Spring Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: pass65

210-010 VCE Vblock™ Systems Deployment and Implementation - Core Exam Questions and Answers

Questions 4

How many on-board unified ports does the Cisco Unified Computing System (UCS) 6296UP fabric interconnect provide?

Options:

A.

48

B.

62

C.

96

D.

97

Buy Now
Questions 5

A Vblock System is deployed by VCE using Unified Infrastructure Manager (UIM). During implementation, a problem is encountered that requires the configuration to be changed in the underlying element managers.

Which utility will allow the UIM database to resynchronize with the underlying element manager's changed configuration?

Options:

A.

Service Adoption Utility

B.

VMware Migration Manager

C.

Configuration Center

D.

VCE Vision Compliance Checker

Buy Now
Questions 6

What information is displayed when an administrator uses the show vsan membership command on a Cisco MDS switch?

Options:

A.

information for a specific VSAN

B.

membership information for all VSANs

C.

membership information for a specified VSAN

D.

zone database information for a specific VSAN

Buy Now
Questions 7

On a Vblock System 720 storage array, LUNs are presented to a server through a masking view.

Which three components are included? (Choose three.)

Options:

A.

initiator group

B.

storage group

C.

WWN group

D.

LUN group

E.

port group

Buy Now
Questions 8

You are deploying a Vblock System and want to install recent patches to the ESXi host(s).

Which VCE recommended method would you use to complete this task?

Options:

A.

esxcfg

B.

VMware Remote CLI power shell

C.

vicfg

D.

VMware Update Manager

Buy Now
Questions 9

You are deploying a Vblock System and you are unable to log in to the vCenter server using single sign-on (SSO).

Which two steps should be verified? (Choose two.)

Options:

A.

Log in credentials are correct.

B.

vCenter server is licensed.

C.

vCenter services are started.

D.

The single sign-on server is licensed.

Buy Now
Questions 10

Which Vblock System 320 component provides Fibre Channel network connectivity in a unified network architecture?

Options:

A.

Cisco MDS 9148

B.

Cisco Nexus 5548UP

C.

Cisco Nexus 1000V

D.

Cisco Catalyst 3750

Buy Now
Questions 11

According to VCE, which three statements are regarded as best practice for vMotion deployment? (Choose three.)

Options:

A.

On each host, configure a VMkernel port group for vMotion.

B.

VMKernel port must be on the virtual machine management network.

C.

Use one dedicated GbE adapter for vMotion.

D.

Ensure that virtual machines have access to the same subnets on source and destination hosts.

E.

Use jumbo frames configured through QoS.

Buy Now
Questions 12

What are three components of the Cisco UCS system that make up the Vblock System 320 compute layer? (Choose three.)

Options:

A.

X-Blade Data Movers

B.

fabric interconnect

C.

Cisco Nexus switch

D.

fabric extenders

E.

chassis

Buy Now
Questions 13

Which type of ODBC (DSN) connection is required for VMware Update Manager?

Options:

A.

Microsoft SQL 64 bit

B.

Microsoft SQL User DSN

C.

Microsoft SQL 32 bit DSN

D.

Microsoft File DSN

Buy Now
Questions 14

A customer uses EMC's Unified Infrastructure Manager (UIM) to deploy a Vblock System.

Which two post-deployment steps must the engineer take within Unified Computing System Manager (UCSM) to provide a VCE best-practice configuration? (Choose two.)

Options:

A.

Set the Fibre Channel QoS policy in service profiles.

B.

Set the host firmware package in service profiles.

C.

Associate the service profiles to blades

D.

Set enable failover for vNICs in service profiles.

Buy Now
Questions 15

You deploy EMC Ionix UIM/P in a Vblock System.

Which two prerequisites must be met before proceeding with deployment of the appliance? (Choose two.)

Options:

A.

vCenter Host Profiles configured

B.

static IP from the logical configuration survey

C.

EMC Ionix UIM/P OVF

D.

DHCP server

Buy Now
Questions 16

You observe that a host in a high availability (HA) cluster shows as disconnected within vCenter. The virtual machines running on the disconnected host have not automatically restarted as expected.

What is the cause of this problem?

