Summer Certification Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: pass65

300-615 Troubleshooting Cisco Data Center Infrastructure (300-615 DCIT) v1.1 Questions and Answers

Questions 4

300-615 Question 4

Refer to the exhibit. The expected routes are not being leaked as expected from VRF RED to VRF BLUE. Which action resolves the issue?

Options:

A.

Include the " le 32 " knob under the RED_TO_BLUE_ACL prefix list.

B.

Change the route targets under the VRFs.

C.

Configure VRF BLUE under the BGP configuration.

D.

Set the community to 65000:65000 under the route map.

Buy Now
Questions 5

Refer to the exhibit.

300-615 Question 5

A network engineer configures OSPF protocol between two Cisco Nexus 7000 Series Switches. The OSPF neighbors fail to synchronize OSPF databases. Which action resolves the issue?

Options:

A.

Match the OSPF area between the two devices.

B.

Configure the IP addresses of the interface in the same subnet.

C.

Change the OSPF area type to 2 on n7k-1.

D.

Set the same MTU values on both sides of the link.

Buy Now
Questions 6

Refer to the exhibit.

300-615 Question 6

The EEM script fails to send an SNMP trap when a user attempts to enter configuration mode. Which configuration is missing from the script?

Options:

A.

event statement

B.

event-default action statement

C.

policy-default action statement

D.

IP address of the SNMP server

Buy Now
Questions 7

Refer to the exhibit.

300-615 Question 7

The script fails to bring up Ethernet 1/2 when Ethernet 1/1 goes down. Which change

enables the script to run as intended?

Options:

A.

Set the port VLAN

B.

Include an action to manually shut down Ethernet 1/1

C.

Add an action to configure the terminal

D.

Configure an enable action

Buy Now
Questions 8

Refer to the exhibit.

300-615 Question 8

An engineer fails to implement a Cisco UCS Manager integration manager. The credentials and IP connectivity between Cisco APIC and UCS Manager are configured as expected. Which action resolves the issue?

Options:

A.

Disable HTTP to HTTPS redirection in Cisco UCS Manager

B.

Enable JSON API on the Cisco UCS Manager

C.

Change the Integration Manager name to FQDN of the Cisco UCS Manager

D.

Install ExternalSwitch app in the APIC controller

Buy Now
Questions 9

300-615 Question 9

Refer to the exhibit The Cisco UCS data center network is deployed as follows:

•The port to the CIFS is configured as an appliance

•VLAN 2025 is new and has been deployed on the VLAN appliances.

•The campus LAN can reach the resources on VLAN 2026, but fails to reach the CIFS storage on the newly added VLAN

•The appliance port remains in a " down " state, but the uplink port is in the " up " state to the campus LAN

Which action resolves the issue?

Options:

A.

Configure VLAN 2026

B.

Reconfigure VLAN 2025 under the vHBA template.

C.

Include a new VLAN on the appliance port

D.

Add VLAN 2025 to the vNIC template.

Buy Now
Questions 10

An upgrade of protected RPMs from the Bash shell did not take effect. Which action is required for the changes to take effect?

Options:

A.

Restart the Bash shell.

B.

Reload the switch.

C.

Upgrade the RPMs from the Guest shell.

D.

Disable and reenable the Bash feature.

Buy Now
Questions 11

Drag each item listed on the left to its proper category on the right Not all items will fit the categories.

300-615 Question 11

Options:

Buy Now
Questions 12

Refer to the exhibit.

300-615 Question 12

An EEM applet must be used to run a Python file called " Config " that enables all administratively disabled interfaces. The script fails to run as expected. Which command resolves the issue?

Options:

A.

action 1.0 cli local python Config.py

B.

action 1.0 cli local tclsh Config

C.

action 1.0 cli local tclsh Script_1

D.

action 1.0 cli local python Script_1.py

Buy Now
Questions 13

Refer to the exhibit.

300-615 Question 13

The scheduler was configured to save the running-config automatically daily. However, the scheduler is returning the error presented. Which action resolves the issue?

Options:

A.

Reconfigure the scheduler using the admin user

B.

Use the kstack attribute for copying the configuration file

C.

Remove vrf management from the command

D.

