Questions 4

You have planned, tested, and performed a Jira upgrade.

The upgrade appeared to be a success; however, after several hours of use, your users are reporting

significant problems and you decide to roll back.

Which two effects do you expect to see after the rollback? (Choose two.)

Options:

A.

Emails will automatically be sent out to tell people about the rollback.

B.

New issues entered between upgrade and rollback will be lost.

C.

The color scheme will be set back to default to indicate there was a rollback.

D.

Jira will go back to the same schemes as before the upgrade.

E.

Jira will need to be reconnected to other systems it was integrated with.

Buy Now
Questions 5

You are designing a complex new workflow. Two of the requirements are listed below:

1. Any user should be able to trigger the Put On Hold transition from any status in the workflow.

2. Only users with the Close Issues permission should be able to Close the issue at any point in the flow.

Based only on these requirements, which two workflow elements should you use? (Choose two.)

Options:

A.

Global Transitions

B.

Conditions

C.

Triggers

D.

Validators

E.

Common Transitions

Buy Now
Questions 6

Your business owners have told you to use roles as much as possible in Jira because it allows them to do things that groups cannot do.

When considering this, you need to be aware of those actions in Jira that require the use of groups rather than roles.

Identify two actions in Jira that require the use of groups. (Choose two.)

Options:

A.

allowing users to use transitions in all the workflows

B.

granting Project Administration rights

C.

granting permissions to teams coming from Active Directory

D.

defining Issue Security levels

E.

granting system administrative rights

F.

controlling who can perform Bulk Change in a project

Buy Now
Questions 7

Tom has asked you why the numbers returned by his searches are not right. He shows you three JQL queries:

ACP-100 Question 7

How can you fix this?

Options:

A.

Change the query to project = “Cake Baking” and fixVersion ~ 1.1.0.

B.

Change the query to project = “Cake Baking” and ( fixVersion is empty or fixVersion != 1.1.0 ).

C.

Rename the versions so they do not contain periods.

D.

Identify the missing issues and change the permissions so that everyone can see them.

E.

Change the query to project = “Cake Baking” and fixVersion not in (1.1.0).

Buy Now
Questions 8

You have two issue types in your HR project: Hire and Fire.

Which two requirements can be met through changes only to field configurations? (Choose two.)

Options:

A.

For the Fire issue type, the Description field should have a default value of “Termination”.

B.

For both issue types, the Employee Name custom field must be required upon creation and must never be

blank.

C.

For the Hire issue type, the field description for the Due Date field should read “First day of work”.

D.

For both issue types, the Resolution should be set once the issues are being resolved.

E.

For both issue types, the Assignee field should be hidden when creating but not when viewing an issue.

F.

For the Fire issue type, the default value for the Priority field should be Blocker.

Buy Now
Questions 9

Martin has Create Attachments permission in a software project, but he cannot attach anything to issues in Approved status.

What is the problem?

Options:

A.

There is a workflow step property configured.

B.

He is not a member of a security level.

C.

There is a workflow condition configured.

D.

The Attachment field is missing from the screen for that issue type.

E.

He does not have the correct project permission.

Buy Now
Questions 10

A team complains that many of their issues are in the Closed status, but do not have a resolution set, which

causes problems with reporting. The project uses a single workflow.

You want to set the resolution to Done on all existing issues in the Closed status.

Which combination of workflow elements and a bulk operation will achieve this?

Options:

A.

A temporary transition and a trigger

An Edit Issues bulk operation

B.

A temporary transition and a post function

A Transition Issues bulk operation

C.

A screen and the Resolution field

A Move Issues bulk operation

D.

A screen and a custom field

An Edit Issues bulk operation

E.

A temporary transition and a screen

An Edit Issues bulk operation

Buy Now
Exam Code: ACP-100
Exam Name: Jira Administrator Exam
Last Update: May 4, 2024
Questions: 72

PDF + Testing Engine

$66.4  $165.99

Testing Engine

$46  $114.99
buy now ACP-100 testing engine

PDF (Q&A)

$42  $104.99
buy now ACP-100 pdf