options:

A.

Prism Central

B.

Foundation

C.

As-Built Generator

D.

Nutanix Move

Buy Now
Questions 6

Based on customer requirements, a consultant conducted an AHV cluster deployment. Each node is configured with four NICs.

Which two components should the consultant manually update in the As-Built Guide? (Choose two.)

Options:

A.

Node Port Layout Diagram

B.

Network Cabling Diagram

C.

Logical Design Diagram

D.

Site installation Diagram

Buy Now
Questions 7

Refer to the exhibit.

NCS-Core Question 7

A consultant is installing AOS 5.10 and ESXi 6.5 on three nodes. During the Foundation process, ESXi 6.5 is not available as one of the choices for hypervisor.

Which solution should the consultant use?

Options:

A.

Upload ESXi image to /home/Nutanix/foundation/nos/hypervisor/esx.

B.

Restart Foundation VM and refresh Foundation page.

C.

Update the Foundation whitelist from the support portal.

D.

Upload ESXi image to /home/Nutanix/foundation/isos/hypervisor/esx.

Buy Now
Questions 8

An organizations Nutanix Cluster is based on VMware vSphere. The cluster is configured to download software updates automatically. The administration needs to verify and eventually upgrade VMware hypervisor via Prism Ul.

After logging in to Prism, the administrator receives the message shown:

No available versions for upgrade

What is causing the current state?

Options:

A.

VMware support has expired, so downloads are not available.

B.

vSphere binaries need to be manually uploaded.

C.

The environment is running the latest vSphere version, so no update is required.

D.

The cluster is unable to connect to reIease-api.nutanix-ccm:8D.

Buy Now
Questions 9

A customer buys ultimate licensing and wants to use the built-in Nutanix software encryption on their new AHV cluster. The customer needs to create three storage containers and asks the consultant to complete the process as fast as possible.

In which order should the cluster be deployed?

Options:

A.

Create Cluster -> Install License Key -> Encrypt Cluster -> Create Storage Containers

B.

Create Cluster -> Install License Key -> Create Storage Containers -> Encrypt Cluster

C.

Create Cluster -> Encrypt Cluster -> Install License Key -> Create Storage Containers

D.

Create Cluster -> Create Storage Containers -> Encrypt Cluster -> Install License Key

Buy Now
Questions 10

An administrator deletes a large amount of data from a Volume Group presented to a Linux VM. The administrator notices that the deleted data has not been reclaimed as usable storage.

What action should be taken to reclaim the storage capacity?

Options:

A.

Shrink the Volume Group that is associated with the Linux VM

B.

Unmount the Volume Group and then Remount the Volume Group

C.

Enable the unman operation on the Linux VM

D.

Run Defrag on the Linux VM

Buy Now
Questions 11

An administrator needs to maximize storage potential in a six-node cluster. The container is configured with the following:

  • Post-process compression
  • Capacity deduplication

What should the administrator configure to increase space savings?

Options:

A.

Erasure coding

B.

Inline compression

C.

Reserve capacity

D.

Cache dedupe

Buy Now
Questions 12

An administrator needs to relocate an AHV cluster to a new datacenter during a maintenance window. The cluster will use the same IPs in the new datacenter.

Which two steps should be taken to prepare for this task? (Choose two.)

Options:

A.

Stop all Nutanix Files clusters

B.

Relocate the linked LDAP servers

C.

Shut down all user VMs in the cluster

D.

Reconfigure IPMI for the new datacenter

Buy Now
Questions 13

An administrator is managing multiple Windows and Linux VMs connected to Nutanix Volumes. The Linux VMs are experiencing intermittent connectivity issues. The Windows VMs do not experience the same issue.

Which option should the administrator use to resolve this issue?

Options:

A.

Utilize Jumbo Frames

B.

Add additional disks to the Volume Group

C.

Set the SCSI timeout value to 60

D.

Utilize a separate subnet for the Linux VMs

Buy Now
Questions 14

An administrator is deploying a three-tier application on a Nutanix Enterprise Cloud consisting of web, application, and database VMs. Traffic between the servers must be limited to specific services/ports. There is an application layer firewall VM deployed on one host in the cluster.

In which way should the administrator meet this requirement?

Options:

A.

Create a network for each type of VM, and use policy-based routing to control the traffic flow

B.

Configure a security policy and service chain redirecting the server traffic through the firewall

C.

Separate the web. application and database VMs on to dedicated VLANs

D.

Categorize the VMs in Prism Central and utilize Flow to set a security policy

Buy Now
Questions 15

Refer to the exhibit.

NCS-Core Question 15

A consultant is deploying a cluster using the customer-provided IP addressing information.

Which option in Foundation must be configured to ensure connectivity during the deployment?

Options:

A.

Link Aggregation

B.

Range Autofill

C.

Network Segmentation

D.

Multi-homing

Buy Now
Questions 16

For a new AHV cluster installation, a customer has 20 NX-8155 nodes with quad port NICs. The customer wants to meet the following guidelines:

◦Take advantage of all available 10G links

◦Achieve maximum throughput per VM

◦Use of redundant ToR switches

◦Fastest reconvergence during link failure

How should the load balancing be configured on the host?

Options:

A.

In Prism Element, update the virtual switch uplink configuration to Active-Active with MAC pinning.

B.

In Prism Element, update the virtual switch uplink configuration to Active-Active.

C.

Use CLI to add the interfaces to bridge bro on all hosts.

D.

Use CLI to configure Balance-TCP on bridge bro.