Change the file transfer protocol to TFTP in scheduler job

Buy Now
Questions 14

300-615 Question 14

Refer to the exhibit A network engineer fails to boot a Cisco UCS blade from SAN The data center uses Cisco UCS B-Series blades with the end-host mode configured on Cisco UCS fabric interconnects The storage administrator reports no issues with the array Winch action resolves the issue?

Options:

A.

Change zoning on the Cisco UCS side.

B.

Modify zoning on the upstream switch.

C.

Unmask the LUN on the storage array

D.

Remove the LUN ID from the boot policy

Buy Now
Questions 15

One of Cisco Nexus Series interfaces has become errdisabled with the error message “DCX-No ACK in 100 PDUs”. What is the cause of this error?

Options:

A.

The host has not responded to the Control Sub-TLV DCBX exchanges of the switch.

B.

The acknowledgement number in the server response has not incremented for 100 exchanges.

C.

Cisco Discovery Protocol is disabled on the switch.

D.

LLDP is disabled on the switch.

Buy Now
Questions 16

300-615 Question 16

Refer to the exhibit . During a maintenance window of the Nexus switch pair , one of the Cisco Nexus chassis was brought offline for maintenance . The primary Cisco Nexus switch was stable during the maintenance window . After finishing the

tasks on the chassis , the administrator wanted to bring the second switch online . The administrator checked the status of the disconnected switch that was removed from the vPC during the maintenance . The engineer must connect the peer chassis seamlessly with the primary vPC peer without experiencing traffic interruption . Which action accomplishes this goal ?

Options:

A.

Change the role priority, then connect the peer switch.

B.

Change the auto recovery to disabled, and enable auto recovery.

C.

Change the auto recovery timer to active if not already set, then re-establish the connectivity.

D.

Change the auto timer to a higher value, then connect the peer switch.

Buy Now
Questions 17

300-615 Question 17

300-615 Question 17

Refer to the exhibit. UCS- 1 fails to connect to the storage array. Which action resolves the issue?

Options:

A.

Set the FI-A mode to FC End Host mode.

B.

Enable N9K-1 mode to N-Port ID Virtualization.

C.

Configure N-Port ID Virtualization on FI-A.

D.

Implement N-Port Virtualization on N9K-1.

Buy Now
Questions 18

Refer to the exhibit.

300-615 Question 18

A blade server on UCS-1 fails to boot from SAN. The PWWNs of the server and the target device are in the fabric login database of the N9K-1. Which set of actions resolves the issue?

Options:

A.

Define LUN masking on the storage array.

B.

Set fabric binding based on the initiator PWWN and target PWWN.

C.

Reset HBA adapter 1/2/1 to reinitiate FLOGI.

D.

Configure zoning and activate the zone set.

Buy Now
Questions 19

Refer to an exhibit.

300-615 Question 19

An engineer is troubleshooting an upgrade failure on a switch. Which action resolves the issue?

Options:

A.

Save the system image in NVRAM.

B.

Use the same system image as the kickstart image.

C.

Load a new system image.

D.

Reload the same system image.

Buy Now
Questions 20

An engineer must replace a failed memory on a Cisco UCS B-Series Blade Server. After the replacement was done, the server has a “resolve slot” warning. Which server maintenance action resolves the issue?

Options:

A.

Perform diagnostic interrupt on the server.

B.

Re-acknowledgement the server.

C.

Reset the server.

D.

Decommission the server.

Buy Now
Questions 21

300-615 Question 21

Refer to the exhibit. A functioning trunk port Ethernet1/48 exists between two identical Cisco Nexus 5000 Series Switches. The interfaces on the switches support the MACsec feature and are configured identically. To enable manual MACsec, an engineer adds the configuration shown in the exhibit to both sides of the trunk. The trunk port stops functioning. Which action should be taken to resolve the issue?

Options:

A.

Disable and then enable the port

B.

Enable the license for the trunk ports to support MACsec

C.

Lower the MTU value to less than 9216 bytes

D.

Configure the PMK with a length of 2048 bytes

Buy Now
Questions 22

300-615 Question 22

Refer to the exhibit. An engineer discovered a VFC interface in a down state on a Cisco Nexus Switch. Which action resolves the problem?

Options:

A.

Change the cable between the switch and the server

B.

Reset the Cisco Nexus port toward the file server

C.

Update the CNA firmware and driver versions

D.