Options:

A.

NTP was not configured on the HA cluster.

B.

vMotion is not enabled on the cluster hosts.

C.

The disconnected host was the master host.

D.

The host is still exchanging a data store heartbeat.

Buy Now
Questions 17

What are two supported link configurations between the Cisco 2208 I/O Module and the Cisco UCS 6296UP fabric interconnects for a Vblock System 320? (Choose two.)

Options:

A.

2

B.

4

C.

8

D.

16

Buy Now
Questions 18

What are two primary reasons for using the Advanced Management Pod (AMP)? (Choose two.)

Options:

A.

disaster recovery

B.

monitoring

C.

out-of-band-management

D.

multi-tenancy

Buy Now
Questions 19

A customer would like to add a new production VLAN to their Vblock System with UIM/P. The VLAN was added to the UIM/P service profile, and the connected Cisco Nexus 5000. The customer is still not able to use the new VLAN with a virtual machine.

Which step must the customer complete?

Options:

A.

Create a new VSAN.

B.

Add the VLAN to Cisco Nexus 1000V.

C.

Add the VLAN to Cisco Catalyst 3560.

D.

Disable spanning tree on UCS.

Buy Now
Questions 20

-- Exhibit --

210-010 Question 20 -- Exhibit --

Click the Exhibit button.

Which Vblock System 720 component is shown in the exhibit?

Options:

A.

Cisco Catalyst 3750-X

B.

Cisco Nexus 5596UP

C.

Cisco Catalyst 3650

D.

Cisco Nexus 5020

Buy Now
Questions 21

During a Vblock System 320 deployment, the customer wants to disassociate four half-width blades in a single chassis for a future project.

Which tool is used to perform this compute reconfiguration?

Options:

A.

vSphere

B.

CIMC

C.

Unisphere

D.

UCSM

Buy Now
Questions 22

You are installing a Vblock System 720 and notice that no Cisco UCS B230 blades are logging into the Cisco MDS 9148 switches.

Which feature must be enabled on the Cisco MDS 9148 to resolve the issue?

Options:

A.

NPIV

B.

TACACS+

C.

RADIUS

D.

NPV

Buy Now
Questions 23

Which two statements are correct about Vblock System Release Certification Matrix (RCM) upgrades? (Choose two.)

Options:

A.

The RCM must be applied by VCE certified resources.

B.

When upgrading to a new RCM, all components may not require an upgrade.

C.

The most recent RCM version must be applied.

D.

An addendum to the RCM may be issued to address a bug or software issue.

Buy Now
Questions 24

During a Vblock System logical build, which three configuration changes require Unified Computing System Manager (UCSM) access? (Choose three.)

Options:

A.

fabric interconnect interfaces

B.

ESXi host Network Time Protocol

C.

service profiles

D.

Cisco Nexus 1000V

E.

UCS Smart Call Home

Buy Now
Questions 25

You want to use vMotion to move the entire state of a running virtual machine between hosts over a dedicated vMotion network without service interruption.

What are two vMotion prerequisites before performing this task? (Choose two.)

Options:

A.

Verify that you have at least two ESXi hosts that are licensed for vMotion or are in evaluation mode

B.

Verify that you have running instances of vCenter Server and the ESXi hosts are in maintenance mode.

C.

Verify that hosts have access to shared storage of a supported type, such as Fibre Channel, iSCSI, or NAS

D.

Verify that the source and destination hosts have specific Intel x86 CPUs.

Buy Now
Questions 26

Which tool in the Advanced Management Pod (AMP) would a customer use to determine if their Vblock System is compliant with a specific Release Certification Matrix (RCM)?

Options:

A.

VMware Update Manager

B.

VCE Vision Intelligent Operations

C.

array management server

D.

VMware vCenter Server Inventory Service

Buy Now
Questions 27

On a Vblock System 720, what is the VCE supported tool used to manage a storage array?

Options:

A.

Unisphere for VMAX

B.

Ionix ControlCenter

C.

Symmetrix System Viewer

D.

Symmetrix Management Console

Buy Now
Questions 28

Where does a system administrator configure virtual machine affinity rules in VMware vCenter?