Buy Now
Questions 17

Imaging fails for one or more nodes in the cluster

NCS-Core Question 17

A log file displays this output:

Interface ethO has an uplink.

Downloading livefs files... Connecting to 10.249.230.171:8000 (10.249.230.171:8000) [80.852033] random: nonblocking pool is initialized

tar: short read livecd files not found.

What is the possible root cause?

Options:

A.

IPMI credentials are invalid.

B.

There is a problem connecting to the Foundation VM.

C.

Hypervisor version is not on the whitelist (iso_whitelist. j son).

D.

AOS version is incompatible.

Buy Now
Questions 18

A customer wants to run SAP HANA on a Nutanix cluster with the following characteristics:

• AHV nodes

• SAP HANA version 2

• Production database files

Which configuration should be recommended to the customer?

Options:

A.

Start with a cluster containing three or more nodes

B.

Enable only compression for the container that contains the Production database

C.

Do not enable compression, deduplication. or erasure coding on the storage container

D.

Plate the SAP HANA Database on the same socket as CVM

Buy Now
Questions 19

A consultant is onsite with a customer running Foundation VM (FVM) and discovers that there is no connectivity between the FVM and their laptop. The consultant verifies the following:

* The consultant’s laptop and Nutanix nodes are plugged into a flat switch.

* The laptop, switch and nodes are plugged into supported power supplies.

* The laptop network adapters and FVM are configured with their corresponding IP addresses.

What is the cause for the connectivity failure to the FVM?

Options:

A.

The switch is not plugged into the power supply.

B.

Desktop Firewall is blocking ping requests.

C.

Network cables are not connected.

D.

Laptop WiFi configured to use DHCP.

Buy Now
Questions 20

An administrator protected a DB VM running on a Nutanix cluster with NearSync Replication, which schedules to repeat every 15 minutes □ to a second site. The daily change rate is low. During nightly backups, the replication window is missed due to write volume.

Which two options describe the expected behavior? (Choose two.)

Options:

A.

NearSync stops working and fails over to the remote site.

B.

Protection Domain transitions back to the hourly schedule.

C.

The Administrator needs to re-enable it manually.

D.

The system continuously tries to get to the NearSync schedule.

Buy Now
Questions 21

A customer design calls for link aggregation. Despite the consultant verifying all hosts are correctly configured for fallback per Nutanix best practices, initial testing reveals the aggregate bond fails to pass traffic and shows a status of configured.

What is the most likely cause for the bond disabling and reporting a "configured" status?

Options:

A.

The uplinks in the bond need to be turned on.

B.

The ports need to be flushed.

C.

Failed negotiation due to misconfiguration on ToR switches.

D.

The bond needs to be reconfigured for balance s_b mode.

Buy Now
Questions 22

Where in the Support Portal is the Best Practices guide for vSphere Networking located?

Options:

A.

Product Notices

B.

Solutions Documentation

C.

Software Documentation

D.

Knowledge Base

Buy Now
Questions 23

A consultant configures an ESXi cluster which will utilize a vSphere Distributed Switch (vDS). The consultant has just migrated the first host to the dvSwitch when several alerts appear within Prism Element regarding Host-to-CVM connectivity.

What is causing these alerts?

Options:

A.

The consultant migrated the CVM Backplane and VM network adapter over to the vDS.

B.

The consultant migrated the CVM svm-iscsi-pg network adapter over to the vDS.

C.

The consultant migrated the CVM Backplane network adapter over to the vDS.

D.

VLAN tags are incorrectly configured on the vDS port groups.

Buy Now
Questions 24

A customer recently bought services from their consultant to re-configure an existing Cluster for a new use case. The data on the cluster is not important. The customer does not know the CVM usernames and passwords.

Which Foundation tool should the consultant use to resolve this issue?

Options:

A.

Foundation VM - Auto Discovery

B.

Foundation Applet(CVM) - Auto Discovery

C.

Foundation VM - Bare Metal

D.

Foundation Applet(CVM) - Bare Metal

Buy Now
Questions 25

During the knowledge transfer session, a consultant conducts a storage management demo. In the Creating a Storage Container workflow, the customer notices the Reserved Capacity parameter and asks for best practices related to it.

How should the consultant respond?

Options:

A.

Nutanix recommends to configure at least 2 storage pools with at least one storage container each.

B.

Do not reserve less than 90% of the total space in the storage pool.

C.

Reserve capacity for a storage container only if the storage pool consists of single storage container.

D.

Reserve capacity for a storage container only if the storage pool consists of multiple storage containers.

Buy Now
Questions 26

What must be set to enable node discovery when using Foundation VM?

Options:

A.

Host-only Adapter

B.

Bridged Adapter

C.

Network Address Translation

D.

Internet Access

Buy Now
Questions 27

A consultant is conducting a vSphere cluster deployment. As a part of operational tests, a vMotion operation is performed on a test VM, but fails with following error message:

The VMotion failed because the ESX hosts were not able to connect over the VMotion network. Please check your VMotion network settings and physical network configuration.

VMotion [184329483:1276605211167987] failed to create connection with remote host <10.10.16.14>: The ESX hosts failed to connect over the VMotion network Migration [184329483:1276605211167987] failed to connect to remote host <10.10.16.14>: Timeout

What issue could prevent the vMotion operation from completing successfully?

Options:

A.

The vmknic is configured with a conflicting IP address.

B.

NIOC is enabled and vMotion traffic is configured with Share value SO.

C.

