Questions 4

A business analyst (BA) has developed requirements for a project containing sensitive information. The requirements were approved and the solution was implemented. What should the BA do to ensure these requirements are maintained for future reference?

Options:

A.

Print the requirements package and distribute it to stakeholders in person

B.

Archive the requirements package in the business analysis portal

C.

Store the requirements package on secure shared drive

D.

Send the requirements package to stakeholder in a password protected email

Buy Now
Questions 5

After an initial project kick-off meeting, the business analyst (BA) determined that the project has a short deadline and a regulatory mandate with stiff penalties for non-compliance. The stakeholders do not want to risk missing the deadline, and management is willing to commit any amount of resources to meet the deadline. Which kind of approach is suitable for the initiative?

Options:

A.

Crystal clear development process

B.

Kanban development process

C.

Predictive development process

D.

Adaptive development process

Buy Now
Questions 6

A business analyst (BA) is planning how to present a set of requirements for a project with financial constraints. Which requirements attribute should the BA assign to allow cost implications to be assessed?

Options:

A.

Status

B.

Complexity

C.

Ownership

D.

Source

Buy Now
Questions 7

A business analyst (BA) is facilitating a meeting with subject matter experts (SMEs) in which the SMEs are answering questions about the major business processes and associated activities the business performs. The BA will create a deliverable from this discussion that will assist in defining scope. What technique is the BA using?

Options:

A.

Decision modelling

B.

SWOT analysis

C.

Mind mapping

D.

Functional decomposition

Buy Now
Questions 8

A business analyst (BA) elicits requirements from end users for a new application, and then completes a set of use cases and use case scenarios. What should the BA do next?

Options:

A.

Identify all the roles and responsibilities

B.

Review the use case scenarios

C.

Conduct a requirements workshop

D.

Create acceptance and evaluation

Buy Now
Questions 9

The Chief Information Officer (CIO) of a large financial services firm with many technology applications was formally reviewing all ongoing projects and noticed that the requirements were complex and difficult to follow. The CIO asks the business analyst (6A) what would improve the stakeholder's ability to understand the requirements. Which of the following will improve the requirements quality?

Options:

A.

Traceability matrices

B.

IEEE /ISO 29148 requirements standards

C.

Additional requirements attributes

D.

Matrix documentation formats

Buy Now
Questions 10

A project team needs to maintain the traceability of requirements for a software system. Due to the large number of requirements, which of the following methods should the team use?

Options:

A.

Use a requirements management tool

B.

Create a requirements mode

C.

Maintain the requirements manually

D.

Develop a database management system

Buy Now
Questions 11

Market studies projected a 28% year over year growth for five (5) years for commercial vehicle loans. A company that provides lending for commercial vehicles wanted to keep up with industry demand; however, their applications were not capable of scaling to the increased demand for loan processing and billing. The company is deploying a new system to meet the demand. The project started five (5) years ago and cost S2 million USD. The project metrics are to be evaluated after five (5) years. The return on investment (ROI) for the project is calculated at 11%. The project sponsors are upset that the desired ROI for the project was not met. The actual demand for commercial vehicle loans for the past five (5) years is as follows:

Options:

A.

Risk planning

B.

flowed assumptions

C.

Demand forecasting

D.

Capability planning

Buy Now
Questions 12

Before selecting a design solution, a company wants to ensure that stakeholder, solution, and transition requirements align to the business requirements and also that the design satisfies the requirements. What process is the business analyst (BA) completing?

Options:

A.

Requirements Verification

B.

Requirements Elicitation

C.

Requirements Engineering

D.

Requirements Validation

Buy Now
Questions 13

A business analyst (BA) conducted a requirements elicitation session with project stakeholders and communicated the results. The project sponsor expressed concern with certain requirements that address the federal government legislation. What must the BA do to address the concern of the project sponsor?

Options:

A.

Compare requirements with compliance requirements

B.

Determine the communication plan for requirements

C.

Reassure the project sponsor that testing will be conducted diligently

D.

Ensure requirements are traceable up to user acceptance testing

Buy Now
Questions 14

A business analyst (BA) is preparing an analysis approach to replace a 12-year-old air traffic control system. The BA aims to define the solution definition before implementation, capture the information in standardized templates, and ensure that all activities are identified first and then divided into tasks. Which approach provides the appropriate level of formality for this project?

Options:

A.

Predictive

B.

Reactive

C.

Proactive

D.

Adaptive

Buy Now
Questions 15

During a senior management meeting about a project at the requirements analysis stage, a business analyst (BA) stated that there were a number of workarounds associated with the current application. The Chief Information Officer (CIO) was looking for ways to improve the situation and the BA suggests a solution. Which of the following can the BA suggest that the organization consider to increase efficiencies?

Options:

A.

Process improvement

B.

Strategy realignment

C.