Modify the fip keepalive message time to 30 seconds

Buy Now
Questions 23

300-615 Question 23

Refer to the exhibit A Cisco UCS system (ails to access the storage array. Which two actions taken on both MDS switches resolve the issue? (Choose two.)

Configure a port channel with both interfaces as members

Options:

A.

Change the switch port mode to an E port

B.

Enable the (port-channel trunk feature

C.

Issue the no shutdown command on interface fct ' 24

D.

Replace the SFPs on interswitch links

Buy Now
Questions 24

Refer to the exhibit.

300-615 Question 24

A client reports that the routing protocol neighborship fails to start between two Cisco Nexus switches, N9K-1 and N9K-2. Which action resolves the issue?

Options:

A.

Add OSPF routing configuration to interface e1/1 on both Cisco Nexus switches

B.

Configure a unicast access list to allow the negotiation between N9K-1 and N9K-2

C.

Configure a multicast access list to allow the negotiation between N9K-1 and N9K-2

D.

Add MTU configuration to interface e1/1 on both Cisco Nexus switches

Buy Now
Questions 25

Refer to the exhibit.

300-615 Question 25

The connection between a Cisco Nexus 5548UP switch and a Cisco MDS switch fails to initialize. What is the cause of the issue?

Options:

A.

VSAN 1 is suspended.

B.

The SFP is unsupported.

C.

Trunk mode must be activated.

D.

The interface is in an incorrect mode.

Buy Now
Questions 26

Refer to the exhibit.

300-615 Question 26

An engineer performs a POST operation using REST API on the Cisco Nexus switch to retrieve a managed object, but the operation fails. Which configuration resolves the issue?

Options:

A.

https://172.16.10.1/api/node/mo/uni/tn-Test1.xml? rsp-subtree=full & rsp-prop-include=config-only

B.

icurl -k-v https:// 172.16.10.1/api/node/mo/uni/tn-Test1.xml? rsp-subtree=modified=config-only

C.

https:/ 172.16.10.1/api/node/mo/uni/tn-Test1.xml? rsp-subtree=modified=config-only

D.

icurl -k -v https://172.16.10.1/api/mo/uni.xml?rsp-subtree=no < fv Tenant name= " Test1 " / >

Buy Now
Questions 27

Refer to the exhibit.

300-615 Question 27

An engineer discovers that if the vPC peer link goes down, half of the devices in VLAN 20 experience connectivity issues with the external networks Which action resolves the issue?

Options:

A.

Configure a dedicated Layer 3 link between vPC peers

B.

Allow non-vPC VLANs on a second trunk between the two vPC peers

C.

Add the non-vPC SVIs in the dual-active exclude VLAN list

D.

Exclude the non-vPC VLANs from vPC peer link

Buy Now
Questions 28

An FSM failed during an upgrade with the auto-install feature enabled. The engineer must remove the service pack from the subordinate fabric interconnect (FI) to recover the Fls. Which set of commands resolves the issue?

Options:

A.

UCS-A# scope org

UCS-A/org # scope fw-infra-pack default

UCS-A /org/fw-infra-pack # set infra-bundle-version " "

UCS-A/org/fw-infra-pack* # commit-buffer

B.

UCS-A# scope fabric-interconnect b

UCS-A# /fabric-interconnect # remove service-pack

UCS-A# /fabric-interconnect* # commit-buffer

C.

UCS-A# scope org

UCS-A/org # scope fw-infra-pack default

UCS-A /org/fw-infra-pack # set infra-bundle-version

UCS-A# /fabric-interconnect # remove service-pack security

UCS-A# /fabric-interconnect* # commit-buffer

D.

UCS-A# scope fabric-interconnect b

UCS-A# /fabric-interconnect # remove service-pack security

UCS-A# /fabric-interconnect* # commit-buffer

Buy Now
Questions 29

Refer to the exhibit.

300-615 Question 29

The virtual machines running on Cisco UCS B-Series blades are experiencing performance issues that affect the network connectivity of the target application The issue is intermittent and affects only some of the connectivity sessions. Which action resolves the issue?

Options:

A.

Replace blades connected to HIF Eth4/V1 - 4

B.

Implement an I/O module firmware upgrade

C.

Replace the cable with a transceiver between the fabric interconnect and the switch

D.

