You can determine when an output is to be issued. The following times are available: There are 3 correct answers to this question.
Which settings can be maintained in the transportation requirement type Customizing?
There are 2 correct answers to this question.
Which of the following SAP TM and SAP ERP objects can you map?
There are 2 correct answers to this question.
Which of the following objects can you select using selection profiles?
Note; There are 2 correct answers to this question
You have flagged "GIS quality" for your means of transport, LORRY, to calculate distances and durations accurately based on GIS (geographical-information-system). In which of the following apps/customizing tasks can you define durations that impact the scheduling of a freight order using means of transport LORRY?
Note: There are 2 correct answers to this question.
Let's say that you want to define the freight unit building rules that the system uses when dealing with dangerous goods and with goods that are not dangerous. Basically, there are three things to consider, as follows:
There are 3 correct answers to this question
Which of the following functions can a carrier perform in the collaboration portal? Note: there are 2 correct answers to this question.
What is launched using output determination. Output condition records are configured to allow messages to be sent? Please choose the correct answer.
Which of the following document can you use as a basis for creating freight units? (2 correct answer)
Which of the following driver management settings are maintained in freight order customization?
Which of the following elements are part of the transportation network?
There are 3 correct answers to this question.
Response:
You want to configure a scenario in which one trailer is coupled subsequently to different trucks. Which of the following must you customize? Note: there are 2 correct answers to this question.
Which of the following incompatibility types can you use in the Automatic and Manual Planning incompatibility area?
Note: There are 2 correct answers to this question.
Which communication methods can you use in SAP S/4HANA Supply Chain for Transportation Management to interact with a carrier when tendering freight orders? Note: There are 3 correct answers to this question.
If output has been triggered successfully, two monitoring transactions are available to reveiw the status of message prcessing, as follow (2 correct answer)
You are not able to create a service entry sheet (SES) in SAP ERP from a freight settlement document. Which of the following element should you check in SAP ERP to identify the error?
Which of the following can you define for a means of transport?
There are 3 correct answers to this question.
The Core Interface (CIF) is important for its role in which of these processes: Please choose the correct answer.
You want to create packages in a freight order using the package building function. Where do you assign the corresponding package building profile?
The updated FSD updates the PO and SES in SAP ERP with the revised charges using the SAP ERP update strategy in the settlement profile, as follows:
(3 correct answers)
You have defined several means of transport (MTR) combinations.
If food is loaded on the truck, you cannot transport hazardous goods in a coupled trailer. Furthermore, these hazardous goods cannot be transported on certain means of transport.
Which of the following incompatibility types do you use to model this scenario?
There are 2 correct answers to this question.
How can a user consider carrier reliability when selecting a carrier for a freight order? Note: There are 2 correct answers to this question.
A carrier has responded to your request for quotation but was NOT automatically assigned to the freight order. What could be the reason for this?
There are 2 correct answers to this question.
You want to set up charge calculation for freight orders. Valid charges should consist of a based on the distance and gross weight of the freight order, and a supplemental charge per container that is included in the freight order. Multiple containers are allowed for each freight order, and the charge is based on the container type can be small, medium or large. What is the minimum number of charge lines with instruction type "standard" that you must set up?