Capability assessment

D.

Project abandonment

Buy Now
Questions 16

Stakeholders must be able to determine the audit and approval history of requirements and designs. Which of the following provides a means to document traceability and change?

Options:

A.

Risk analysis and management

B.

legal and regulatory information

C.

Requirements management tools

D.

Acceptance and evaluation criteria

Buy Now
Questions 17

The business analyst (BA) is helping the business stakeholders prioritize requirements for a new customer portal for managing orders, delivery, and payment information. A number of requirements address compliance with regulations regarding access for people with disabilities. What factor should the BA use to guide the stakeholders when assigning a priority for these specific requirements?

Options:

A.

Dependencies

B.

Penalties

C.

Risk

D.

Stability

Buy Now
Questions 18

A business analyst (BA) plans to organize a focus group to bring all the interested parties together and discuss the issues and possible risks for the new initiative. Due to the geographical differences of each participant a videoconferencing service will be used to satisfy stakeholder preferences. Which approach is the BA defining?

Options:

A.

Stakeholder analysis

B.

Issue management

C.

Release planning

D.

Stakeholder collaboration

Buy Now
Questions 19

A business owner has identified a high priority requirement that needs to be implemented immediately. The project manager has asked the business analyst (BA) to perform an impact analysis of this change. Which factor will the BA need to consider?

Options:

A.

Number of systems being affected by the requirement

B.

Original source of the requirement

C.

Method of requirement communication

D.

Selection of the elicitation for the requirement

Buy Now
Questions 20

A finance manager wants to begin a new project to replace the existing expenses processing system. The finance manager feels that the current expense submission-to-reimbursement process takes too long and is substantiated by 50% more complaints regarding incorrect reimbursement amounts than the same time last year. What should the business analyst (BA) investigate first?

Options:

A.

Submission processes to determine which activities can be fully automated

B.

Business process to uncover inefficiencies and falling control points

C.

Enterprise information model to ensure definitions are still valid

D.

Finance solution vendors for inclusion in a Request for information

Buy Now
Questions 21

Which of the following is a business management strategy originally developed by Motorola, USA in 1986?

Options:

A.

Quality Circle

B.

Waterfall model

C.

Lean

D.

Six Sigma

Buy Now
Questions 22

A senior business analyst (BA) must review the requirements specification of a junior BA. The senior BA puts together a list of key evaluation criteria to guide the determination of a requirement's quality. Which of the criteria below is a characteristic of a quality requirement?

Options:

A.

Atomic

B.

Owned

C.

Mapped

D.

Allocated

Buy Now
Questions 23

You are the business analyst for your organization and your requirements for the endeavor have recently been approved. Your organization creates a baseline for the requirements based on the approval of the requirements. What must happen in your business analysis activities if the requirements for your endeavor need to be changed?

Options:

A.

You'll need to create new baselines.

B.

You'll need to implement configuration management.

C.

You'll need to use a change control system.

D.

You'll need to create requirements versioning.

Buy Now
Questions 24

You are the business analyst for your organization and you're working with the project manager to complete some business analysis activities. The project manager has the authority to approve the requirements based on the short iterations of business analysis activities.

What approach of business analysis are you using in this scenario?

Options:

A.

Progressive elaboration

B.

Change-driven

C.

Plan-driven

D.

Iterative

Buy Now
Questions 25

When a business analyst completes the task of organizing requirements, he is completing two key objectives. What are the two objectives?

Options:

A.

The business analyst should categorize the requirements first by functional or non-functional decomposition and then structure the categories by identified prioritization elements.

B.

The business analyst should strive to find logic in the organizational structure and to establish a prioritization approach on key elements.

C.

The business analyst should aim to understand which models are appropriate for the business domain and solution scope and to identify model interrelationships and dependencies.

D.

The business analyst should work with stakeholders to organize defined categories and then to structure each category by a key performance indicator.

Buy Now
Questions 26

You are currently working on creating the activity list for an initiative in your organization. What characteristic must be assigned to each task in your task list?

Options:

A.

Procurement needs

B.

Risk level

C.

Unique number

D.

Roles and responsibilities

Buy Now
Questions 27

You are the business analyst for your organization and you're creating the requirements package. In this documentation, to what level should you document the requirements for your stakeholders?

Options:

A.

All requirements should be clearly defined with technical, business, functional, and non-functional attributes.

B.

All requirements should be defined only to the extent needed to assure understanding by the team.

C.

All requirements should be defined to the extent the organizational process assets demand.

D.

All requirements should be defined in detail to the work package level of WBS.

Buy Now
Questions 28

Which of the following is used as a means of validating a created, selected, or tailored business analysis approach?

Options:

A.

Process modeling

B.

Progressive elaboration

C.

Decision analysis

D.