Change the Cisco UCS MTU size to 9000 bytes

Buy Now
Questions 30

Refer to the exhibit.

300-615 Question 30

An OSPF adjacency between Router-A and Router-B cannot reach the FULL state. Which action resolves the issue?

Options:

A.

Adjust the MTU on Router-A to 1600.

B.

Disable the check of the MTU value.

C.

Set the OSPF media type to point-to-point.

D.

Adjust the MTU on Router-B to 1604.

Buy Now
Questions 31

Refer to the exhibit.

300-615 Question 31

An engineer is investigating a role mapping issue on a switch. The users report that they cannot view the IP addresses under the tenant “corp”. Which action resolves the issue?

Options:

A.

Add the users to the RADIUS server.

B.

Update the UNIX ID.

C.

Configure the correct secret password between the APIC and the RADIUS server.

D.

Add the updated avpair to include/corp/admin/

Buy Now
Questions 32

An engineer must configure Linux hosts that are deployed on Cisco UCS B-Series Servers to boot from SAN. The SAN boot policy is configured in Cisco UCS Manager, and the boot order is verified to be set as expected However, the Linux hosts fail to boot. Which action resolves the issue?

Options:

A.

Remove all of the local storage that is installed

B.

Delete and reconfigure the pWWN of the SAN boot target

C.

Remove all of the ISO images that are mounted as a virtual CD-ROM

D.

Delete and reconfigure the boot LUN

Buy Now
Questions 33

A server administrator attempts to change the Cisco IMC KVM certificate to one signed by a private CA, but the certificate is not being accepted. What can cause this process to fail?

Options:

A.

using a certificate with a password-protected private key

B.

RSA encryption being used in the generation of the certificate.

C.

AES encryption being used in the generation of the certificate.

D.

public IP addres of the Cisco IMC not being included in the SAN.

Buy Now
Questions 34

300-615 Question 34

Refer to the exhibit. A network engineer configured Cisco Nexus 9000 Series Switches to allow the traffic between 172.16.10.10/24 to 172.18.3.100/24 to pass through the 100G-link, but it fails. SW3 and SW4 are configured with the default OSPF configurations. Which configuration on SW1 resolves the issue?

Options:

A.

interface eth1/1

ip ospf cost 1

B.

interface eth1/1

auto-cost reference-bandwidth 10000

C.

interface eth1/2

auto-cost reference-bandwidth 1000

D.

interface eth1/2

ip ospf cost 5

Buy Now
Questions 35

Refer to the exhibit.

300-615 Question 35

The Fabric Interconnect fails to communicate with the storage device. Which type of port must interface fc2/3 be configured as to resolve the issue?

Options:

A.

FCoE uplink

B.

FC storage

C.

uplink

D.

appliance

Buy Now
Questions 36

Refer to the exhibit.

300-615 Question 36

Two Cisco Nexus 9000 Series Switches fail to establish OSPF neighborship. Which action resolves the issue?

Options:

A.

Enable interface VLAN 20 on SW2

B.

Set cos1 of interface EthlM0 to 40

C.

Configure Loopback0 as passive interface

D.

Change interface 1/11 network type as Broadcast

Buy Now
Questions 37

Refer to the exhibit.

300-615 Question 37

A recent configuration change removes the HSRP adjacency between the SW-1 and SW-2 Cisco Nexus switches. The change causes the servers on this subnet to lose Internet access. Which action restores the connectivity of all servers on VLAN 13?

Options:

A.

Disable HSRP IP redirects on SW-1.

B.

Set the HSRP priority to 70 on SW-1.

C.

Activate HSRP preempt on SW-2.

D.

Set the HSRP password on SW-2.

Buy Now
Questions 38

Refer to the exhibit A network administrator must provide Bash shell access to the support team for all of the Cisco Nexus 9000 Series Switches. The newly created user that is named " bashusers " fails to access the Bash shell. Which action resolves the issue?

Options:

A.

Associate bashusers with the Cisco NX-OS vdc-admin role and activate the nxapi feature.

B.

Associate bashusers with the Cisco NX-OS dev-ops role and activate the bash-shell feature.

C.

Associate bashusers with the Cisco NX-OS network-admin role and activate the guestshell feature.

D.

Associate bashusers with the Cisco NX-OS network-operator role and activate the bash-shell feature.