Foundation service prevents connectivity between the source and the destination TCP port 8000.

D.

The vSS is configured with Route based on originating virtual port.

Buy Now
Questions 28

An administrator receives an alert in Prism indicating that interface eth2, on an AHV host is receiving many CRC errors. After togging into the problematic host, the following command is run to show the indicated output:

NCS-Core Question 28

What is causing this issue?

Options:

A.

Incorrect link speeds on the switch

B.

The interface is incorrectly configured with Jumbo Frames

C.

A misconfigured bond

D.

A physical layer network problem

Buy Now
Questions 29

A customer needs a 20-node cluster built. The consultant only has a 16-port flat network switch, and the customer is using VLAN tagging for the hosts and CVMs.

How should the consultant create the cluster?

Options:

A.

Set VLAN tags on all hosts and CVMs.

B.

Create the Nutanix cluster manually.

C.

Connect the cluster to the production network.

D.

Create a separate four-node cluster.

Buy Now
Questions 30

A consultant creates a Windows VM after installing a new Nutanix cluster running AHV. The consultant has statically assigned an IP address to the VM but it is unable to communicate on the network.

Which action should the consultant take to resolve this issue?

Options:

A.

Confirm that IPv6 is enabled on the guest VM.

B.

Confirm that the VM vNIC is tied to the correct VLAN in Prism Element.

C.

Mount and install the Nutanix Guest Tools.

D.

Set a Group Policy to make sure the Windows Firewall is disabled.

Buy Now
Questions 31

A consultant is installing Nutanix AOS on Cisco UCS.

Which method should be used to install AOS on UCS hardware platforms?

Options:

A.

Foundation Central

B.

Foundation Applet

C.

Foundation VM

D.

Foundation as a Service

Buy Now
Questions 32

A consultant has deployed a new Nutanix AHV cluster with Foundation. The customer requests separating the management and production traffic in the CVM.

Which feature should the consultant configure?

Options:

A.

Micro-segmentation

B.

Multi-homing

C.

Network Segmentation

D.

VLAN Tagging

Buy Now
Questions 33

A consultant attempts to perform an LCM inventory after successfully creating the cluster, but is met with the following error:

LCM Exception [LcmExceptionHandler]: Could not find a module for entity with reference name nutanix.ncc.update

What is the most likely reason LCM inventory/update is failing?

Options:

A.

Nameservers are not reachable.

B.

IPMI network is unable to reach the internet.

C.

Clusters must be licensed before LCM inventory.

D.

Nutanix CVMs are blocking TCP port 54.

Buy Now
Questions 34

A guest VM is reported to have poor storage performance. It has an I/O profile of 80% read. 20% write, and the HDDs form more than 50% of the read source.

What should an administrator do to resolve this issue?

Options:

A.

Increase SSD capacity

B.

Increase the OPLOG

C.

Increase the write cache

D.

Use HDDs with higher RPM

Buy Now
Questions 35

After the migration, some SQL queries take longer to execute than prior to migration.

The following SQL best practices were applied while creating the SQL VM on Nutanix:

•8 vDisks per SQL server VM

•Database and Log files on separate vDisk

•2 TempDB database drives and 1 TempDB log drive

What should the administrator to do improve the SQL Server performance?

Options:

A.

Redistribute existing data by creating additional database file and enable autogrowth

B.

Create multiple TempDB data files and enable autogrowth

C.

Create multiple SQL log files and disable autogrowth

D.

Redistribute existing data by creating additional database files and disable autogrowth

Buy Now
Questions 36

A consultant is completing final network failover testing on a recently deployed AHV cluster.

The cluster consists of the following:

•Three nodes

•Two uplinks connected to two switches

•Supported SFPs

The consultant removed one SFP+ out of each node. Two of the nodes (Hostl I Host2) failed over to the backup NIC correctly without any interruption but have lost communication with the third node (Host 3) hypervisor/CVM. Inserting the original SFP+ back into the problematic node allowed the network to be connected and the two healthy nodes could communicate successfully again.

manage_ovs showjnterfaces output

manage_ovs showjinterfaces output:

name mode link speed

cthO 10000 True 10000

ethl 10000 False None

eth2 10000 True 10000

eth3 10000 False None

manage_ovs show.uplinks output:

Bridge: brO

Bond: brO-up

bond_mode: active-backup

interfaces: ethl ethO

lacp: off

lacp-fa I 1 back: false

lacp_speed: slow

What should the consultant validate first?

Options:

A.

Validate NIC card on node is seated properly.

B.

Validate that the correct interfaces are included in the bridge.

C.

Validate the customer has configured all their switch ports identically.

D.

Validate the SFP+ is fully plugged into the node and switch.

Buy Now
Questions 37

During which part of the Knowledge Transfer does the customer learn about Nutanix basics and their environment at a high level?

Options:

A.

Technical Checklist

B.

Technical Handoff Slides

C.

Support portal

D.

As-Built Guide

Buy Now
Questions 38

A customer wants to ensure that the Data Protection configuration using Protection Domains is fully functional.

The consultant has configured a protection domain for newly-created VMs with static IP addresses on multiple VLANs. The network administrator confirmed that the correct subnets exist at both physical sites.

After performing a failover operation, the virtual machines are turned back on but have no network access.

Which statement describes this issue?

Options:

A.

Network mappings are not configured for the Remote Site.

B.

Nutanix Guest Tools (NGT) are mandatory to use Data Protection.

C.

VirtIO drivers need to be reinstalled after a failover.