Structured walkthrough

Buy Now
Questions 29

You are the business analyst for your organization and you're performing the solution assessment process. When you assess a solution, what are you actually looking for?

Options:

A.

To determine the value of the proposed solution to the stakeholder requirements

B.

To determine the quality of the proposed solution to the stakeholder requirements

C.

To determine the cost of the proposed solution to the stakeholder requirements

D.

To determine the accuracy of the proposed solution to the stakeholder requirements

Buy Now
Questions 30

A business analyst (BA) is working on a data-centric IT project. The business stakeholders develop the content but do not understand the technical aspects while the IT team believes that there is no need to understand the business issues. Which deliverable will facilitate understanding between IT and the business stakeholders?

Options:

A.

Data models

B.

Data dictionary

C.

Transition requirements

D.

Non-functional requirements

Buy Now
Questions 31

A key stakeholder has requested an extensive range of performance measures for a replacement workflow system. A business analyst (BA) has decided to work closely with the stakeholder to validate the performance measures requested. The BA will be ensuring that the performance measures:

Options:

A.

are ether qualitative or quantitative measurements, but not both.

B.

align to industry benchmarks gathered for similar solution implementations.

C.

are written in the correct format. using the agreed standards and terminology.

D.

align with other measures within the broader context of the solution.

Buy Now
Questions 32

Jason is creating a business case for his organization and management has asked him to assess the appropriate risks in the business case regarding the solution. Which one of the following risks is not a concern for Jason when defining the business case and associated risks?

Options:

A.

Financial risk

B.

Positive risk

C.

Organizational risk

D.

Technical risk

Buy Now
Questions 33

You are the business analyst for your organization and you're training Marcy, a new business analyst, on how requirements are defined. Which one of the following best describes how requirements are defined?

Options:

A.

Stakeholders' needs, wants, and expectations

B.

Risk and reward solution

C.

Change-driven approach

D.

Solutions-based approach

Buy Now
Questions 34

You are the business analyst for your organization and you're working with Nancy, the Sales Director. You've been identifying requirements for Nancy about the sales force and her desire to add a customer management solution to the sales process. Nancy believes that the software can help automate the sales process, keep things better organized than the current approach, and ultimately create more sales for the organization. As a business analyst, which one of the following should you advise Nancy about her need?

Options:

A.

There's an assumption that the perceived solution will create the desired benefit.

B.

There are no constraints in the analysis process.

C.

There is a cost, time, and quality constraint that must be satisfied to create the solution.

D.

There will be a cost and time element to create the solution.

Buy Now
Questions 35

Billy is the business analyst for her organization and she's working with a team to select a model. Richard doesn't understand why a model is needed for the requirements. Which one of the following statements best describes the reason to use a model?

Options:

A.

Models abstract and simplify reality.

B.

Models restrict the effect, risk, cost, and schedule of the solution.

C.

Models define the solution in time, cost, space, and logistics.

D.

Models show the complete solution in a non-functional slice of the organization.

Buy Now
Questions 36

You are the business analyst for your organization. You've believed that your solution can actually be purchased from outside vendor rather than trying to create the solution internally. You decide to ask the vendor to provide a fee for their services based on the statement of work. What document will you give the vendor along with the statement of work?

Options:

A.

Request for quote

B.

Contract terms

C.

Request for proposal

D.

Purchase order

Buy Now
Questions 37

What business analysis process is needed to define the solution scope and prepare the business plan for the endeavor?

Options:

A.

Verify requirements.

B.

Define requirements management and communication.

C.

Prioritize requirements.

D.

Determine solution approach.

Buy Now
Questions 38

In order to assess proposed solutions, business analysts will need three inputs. Which one of the following is not an input to the task of assessing proposed solutions?

Options:

A.

Solution options

B.

Requirements

C.

Risk assessments

D.

Assumptions and constraints

Buy Now
Questions 39

A business analyst is studying the cost of the endeavor in relation to the projected income the endeavor will bring once the project is completed. What financial valuation technique can the business analyst use to determine the breakeven point for the project?

Options:

A.

Payback period

B.

Average rate of return

C.

Cost-benefit analysis

D.

Discounted cash flow

Buy Now
Questions 40

As a business analyst, you should be able to identify the characteristics of each business analysis task and domain area. Which one of the following statements best describes the characteristics of the business analysis knowledge area of requirements analysis?

Options:

A.

It describes the activities and considerations for managing and expressing requirements to a broad and diverse audience.

B.

It describes the business analysis activities necessary to identify a business need, problem, or opportunity, define the nature of a solution that meets that need, and justify the investment necessary to deliver that solution.

C.

It describes the tasks and techniques used by a business analyst to analyze stated requirements in order to define the required capabilities of a potential solution that will fulfill stakeholder needs.

D.

It is the act of eliciting business, stakeholder, solution, or transition requirements.