Buy Now
Questions 39

A maintenance operation on power rail A caused a reboot of the servers in a Cisco UCS B-Series chassis. The Cisco UCS system has these attributes:

* The system is equipped with four PSUs.

* N+1 mode is used.

* PSU 1 and 2 are connected to rail A.

* PSU 3 and 4 are connected to rail B.

Which action prevents server reboot when rail A goes down?

Options:

A.

Configure nonredundant mode with PSU1 and 3 on A and PSU2 and 4 on B.

B.

Use GRID mode; do not change physical plugs.

C.

Configure N+1 mode with PSU1 and 2 on B and PSU3 and 4 on A.

D.

Use N+2 mode; do not change physical plugs.

Buy Now
Questions 40

300-615 Question 40

Refer to the exhibit The EEM applet must generate a syslog message whena BGP adjacency flaps. This message must be displayed to the console of the switch. However, when a BGP adjacency failure is simulated, no syslog message is displayed. Which action resolves the issue?

Options:

A.

Add the event-default action statement.

B.

Modify the policy to use the snmp trap action.

C.

Adjust the policy to match an SNMP OID.

D.

Set the logging priority to Wamings.

Buy Now
Questions 41

300-615 Question 41

Refer to the exhibit. An engineer deploys a Cisco MDS 9000 Series Switch in a SAN. N9K-1 fails to learn the target WWNs and the interface fc1/4 fails to operate. The engineer collected this information about the environment:

MDS-A is configured as an NPV switch.

The WWNs of the storage array are present in the FLOGI database of MDS-A.

Interfaces fc1/3 and fc1/4 on MDS-A and N9K-1 are enabled.

Which set of actions resolves the issue?

Options:

A.

Assign fc1/3 as NP port on MDS-A and F port on fc1/4 N9K-1.

B.

Configure F port on MDS-A fc1/3 and N9K-1 fc1/4.

C.

On N9K-1, define fc1/4 as a trunk port and F port mode.

D.

Set 0x000001 FCID on N9K-1 and reset interface fc1/4.

Buy Now
Questions 42

Drag and drop the Cisco UCS SNMP fault types from the left onto the correct issues on the right.

300-615 Question 42

Options:

Buy Now
Questions 43

A mission-critical server is connected to site A. Connectivity to this server is lost from site B because the MAC route is missing in the OTV VDC of the Nexus 7000 in site B due to MAC aging. Which action allows the flooding of the unknown unicast MAC on the Nexus 7000 in the OTV VDC?

Options:

A.

Use route-map to advertise this MAC statically and redistribute with ISIS.

B.

Unknown unicast flooding is not allowed.

C.

Use the otv flood mac < > command to selectively flood traffic for a given MAC.

D.

Use the otv isis bfd < > command to configure BFD protocol.

Buy Now
Questions 44

300-615 Question 44

Refer to the exhibit. VSAN traffic is not routed as expected. Which action should be taken to resolve the issue?

Options:

A.

Reset the error packet counter

B.

Configure the hello timer to match the neighbor

C.

Configure the FSPF dead interval with a value higher than 80 seconds

D.

Reset the inactivity timer on switch-2

Buy Now
Questions 45

A user reports that they cannot reach from a UCS server to an FC Storage array. Which command is used to test communication between an FCF and a target?

Options:

A.

fcroute

B.

traceroute

C.

fcping

D.

ping

Buy Now
Questions 46

An engineer is troubleshooting a failed DCBX exchange between a server and a Cisco Nexus switch. Which action allows DCBX to successfully negotiate?

Options:

A.

Enable ETS

B.

Enable PFC.

C.

Enable Cisco Discovery Protocol.

D.

Enable LLDP.

Buy Now
Questions 47

A network engineer must connect a Cisco UCS Fabric Interconnect cluster to the Cisco ACI. VMware ESXi hypervisors have been installed on Cisco UCS blades and a VMware VMM domain has been configured. However, virtual machines fail to reach their default gateway in the Cisco ACI Fabric. The engineer investigates the issue and notices that the VMware Distributed Switch (VDS) teaming policy is set to " Route based on IP hash " . Which action resolves the issue?

Options:

A.

Configure the vSwitch Policy on the VMM domain.

B.

Disable the On-demand EPG resolution immediacy setting in ACI.

C.

Disable the VMware Network I/O Control on the VDS.