D.

Remote Virtual IP addresses are missing for the Remote Site.

Buy Now
Questions 39

A consultant is deploying a Nutanix cluster at a customer location. The consultant will be deploying the latest AOS along with the latest Nutanix hardware.

Which three references should the consultant review prior to this installation? (Choose three.)

Options:

A.

Release Notes

B.

Software Product Interoperability

C.

Field & Security Advisories

D.

End-Of-Life (EOL) Information

E.

Acropolis Advanced Administration Guide

Buy Now
Questions 40

What reference materials should be provided to the customer during the Knowledge Transfer?

Options:

A.

Questionnaire, technical slides and checklist, links to documentation and resources

B.

As-Built Guide, technical slides and checklist, Network Diagram

C.

As-Built Guide, Project Plan, links to documentation and resources

D.

As-Built Guide, technical slides and checklist, links to documentation and resources

Buy Now
Questions 41

A consultant is working with a customer on a new cluster deployment.

While reviewing the customer questionnaire, the consultant notices that the customer has documented their DNS servers as follows:

•CompanyDNSI 192.168.5.10

•CompanyDNS2 192.1685.20

What should the consultant consider regarding this deployment?

Options:

A.

Everything has been accounted for to ensure a successful deployment.

B.

Internal Nutanix networking will interfere with the installation's ability to complete.

C.

During deployment, the CVMs should be configured to use a separate network.

D.

New IP's provided should be verified to not conflict with the customers network.

Buy Now
Questions 42

A consultant is not able to run the As-Built Tool for a technical reason.

What action should the consultant take to gather information and provide customer documentation?

Options:

A.

Manually create documentation using As-Built document template.

B.

Use RVTools for vSphere and Hyper-V deployments.

C.

Create a support case on behalf of a customer.

D.

Access portal.nutanix.com, search Software Documentation.

Buy Now
Questions 43

A Nutanix cluster has 10TB usable storage. The customer wants to create a 100GB datastore for ISO images to eliminate too much storage being consumed by unnecessary images.

Which setting should be used to accomplish this goal?

Options:

A.

From Container Advanced Settings, configure 100GB for advertised capacity.

B.

From Container Advanced Settings, enable erasure coding.

C.

From Container Advanced Settings, turn on compression and deduplication.

D.

From Container Advanced Settings, configure 100GB for reserved capacity.

Buy Now
Questions 44

An administrator configures authentication in Prism Central (PC) for the NTNX-Admins group. Users report that they are unable to log in. The administrator confirms that the Active Directory (AD) settings in PC are correct.

Which condition could result in this behavior?

Options:

A.

A role mapping needs to be associated with the AD group.

B.

The users must be added to the Domain Admins AD group.

C.

The Local authentication type must also be selected in PC.

D.

A client chap certificate must also be added in PC.

Buy Now
Questions 45

An administrator is planning to deploy a Nutanix cluster to support a few high-performance VMs. This deployment will have the following considerations:

• Individual VMs will likely generate network throughputs in the range of 90-100Mbps

• Due to the configuration of the VMs, it is unlikely that a node will host more than one or two of them at a time

• Individual VMs will communicate with only a few (one or two) remote hosts at a time

• Multicast will not be used in the environment

• The hosts are connected via two 1GbE network connections

How should the administrator configure the network bonds to meet this requirement while maintaining the simplest switch configuration?

Options:

A.

Configure bond0 as balance-sib

B.

Configure bond0 as active-backup

C.

Configure bond0 as balance-tcp

D.

Configure bond0 as balance-lacp

Buy Now
Questions 46

An administrator receives reports that VDI desktop performance in an 8-node Nutanix VDI environment is poor. Opening applications takes between 1 and 2 minutes.

When investigating the issue, the following conditions are found:

• Cluster memory utilization: 80%

• Cluster SSD utilization: 70%

• Average VM CPU Wait Time: 11%

• CVM CPU utilization: 75%

Which action should be taken to improve VDI performance?

Options:

A.

Increase the amount of SSD storage in the cluster.

B.

Add memory to the nodes in the cluster.

C.

Add CPU resources to the cluster.

D.

Increase the number of vCPU cores allocated to the CVM.

Buy Now
Questions 47

An administrator needs to create and start five new VMs for a Data Analytics Project (OLAP). The VM Profile is as follows:

• vCPU:4

• vRAM: 64 GB

• vDisk: 1.5 TB

Each of the four nodes of the Nutanix cluster has the following:

• 24 vCPU. 20% overall usage

• 192 GB RAM, 60% overall usage

• 2xl920GBSSD

• 4x 2 TB HDD

At cluster level, there is a single RF2 container that is 30% utilized and has an extent store capacity of 13.5 TB.

Which component requires administrator attention?

Options:

A.

Physical RAM, because it is not enough to power on all of the new VMs.

B.

Physical Cores, because they are not enough to power on all of the new VMs.

C.

Storage, because the capacity is not enough to create VMs.

D.

Flash Tier because it is not enough to accommodate the workloads.

Buy Now
Questions 48

A customer has an ESXi Cluster with two 10GbE NICs on each node with the following requirements:

* Solution must follow Nutanix Best Practices

* Network configuration should be redundant

* A vSphere Standard Switch must be utilized

Which load balancing method should be used?

Options:

A.

Route based on originating port ID

B.

Route based on physical NIC load

C.

Route based on IP hash

D.