Options:

A.

HA settings

B.

DPM settings

C.

virtual machine settings

D.

DRS settings

Buy Now
Questions 29

-- Exhibit --

210-010 Question 29 -- Exhibit --

Click the Exhibit button.

Referring to the exhibit, which Vblock System 320 component is "B"?

Options:

A.

Cisco Nexus switch

B.

Cisco UCS fabric interconnect

C.

Cisco MDS switch

D.

Cisco fabric extender

Buy Now
Questions 30

A Vblock System 720 has been configured in the factory according to the VCE Logical Build Guide.

Which statement is correct?

Options:

A.

Each service-profile should have at least one vNIC pinned to fabric interconnect A; one vNIC pinned to fabric interconnect B, and failover enabled.

B.

Each service-profile should have at least one vNIC pinned to fabric interconnect A; one vNIC pinned to fabric interconnect B, and failover disabled.

C.

Each service-profile should have at least one vHBA pinned to fabric interconnect A; one vHBA pinned to fabric interconnect B, and failover enabled.

D.

Each service-profile should have at least one vHBA pinned to fabric interconnect A; one vHBA pinned to fabric interconnect B, and failover disabled.

Buy Now
Questions 31

During a Vblock System 200 deployment, a single server did not power on and a replacement has been received.

Which management interface is used to prepare the server for installation?

Options:

A.

vSphere

B.

CIMC

C.

Unisphere

D.

UCSM

Buy Now
Questions 32

-- Exhibit --

210-010 Question 32

-- Exhibit --

Click the Exhibit button.

Vblock Systems have multiple power connector capabilities.

Which power receptacle is shown in the exhibit?

Options:

A.

60A 250V, single phase (IEC 60309)

B.

60A 120V, 3 phase (IEC 60309)

C.

60A 250V, 3 phase (IEC 60309)

D.

30A 120V, 3 phase (C8303 L6-30P)

Buy Now
Questions 33

What is the boot LUN size for an ESXi installation on a Vblock System 320?

Options:

A.

10 GB

B.

20 GB

C.

40 GB

D.

60 GB

Buy Now
Questions 34

What are three hardware components that make up the high availability Advanced Management Pod (HA-AMP)? (Choose three.)

Options:

A.

Cisco Nexus 1000V

B.

Cisco Catalyst 3560

C.

EMC VNXe

D.

Cisco UCS C220

E.

Cisco Nexus 5548

Buy Now
Questions 35

An ESXi host connected to a Vblock System 720 storage array requires a new 2 TB LUN.

According to VCE best practice, which type of device must be created to add to the host?

Options:

A.

4 member striped meta

B.

4 member concatenated meta

C.

8 member striped meta

D.

8 member concatenated meta

Buy Now
Questions 36

What is the requirement for adding VLANs to port channels for disjointed Layer 2 networks in a Cisco UCS?

Options:

A.

VLANs must be explicitly assigned to an uplink.

B.

VLANs should not be explicitly assigned to an uplink.

C.

VLAN traffic must be allowed to travel over all uplinks.

D.

VLANs must be assigned in the 301-400 range.

Buy Now
Questions 37

Which test is only performed on a Vblock System 320 that contains a high availability Advanced Management Pod (HA-AMP)?

Options:

A.

Cisco blade server failure test

B.

Cisco UCS single power supply failure test

C.

Cisco Catalyst 3560 failure and recovery test

D.

Cisco UCS C220 failover test

Buy Now
Questions 38

A customer notices a failed drive error for a Vblock System 320 storage array on an EMC Unisphere screen.

Which logs must be collected and sent to VCE support to confirm that the drive has failed?

Options:

A.

SPcollects

B.

NAR files

C.

symapi.log

D.

EMC Grab

Buy Now
Exam Code: 210-010
Exam Name: VCE Vblock™ Systems Deployment and Implementation - Core Exam
Last Update: Apr 30, 2026
Questions: 128

PDF + Testing Engine

$63.52  $181.49

Testing Engine

$50.57  $144.49
buy now 210-010 testing engine

PDF (Q&A)

$43.57  $124.49
buy now 210-010 pdf