D.

Configure the vSwitch Policy on a VDS.

Buy Now
Questions 48

A Cisco Nexus Dashboard consists of a single master node and three worker nodes, and the dashboard is integrated with a Cisco ACI Multi-Site fabric. An engineer notices that the Cisco ACI site is unavailable on the Nexus Dashboard. Which action resolves the issue?

Options:

A.

Export APIC configuration before the site is onboarded.

B.

Replace the master and worker nodes.

C.

Reregister the site in the Nexus Dashboard GUI.

D.

Re-add a different master node to the physical cluster.

Buy Now
Questions 49

Refer to the exhibit.

300-615 Question 49

A Cisco UCS B-Series Blade Server is configured to boot from a shared storage via an iSCSI network. When a service profile is associated with the blade, the blade fails to attach the LUN. Which action resolves the issue?

Options:

A.

Place VLAN 0 on the interface that connects to the storage

B.

Register the blade as an initiator on the storage array

C.

Implement a Layer 3 connection between the blade and the storage

D.

Establish a Layer 2 connection between the blade and the storage

Buy Now
Questions 50

The VXLAN fabric is deployed with this configuration:

●The VLAN 50 interface has no IP address on VTEP1 and VTEP4.

●The VLAN 100 interface has no IP address on VTEP2 and VTEP3.

● nve1 interface is configured on all VTEPs.

Host A experiences timeouts when attempting to ping host B. Which set of actions allows host A to reach host B7

Options:

A.

On VTEP1, associate VNI 30000 to Test_ Telco VRF.

On VTEP4, associate VNI 20000 to Test_ Telco VRF.

B.

On VTEP2, associate VNI 55000 to Test Telco VRF.

On VTEP4, associate VNI 50000 to Test Telco VRF.

C.

On VTEP1, associate VNI 50000 to Test Telco VRFOn VTEP4, associate VNI 50000 to Test Telco VRF.

D.

On VTEP2, associate VNI 30000 to Test Telco VRF

On VTEP4, associate VNI 20000 to Test Telco VRF

Buy Now
Questions 51

300-615 Question 51

Refer to the exhibit. A network engineer is troubleshooting a Cisco Nexus 5000 Series Switch. The interface between the server and the switch is nonoperational and is expected to operate at 10 Gbps. The drain rate of the interface is 3 Mbps. Which action resolves the issue?

Options:

A.

Configure pause error-disable recovery

B.

Enable link level pause on the interface

C.

Reset priority flow counters

D.

Set priority flow control pause

Buy Now
Questions 52

A network engineer finds an error that says, " BIOS failed power-on self-test. " When the engineer checks the console, they discover that the Cisco UCS Blade firmware upgrade process stopped at the " Configuring and testing memory " stage.

Which set of actions resolves the issue?

Options:

A.

1. Add the CIMC firmware on a server.

2. Initialize the CIMC firmware on a server.

B.

1. Update the BIOS firmware on a server.

2. Activate the BIOS firmware on a server

C.

1. Create a new host firmware package.

2. Assign the host firmware package to the service profile template.

D.

1. Upgrade the firmware on an adapter.

2. Enable the firmware on an adapter.

Buy Now
Questions 53

Refer to the exhibits.

300-615 Question 53

300-615 Question 53

300-615 Question 53

An engineer troubleshoots switch N5K1, which fails to receive traffic from the file server Which set of actions resolves this problem?

Options:

A.

Bind native VLAN 10 with Ethemet1/10 and allow VSAN 101 in trunk configuration.

B.

Assign native VLAN 10 with vfc111 and allow VLAN 1101 in trunk configuration.

C.

Bind native VLAN 10 with Ethemet10/1/1 and allow VLAN 10 in trunk configuration

D.

Assign native VLAN 10 with fc2. ' l - 2 and allow VLAN 10 in trunk configuration.

Buy Now
Questions 54

A Cisco UCSB-Series Blade Server is configured to boot a VMwareESXi host from an EMC VNX storage array by using a Fibre Channel SAN. The boot order is confirmed to be configured as expected but the server fails to boot from the SAN. Which action reserves the problem?

Options:

A.

Set the same WWPN pools for vHBA adapters

B.

Set the boot LUN to the highest LUN ID in the storage array

C.