Route based on source MAC hash

Buy Now
Questions 49

An administrator receives a notification that storage in a Nutanix cluster is unavailable. The cluster consists of five nodes and is configured with a Fault-Tolerance level of 1 (FT-1).

Upon investigation, the administrator finds the following:

• All AHV hosts are powered on and the CVMs are running

• Nodes A, B, and C are connected to one top of rack switch

• Nodes D and E are connected to a second top of rack switch

• The cluster status command run on Node A shows that CVM services on nodes D and E are down

Which issue is causing the storage outage?

Options:

A.

The default gateway for the CVMs and AHV hosts is down.

B.

The switch connecting Nodes D and E is down.

C.

The genesis process is down on both Nodes D and E.

D.

Nodes D and E are in maintenance mode.

Buy Now
Questions 50

An administrator needs to forecast infrastructure requirements for a new program and its associated applications. Prior to the projected start of the new program, all existing applications will be decommissioned.

How should the administrator perform this task?

Options:

A.

Check the Disregard Existing Workloads radio button in the Runway scenario.

B.

Check the Disregard Existing Nodes radio button in the Runway scenario.

C.

Add up the recovered workloads and manually remove from the Runway configuration.

D.

Power down the workloads during a maintenance window and run the Capacity Runway.

Buy Now
Questions 51

An administrator configure Active Directory (AD) authentication for their Nutanix environment. When login in using an AD user account, the login process takes more than one minute to complete. No delay occurs when logging a local account.

What should the administrator confirm to resolve this issue?

Options:

A.

The user search base for the group is configured correctly

B.

The domain controller being used is configured as a global catalog server.

C.

Active directory lookups are configured to use Non-Recursive mode.

D.

The service Account Username is correct for the domain.

Buy Now
Questions 52

An administrator knows that the disks in a cluster are out of date and a new firmware is available. For security reasons, these clusters do not have access to the Internet.

Which two steps must be completed to update the firmware? (Choose two.)

Options:

A.

Configure LCM with a URL to access the firmware bundle.

B.

Download a dark site bundle and stage it on an internal webserver.

C.

Download the updated firmware .tgz file from the Nutanix portal.

D.

Select Upgrade Software, then select disks and upload the updated firmware.

Buy Now
Questions 53

An administrator learns that some security settings in a cluster have been changed. The environment is out of compliance with required policies.

Which function should be used to revert any settings that have changed from the defaults and prevent further violations?

Options:

A.

Cluster Lockdown with strong password enforcement

B.

Advanced Intrusion Detection Environment (AIDE)

C.

Security Configuration Management Automation (SCMA)

D.

Defense Information Systems Agency STIG enforcement

Buy Now
Questions 54

A consultant runs the Foundation Applet and discovers all the nodes. The consultant wants to use the latest version of Foundation for imaging for support purposes and to cover the latest hardware and software hypervisor support.

What should the consultant do to upgrade Foundation on a node?

Options:

A.

Use crash cart and manually upgrade Foundation files on one node.

B.

Use latest version of Foundation to reimage all the nodes.

C.

Use the Foundation VM to upgrade Foundation on all nodes.

D.

Use the Foundation Applet to upgrade Foundation on a single node.

Buy Now
Questions 55

After imaging the nodes and creating the cluster successfully, the consultant connects the cluster to the customer network. When logging into Prism, the events dashboard is full of errors.

What is causing the issue?

Options:

A.

The cluster was not stopped prior to connecting to the customer network.

B.

The Cluster Virtual IP Address (VIP) was not set up during the process.

C.

Foundation did not create the cluster successfully.

D.

The consultant did not run Nutanix Cluster Check (NCC)

Buy Now
Questions 56

A customer’s security team has a policy prohibiting a consultant’s laptop from connecting within the corporate datacenter.

In which two ways should the consultant complete the customer deployment on the factory-prepared nodes? (Choose two.)

Options:

A.

Use the Controller VM-based Foundation process.

B.

Configure IPs on hosts and create the cluster.

C.

Run the Network Crashcart Script, provide IPs, and create the cluster manually.

D.

Manually edit ifcfg-etho file on CVM, restart networking, and create the cluster.

Buy Now
Questions 57

In preparing to install a new cluster for a company, a consultant needs to complete an installation worksheet.

Which values must be documented prior to initial base system setup?

Options:

A.

Block Serial Numbers

B.

Hypervisor, CVM, and IPMI IP Addresses

C.

DNS and NTP IP Addresses

D.

Prism Central IP Address

Buy Now
Questions 58

Refer to Exhibit:

NCS-Core Question 58

A consultant is conducting cluster deployment using Foundation VM on a laptop.

What troubleshooting step is required?

Options:

A.

Disable local machine firewall to ensure its not blocking traffic.

B.

Verify Foundation VM is configured with at least 4GB of memory.

C.

Confirm that TCP port 5123 is open.

D.

Ensure that adaptive endpoint security agents are enabled.

Buy Now
Questions 59

Refer to the exhibit.

NCS-Core Question 59

An administrator notices a critical alert on the Metro Availability Protection Domain What is causing this alert?

Options:

A.

Metro Availability Protection domain is active on the remote site.

B.

VMware Site Recovery Manager is handling a failover event

C.

Metro Availability did not fail over and caused an outage.

D.

vSphere moved VMs to the remote container, and the VMs must be moved back.

