According to IEEE C57.12.00, a durable, metal, name plate shall be affixed to each transformer by the:
During the course of manufacturing the supplier/vendor may propose design changes that could impact cost, schedule and/or quality. In such cases, the source inspector should:
What is the purpose of an equipment risk assessment in the source inspection process?
What document provides information on design and installation of electrical systems for fixed and floating offshore petroleum facilities for unclassified and Class I, Zone 0, Zone 1 and Zone 2 locations?
In a Class I hazardous area, what is the maximum distance from an enclosure, containing arcing devices should a conduit seal be located?
Inspections, examinations, and tests must be performed in accordance with the source Inspection Test Plan, project specification, applicable codes and standards and meet:
According to API 541, determination of efficiency and power, locked-rotor current, power factor, torque, full-load current and slip are some of the tests verified when performing a:
According to NFPA 70, installed conductor insulation temperature rating shall be a required marking on what type of system?
Final inspection and shipping preparations of switchgear typically consists of verifying all of the following except:
Which information should be included at a minimum in a source inspection report?
What is the purpose of labeling the temperature range on electrical equipment used in a Class I hazardous area?
Which document should identify the inspection activities to be performed by the assigned source inspector and include the applicable acceptance criteria?
During switchgear source inspection, which item must be verified to prevent opening a medium-voltage door when the isolation switch handle is in the full ON position?
According to API 541, the combined runout for areas on the shaft that are to be observed by radial vibration probes shall not exceed:
Which of the following is listed as a typical transformer inspection point in the guide?
According to the referenced API standard in the guide, special purpose induction motors covered by API STD 541 are:
According to API 541, when shall the vendor provide calculated data from the final witness testing?
Each source inspection assignment should have a detailed Inspection and Test Plan ITP which identifies the:
What standard is used for the installation of signaling and communications conductors, equipment, and raceways?
According to API 541, subsequent to completion of manufacture and testing, the vendor shall revise and resubmit the previously supplied purchase data including all the following except:
What method is used to verify tightness of accessible bolted electrical connections?
According to NFPA 70, is the use of Teflon tape on threaded connections for conduits allowed?
According to API 541, totally enclosed machines TEFC, TEPV, TEWAC, and TEAAC are equipped with which of the following?
Which referenced standard in the guide applies to metal-enclosed low-voltage power circuit breaker switchgear?