Set the boot LUN to the lowest LUN ID in the storage array

D.

Set the same WWNN pools for vHBA adaptor

Buy Now
Questions 55

Refer to the exhibit.

300-615 Question 55

The initiator that has FC ID 0x970102 fails to communicate with the target that has FC ID 0x970200. What action resolves the issue?

Options:

A.

Reconfigure the initiator and the target to be in the same zones.

B.

Reactivate the zoneset.

C.

Reset the port for FC ID 0x970102 and FC ID 0x970200 to log in to the fabric.

D.

Reset the port for FC ID 0x970209 and FC ID 0x9700c2 to log in to the fabric.

Buy Now
Questions 56

Refer to the Exhibit.

300-615 Question 56

An Engineer cannot log in to the Cisco IMC page of the Cisco UCS C220 server. Which action resolve the issue?

Options:

A.

Se the FQDN of the Cisco IMC webpage login page instead of the IP address for the connection to be secure.

B.

Use the DNS of the Cisco IMC webpage login page instead of the IP address for the connection to be secure.

C.

Replace the self-signed certificate that is installed on the Cisco IMC with a server certificate that is signed from the client corporate certificate.

D.

Replace the self-signed certificate that is installed on the Cisco IMC with a user certificate that is signed from the client corporate certificate.

Buy Now
Questions 57

The Cisco UCS Manager fails to integrate with Cisco Intersight. The requirement is to monitor and configure the UCS environment from UCS Manager as well as Cisco Intersight. However, Cisco Intersight can monitor only the managed devices. Which action resolves the issue?

Options:

A.

Set the Access Mode of Intersight Connector on the UCS to Allow Control.

B.

Allow Cisco IMC IP addresses of all the managed servers to reach Cisco Intersight.

C.

Update the NTP settings on all the devices that Intersight manages to be in the same time zone.

D.

Change the configured DNS server to resolve the Cisco Intersight IP address.

Buy Now
Questions 58

A customer configures HSRP between two data centers that are interconnected with OTV. The configuration succeeds, but traffic between two ESXi virtual hosts on the same site is routed suboptimally through the OTV overlay. Which two actions optimize the traffic? (Choose two.)

Options:

A.

Disable first-hop redundancy.

B.

Filter HSRP traffic by using a Layer 3 VACL on the OTV edge devices.

C.

Filter HSRP by using a Layer 2 MAC-list on the ESXi vSwitch.

D.

Filter HSRP traffic by using a Layer 3 VACL on the ESXi vSwitch.

E.

Filter HSRP by using a Layer 2 MAC-list on the OTV edge devices.

Buy Now
Questions 59

A fabric interconnect fails to start and the console displays the loader prompt. Which two actions resolve the issue? (Choose two.)

Options:

A.

Load an uncorrupt bootloader image.

B.

Load an uncorrupt kickstart image.

C.

Reconnect L1/L2 cables between the FIs.

D.

Reformat the fabric interconnect.

E.

Load the correct version of the boot image.

Buy Now
Questions 60

A network engineer notices a sudden interruption to the HSRP adjacency between the switches. The packet loss is reported on the servers for which the default gateway is set as the virtual IP of the HSRP. AII servers on

the VLAN can exchange ping messages. Which configuration set must be applied on the HSRP peers to resolve the adjacency issue?

Options:

A.

key 0 send-lifetime 00:00:00 Oct 01 2018 23:59:59 Sep 01 2020

B.

key 1 send-lifetime 00:00:00 Jun 01 2018 23:59:59 Sep 01 2022

C.

key1 accept-lifetime 00:00:00 Jun 01 2018 23:59:59 Sep 01 2020

D.

key 0 accept-lifetime 00:00:00 Oct 01 2018 23:59:59 Sep01 2020

Buy Now
Questions 61

Refer to the exhibit.

300-615 Question 61

300-615 Question 61

A network engineer needs to capture traffic from the VMs that utilize the IOM host interface Eth1/1/23 of a Cisco UCS B-Series chassis. A traffic analyzer is used to get traffic captured from the Eth1/4 interface of the subordinate fabric interconnect. The network engineer notices that traffic is not captured on the traffic analyzer. Which action resolves the issue?

Options:

A.

Span the traffic from the Eth 1/2 of the subordinate fabric interconnect.

B.