Buy Now
Questions 60

An administrator needs to make sure an RF2 cluster can survive a complete rack failure without negatively effecting workload performance. The current cluster configuration consists of the following:

• 30 nodes: distributed 10 nodes per rack across three 42U rack

• Each nodes is configured with 40TB usable storage all flash (Cluster Total 1.2 PB Usable)

• Current cluster utilization is 900TB storage

Which configuration changes should be made to make sure that the cluster meets the requirements?

Options:

A.

Expanse the cluster by adding 3 additional nodes per rack, 9 nodes total.

B.

Expanse the cluster by adding 2 additional nodes per rack, 6 nodes total.

C.

Expanse the cluster by adding 9 nodes to a new 42U rack

D.

Expanse the cluster by adding 8 nodes to a new 42U rack

Buy Now
Questions 61

A consultant creates a four-node AHV cluster with two 1GbE (eth0, etc1) and two 10GbE (eth2, eth3) NICs per node. The 1GbE NICs will not be placed into service, but the customer wants the network to be preconfigured for their eventual use.

The consultant removes the 1GbE NIC from the default bond and creates a second bridge(br1), but is unable to add the 1GbE NIC using the below command:

manage_ovs –bridge_name br1 –interfaces 1g –bond_name br1-up update_uplinks

Which parameter is missing from this command?

Options:

A.

--bond_duplex full

B.

--require_link=false

C.

--interfaces eth0

D.

--bridge_duplex full

Buy Now
Questions 62

The following critical Availability Alert displays in prism Central:

NCS-Core Question 62

The protection Policy PP-BCA-1HR includes a business critical application with a 1-hour snapshot frequency.

What is causing this issue?

Options:

A.

There is a scheduled outage for the Availability Zone referenced in Protection Policy PP-BCA-1HR.

B.

Workloads included in PP-BCA-1HR are no longer within their intended RPO.

C.

Prism Central in the Availability Zone for PP-BCA-1HR is unavailable.

D.

NearSync replication between the Availability Zones has fallen out of scope.

Buy Now
Questions 63

An administrator wants to utilize Network Visualization to monitor the physical and logical network on the Nutanix cluster. The first-hop switch has LLDP enabled. The network switch information is still not being displayed.

What is causing this problem?

Options:

A.

The ISL between switches is not configured.

B.

SNMP is not configured properly.

C.

br0 and br1 are not defined.

D.

The cluster is using RDMA-enabled NICs.

Buy Now
Questions 64

A customer has the following requirement for a Nutanix cluster:

  • Must support high-performance Nutanix Volumes iSCSI workloads
  • Must utilize AHV nodes
  • Must use 10 GbE interface

How should the customer optimize networking?

Options:

A.

Enable Jumbo Frame on just the Host

B.

Convert Cluster to ESXi and enable Jumbo Frame on Host and CVM

C.

Enable Jumbo Frames on just the CVM

D.

Enable the use of Jumbo Frame on Host and CVM

Buy Now
Questions 65

After a consultant runs a bare metal Foundation, the imaging process fails.

In which two locations can the consultant find the logs? (Choose two.)

Options:

A.

On the CVM - /home /nutanix/foundation/logs

B.

On the Hypervisor - /home/nutanix/foundation/logs

C.

On the Foundation VM - /home/nutanix/foundation/logs

D.

View Logs link on the Foundation Imaging progress screen

Buy Now
Questions 66

A customer has a mail server and needs Nutanix to send email notifications about errors that might occur in Prism. The following information is included under SMTP Server Settings

◦IP Address of mail server

◦Port Security Mode

◦From email address

What should the consultant set up before arriving onsite?

Options:

A.

SMTP server to allow emails from all IPs in customer network

B.

SMTP server to allow emails from Cluster VIP and CVM IP addresses

C.

SMTP to allow emails from Cluster VIP

D.

SMTP server to allow emails from Host IP addresses

Buy Now
Questions 67

An administrator is concerned that Prism will be inaccessible if Active Directory is unable to process logins. Which method should the administrator use to access the cluster in the event of this type of outage?

Options:

A.

Manage the cluster by using the "nutanix" user on the Prism leader CVM

B.

Create and use an emergency local account on the cluster

C.

Deploy an Active Directory server locally on the cluster

D.

Manage the cluster remotely by downloading ncli to a remote workstation

Buy Now
Questions 68

A consultant has been tasked with increasing security on a Nutanix cluster by disabling password authentication when accessing the CVM and AHV hosts and instead moving to key-based SSH.

What is the easiest way for the consultant to meet these requirements?

Options:

A.

Enable STlGs via command line on SSH to a CVM.

B.

Configure LDAP authentication through a secure server.

C.

Enable Cluster Lockdown and provide an RSA key.

D.

Restrict access with User Management in Prism.

Buy Now
Questions 69

During the Foundation imaging process, nodes are successfully imaged, but the cluster creation fails.

Which log should the consultant review to determine the cause?

Options:

A.

service.log

B.

foundation.out

C.

first_boot.log

D.

genesis.out

Buy Now
Questions 70

During the knowledge transfer session, a consultant conducts a storage management demo. In the Creating a Storage Container workflow, the customer notices the Advertised Capacity parameter and asks for an explanation.

How should the consultant respond?

Options:

A.

It is a capacity computed by dividing physical storage usage of a container by the replication factor (RF).

B.

It assists in reserving space for a storage container to ensure a maximum storage capacity is available.

C.

It enables the ability to cap usage of storage containers to be smaller than the limit of a storage pool capacity.

D.

It assists in reserving space for a storage container to ensure a minimum storage capacity is available.

Buy Now
Questions 71

A systems administrator needs to add more VMs to their Nutanix cluster.

Which two actions should the administrator perform to determine if the current cluster can accommodate the new VMs? (Choose two.)

Options:

A.

Perform an Inventory with Life Cycle Management.

B.

Determine utilization with Cluster Runway.

C.

Enable Deduplication and Erasure Coding.

D.

Utilize Optimize Resources for VM efficiency.

Buy Now
Questions 72

Over the period of 2 to 3 weeks, a cluster displays the following:

•Periods where Warning Alerts of memory usage over 75% are asserted

•Periods where Critical Warnings of memory usage over 90% are asserted

•Periods of slow of frozen VDI desktops have caused work stoppage or slowdown

•VDI clones have periodically not powered up when called, causing work stoppage

Which steps should be used to prioritize the administrator’s troubleshooting efforts?

Options:

A.

•Assess resource health on Hardware page

•Review the Analysis page for memory usage demand

•Determine the VDI workload-to-host affinity across the cluster

B.

•Analyze Alert Pages for a root cause of memory problem

•Analyze VM table page to access the VM functionality

•Analyze the VDI Clone properties for possible VDI Workload stress

C.

•Check Analysis page for CPU demand

•Verify VDI workload property for memory subscription

•Review the Hardware page to determine if the cluster has sufficient RAM

D.

•Review Analysis Page for memory use pattern

•Alert with VDI workload demand

•Analyze current and future workload in the Capacity Runaway tab for sufficient resources

Buy Now
Questions 73

A customer has requested that a consultant create a Disaster Recovery Test for their new Nutanix environments.

What should the consultant include in a custom plan to validate VM availability across the network?

Options:

A.

Assign backup policies to source VMs.

B.

Verify VMs received correct IP address after failover.

C.

Ensure NTP configuration active.

D.

Sign into VM console using local credentials.

Buy Now
Questions 74

Refer to the exhibits.

An administrator has reported that a new VM is not performing well.

NCS-Core Question 74

NCS-Core Question 74

After analyzing the information presented in the exhibits, which option shows the best conclusion regarding this workload?

Options:

A.

VM is CPU constrained since the hypervisor cannot provide the required resources.

B.

VM is CPU constrained because more CPU needs to be added to the VM.

C.

VM is Storage constrained, because the workload is waiting for storage access.

D.

VM is not CPU constrained, because the VM is not running, a multithreaded application.

Buy Now
Questions 75

A consultant is performing a Nutanix Cluster installation on Dell XC Core hardware. The consultant decides to use Foundation Portable for Mac to perform the installation. When the consultant arrives onsite, Foundation Portable is unable to locate the new nodes.

Which log should the consultant check to troubleshoot this issue?

Options:

A.

/home/nutanix/foundation/log

B.

~/data/logs/foundation.out

C.

foundation.app/contents/resouces/log

D.

~/data/logs/foundation

Buy Now
Questions 76

Refer to the exhibit.

NCS-Core Question 76

On a four-node NX-3460 cluster, two 10G NiCs are connected to redundant Cisco ToR 5K switches as shown in the first exhibit Port On a four-node NX-3460 cluster, two 10G NICs are connected to redundant Cisco TOR Sk switches as shown in the fist exthibt. Port failover must be tested.

The network configuration output from the CVM is shown in the second exhibit. To test fallover, a shut command is executed on the switchport that connects the node to the 5k1 switch.

Refer to the exhibit.

NCS-Core Question 76

Options:

A.

Active link is disconnected. Passive link takes over.

B.

Passive link is disconnected. Active link takes over.

C.

Active link takes over. HA Failover takes place.

D.

Passive link takes over. HA Failover takes place.

Buy Now
Questions 77

An administrator needs to replace the self-signed certificate on a cluster. Which two requirements must be met as part of the process? (Choose two.)

Options:

A.

The cluster administrator must restart the interface gateway.

B.

The signed, intermediate and root certificates are chained.

C.

The existing certificate must be deleted prior to replacement.

D.

The imported files for the custom certificate must be PEM encoded.

Buy Now
Questions 78

An administrator needs to replace an aging SAN and move to a hyper-converged infrastructure. The existing environment consists of the following hosts that are connected to the SAN:

• 5xAIX hosts

• 3x Hyper-V hosts

• 9xESXi hosts

• 2x physical SQL Clusters (Windows Server 2012R2 hosts)

After deploying a Nutanix AHV cluster, which two actions should the administrator take to meet the requirements? (Choose two.)

Options:

A.

Deploy Volumes to support the AIX and SQL workloads.

B.

Migrate the ESXI workloads to AHV using Move.

C.

Deploy Files to support the AIX hosts.

D.

Migrate the ESXi and Hyper-V workloads using Move.

Buy Now
Questions 79

As a consultant concludes the project for deploying a new cluster, the customer expresses plans to repeat the process in-house for one of the company's dark site locations.

What three items can the consultant deliver in closing to help ensure customer's success in deploying and supporting Nutanix clusters?

Options:

A.

. Creating an account for access to Nutanix Support Portal

· External USB drive

. Offline NCC bundle

B.

· A trial license activation code for Prism Starter

. Creating an account for access to Nutanix Support Portal

. Guide for dark site deployments using Nutanix standards

C.

. Generating cluster licenses

. What are binaries and where can they be downloaded

. Creating an account for accessing the Nutanix Support Portal

D.

· External USB drive

. Access to Nutanix FTP

. Encrypted key required for accessing clusters

Buy Now
Questions 80

The installation process stops before imaging any of the nodes and an error message is displayed notifying the IPMI IP address is unreachable.