Span the traffic from the Eth 1/4 of the subordinate fabric interconnect.

C.

Span the traffic from the Eth 1/2 of the primary fabric interconnect.

D.

Span the traffic from the Eth 1/4 of the primary fabric interconnect.

Buy Now
Questions 62

A system administrator adds two vNICs to an existing service profile that is used to run a vSphere environment to support disjoint Layer 2 network connectivity. However, after the server is rebooted, the host is not accessible on the network Which action resolves the issue?

Options:

A.

Remove all existing vNICs and add them in the desired order.

B.

Build a new service profile with the desired network configuration

C.

Add the disjoint Layer 2 VLANs to an existing vNIC rather than adding new vNICs

D.

Create a vNIC placement policy to avoid adapter renumbering

Buy Now
Questions 63

Refer to the exhibit.

300-615 Question 63

A newly deployed Cisco APIC1 fails to discover a Cisco Nexus Series Switch. Which configuration resolves the issue?

Options:

A.

Leaf101#(config)# no boot nxos

Leaf101# copy running-config startup-config

Leaf101# reload

B.

APIC1# acidiag touch clean

APIC1# acidiag touch setup

APIC1# acidiag reboot

C.

Leaf101# setup-clean-config.sh

Leaf101# reload

D.

APIC1# acidiag restart mgmt

PIC1# acidiag reboot

Buy Now
Questions 64

300-615 Question 64

Refer to the exhibit. A SAN engineer must enforce the port security configuration database in Fibre Channel fabric that uses Cisco MDS 9000 Switches. Port security is enabled on the VSAN to which the port belongs. However, the rogue host can still log in to the fabric. Which Cisco MDS command resolves the issue?

300-615 Question 64

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Buy Now
Questions 65

Refer to the exhibit.

300-615 Question 65

A Cisco ACI fabric has a VPC policy group toward the external switch. These objects exist inside the fabric:

port channel policy LACP_Active_NoControl

NetFlow monitor policy NetFlow_POL

port channel member policy transmit rate as fast

The engineer must set the LACP timeout to 1 second. However, the engineer notices that the LACP timeout is set to 30 seconds on the CLI. Which action resolves the issue?

Options:

A.

Add policy NetFlow_Pol to Synergy-18_Bay-3_MGMT_VPC_PolGrp.

B.

Attach policy LACP_Active_NoControl to override policy.

C.

Assign override policy LACP_fast to Eth1_9_IntSel.

D.

Change port-channel member policy transmit rate to normal.

Buy Now
Questions 66

Refer to the exhibit.

300-615 Question 66

A Cisco UCS Fabric Interconnect fails during the upgrade process. The working images of the fabric interconnect are stored on the bootflash. Which set of commands recovers the fabric interconnect?

Options:

A.

loader > dir

loader > boot ucs-6300-k9-kickstart.5.0.2.N1.3.02d56.bin

switch(boot)# init system

switch(boot)# reload

switch(boot)# load ucs-6300-k9-system.5.0.2.N1.3.02d56.bin

B.

loader > dir

loader > boot ucs-6300-k9-kickstart.5.0.2.N1.3.02d56.bin

switch(boot)# copy ics-manager-k9.1.4.1k.bin nuova-sim-mgmt-nsg.0.1.001.bin

switch(boot)# boot ucs-6300-k9-system.5.0.2.N1.3.02d56.bin

C.

loader > dir

loader > boot ucs-6300-k9-kickstart.5.0.2.N1.3.02d56.bin

switch(boot)# init system

switch(boot)# reload

switch(boot)# boot ucs-6300-k9-system.5.0.2.N1.3.02d56.bin

D.

loader > dir

loader > boot ucs-6300-k9-kickstart.5.0.2.N1.3.02d56.bin

switch(boot)# copy ics-manager-k9.1.4.1k.bin nuova-sim-mgmt-nsg.0.1.001.bin

switch(boot)# load ucs-6300-k9-system.5.0.2.N1.3.02d56.bin

Buy Now
Exam Code: 300-615
Exam Name: Troubleshooting Cisco Data Center Infrastructure (300-615 DCIT) v1.1
Last Update: Jun 16, 2026
Questions: 221

PDF + Testing Engine

$64.99   $185.69

Testing Engine

$49.99   $142.83

PDF (Q&A)

$54.99   $157.11