What should consultant do to fix the issue?

Options:

A.

Ensure the Foundation VM is not in the same broadcast domain as the Controller VMs.

B.

Re-try Foundation using a non-flat switch.

C.

Check the service. log and the individual node log files for more detailed information.

D.

if the nodes are in the same subnet go to the Cluster page and configure multi-homing.

Buy Now
Questions 81

An organization is planning an upgrade to AOS 5.15 and wants to understand which cluster products and/or services are supported for physical traffic isolation.

Which Nutanix component supports its network traffic being isolated onto its own virtual network?

Options:

A.

Volumes

B.

Objects

C.

Containers

D.

Files

Buy Now
Questions 82

During a technical call with a customer, it is identified that this installation will be software only on Dell servers. The out-of-band management interfaces will not be given IP addresses until the consultant is onsite.

Which Foundation method should be used for this type of installation?

Options:

A.

Bare metal using iDRAC MAC addresses.

B.

Bare metal using LAN MAC addresses.

C.

Bare metal using block serial numbers.

D.

Bare metal using node serial numbers.

Buy Now
Questions 83

A consultant is planning to use a flat switch for installation.

What is the network requirement for Foundation VM, CVM, Hypervisor, and IPMI

Options:

A.

Foundation VM, CVM, and Hypervisor must be on the same subnet. IPMI can be on a different subnet.

B.

CVM, Hypervisor, and IPMI must be on the same subnet. Foundation VM can be on a different subnet.

C.

Foundation VM and CVM must be on the same subnet. Hypervisor and IPMI can be on a different subnet.

D.

Foundation VM, CVM, and IPMI must be on the same subnet. Hypervisor can be on a different subnet.

Buy Now
Questions 84

After reviewing the questionnaire provided by a customer, the consultant is completing the Foundation Configuration on the Nutanix website. According to the customer requirements, the cluster should be prepared off site in a safe room, and moved afterwards to the datacenter.

Which configuration should the consultant implement on the Foundation VM?

NCS-Core Question 84

Options:

A.

Add « virtual switch dedicated to the IPMI network.

B.

Prepare multi-homing with two IP addresses.

C.

another physical laptop port to the Foundation VM.

D.

Create a firewall rule blocking customer subnets.

Buy Now
Questions 85

What are the two most important prerequisites to be validated before the consultant goes onsite? (Choose two.)

Options:

A.

Complete the kickoff call and validate the BOM (Bill of Materials).

B.

Verify whether the servers have been racked by the customer.

C.

Validate whether the cluster questionnaire is complete and if the physical switch configurations are complete.

D.

Identify the point of contact who can provide networking details and switch port information after arriving onsite.

Buy Now
Questions 86

After the successful creation of clusters, the customer wants to ensure that alerts are sent automatically to Nutanix support.

Which Nutanix feature should the consultant ensure is enabled?

Options:

A.

Support Portal

B.

Pulse

C.

insights

D.

Support Tunnel

Buy Now
Questions 87

A customer needs to meet the following requirements for their business critical application:

* SQL Servers must be on specific hosts to lower licensing costs.

* Oracle RAC servers must be on separate hosts for licensing reasons

Which policy or policies should be implemented to meet these requirements?

Options:

A.

Configure VM-VM anti-affinity policy.

B.

Configure VM-VM affinity policy.

C.

Configure both VM-Host and VM-VM affinity policy.

D.

Configure VM-Host affinity policy.

Buy Now
Questions 88

After installation, network ports are properly configured with the default active-backup bonding.

One 10GbE port goes to switch 1. Another 10GbE port goes to switch 2. A consultant tests failover by manually pulling one of the cables and notices it is taking too much time to failover, which is causing excessive packet loss.

What should the consultant enable to resolve this issue?

Options:

A.

LACP on switch

B.

PAgP

C.

Portfast

D.

Jumbo frames

Buy Now
Questions 89

Refer to the exhibit. NCS-Core Question 89

An administrator logged into Prism Element, notices the following in the home dashboard, and showing the exhibit.

Which action should the administrator take next?

Options:

A.

Configure the fqdn for the hosts indicated

B.

Troubleshoot the zookeeper server issue

C.

Re-run NCC specifying data_resiliency_check

D.

Check the hardware page for disk failures

Buy Now
Questions 90

A customer has engaged a Nutanix consultant to deploy a cluster consisting of two NX-3460-G6 blocks. The consultant arrives at the customer site and fines the following:

* One rack with a total of 5U available

* Two ToR switches with 14 total available ports

* Dual PDUs with six available sockets

What will prevent the consultant from successfully installing the cluster?

Options:

A.

Insufficient sockets for power allocation.

Rack space may not be continuous.

B.

Insufficient rack space for block installation.

Insufficient sockets for power allocation.

C.

Insufficient network ports for communication.

Insufficient sockets for power allocation.

D.

Insufficient network ports for communication.

Insufficient sockets for power allocation.

E.

Insufficient network ports for communication.

Rack space may not be continuous.

Buy Now
Exam Code: NCS-Core
Exam Name: Nutanix Certified Services Core Infrastructure Professional (NCS-Core 6.8)
Last Update: May 17, 2024
Questions: 302

PDF + Testing Engine

$66.4  $165.99

Testing Engine

$46  $114.99
buy now NCS-Core testing engine

PDF (Q&A)

$42  $104.99
buy now NCS-Core pdf