Buy Now
Questions 41

Holly is the business analyst for her organization and she's leading a requirements workshop for a proposed solution. In this workshop, Holly is using a requirements tracing matrix to help prevent against scope creep. What is scope creep?

Options:

A.

It's the removal of the things that don't conform to the quality of the requirements.

B.

It's the addition of the things that aren't needed to consume the project budget.

C.

It's the addition of the things that don't trace back to the original project scope.

D.

It's the addition of the deliverables that don't trace back to the original business goals to the project scope.

Buy Now
Questions 42

Which one of the following statements best describes what an assumption is?

Options:

A.

These are the things that may restrict the options for the endeavor.

B.

The weather will always be hot in the summer and cool in the winter.

C.

The project must be completed by December 18.

D.

These are things that are believed to be true, but they have not yet been confirmed.

Buy Now
Questions 43

Which task in the requirements analysis knowledge area is best described as ensuring that the requirements specifications and models meet the necessary standard of quality to allow them to be used effectively to guide further work?

Options:

A.

Defining assumptions and constraints

B.

Organizing requirements

C.

Specifying and modeling requirements

D.

Requirements verification

Buy Now
Questions 44

A business analyst has just completed an elicitation event. What stakeholder(s) is/are involved in the documentation of the elicitation results?

Options:

A.

Business analyst and key stakeholders

B.

Business analyst

C.

Project manager, project team, and business analyst

D.

Project manager, business analyst, and project sponsor

Buy Now
Questions 45

If a requirement has been satisfied, why is it still considered a requirement?

Options:

A.

A requirement is considered a requirement as long as the requirement may be able to be changed.

B.

Requirements are considered requirements even if the requirements have been satisfied.

C.

A requirement is considered valid as long as the business stakeholders need it.

D.

If a requirement has been satisfied, it is no longer a requirement and should be purged from the requirements set.

Buy Now
Questions 46

You are the business analyst for your organization and you are completing the manage requirements traceability process. You are tracking the requirements to determine how the requirements are interrelated with one another and with the actual delivery of the project scope.

There are actually three reasons why the business analyst should trace requirements. Which one of the following is not one of the three reasons why trace requirements are useful?

Options:

A.

Requirements allocation

B.

Requirements coverage

C.

Quality control

D.

Impact analysis

Buy Now
Questions 47

As a business analyst in your organization, you must understand the difference between operative rules and structural rules. What is the difference between structural rules and operative rules?

Options:

A.

Structural rules are rules that the organization chooses to enforce as a matter of policy. Operative rules are intended to help determine when something is or is not true, or when things fall into a specific category.

B.

Operative rules are rules that the organization chooses to enforce as a matter of policy. Structural rules are intended to help determine when something is or is not true, or when things fall into a specific category.

C.

Operative rules are rules that describe the organizational process assets of the organization. Structural rules are policies that restrict the authority of each line of business.

D.

Operative rules are rules that define how an organization operates. Structural rules define the boundaries of the structure, business units, and departments within the organization.

Buy Now
Questions 48

Enterprise analysis creates just five outputs. Which one of the following is an output of the enterprise analysis tasks?

Options:

A.

Stakeholder concerns

B.

Solution approach

C.

Solution performance assessment

D.

Assumptions and constraints

Buy Now
Questions 49

A project to implement shared registration procedures across multiple jurisdictions has stalled several times. The new business analyst (BA) assigned to the project used a collaborative game to elicit requirements. What effect was the BA attempting to achieve?

Options:

A.

Minimal variance from planned effort

B.

Close alignment with corporate values

C.

Stimulate teamwork in a fun situation

D.

High confidence in conclusions

Buy Now
Questions 50

You are the business analyst for your organization and you've been working with several stakeholders to

gather requirements for approval.

The requirements have been approved with the exception of a conflict on one requirement. What must you and the stakeholders do in regard to this conflict before the business analysis endeavor may continue?

Options:

A.

The requirement with the conflict should be excluded from the approved set of requirements and must be resolved before it can be joined to the approved set of requirements.

B.

The conflict must be documented as a risk.

C.

The conflict must be resolved before the set of requirements may be approved.

D.

The conflict must be documented in an issues log, assigned to an issue owner, and then the endeavor may continue.

Buy Now
Questions 51

You are the business analyst for your organization and you're creating a business analysis communication management plan. In your plan, you want to address the different locales and culture and the communication needs that may affect the business analysis approach. Which one of the following elements should not be included in the cultural analysis of the plan?

Options:

A.

Relationship to task completion

B.

Relationship to authority

C.

Relationship to religion

D.

Relationship to time

Buy Now
Questions 52

You are a business analyst for your organization. Your current business analysis endeavor includes working with stakeholders located in offices around the world. Because these stakeholders are dispersed, what is likely to increase in this endeavor as opposed to a collocated group of stakeholders?

Options:

A.

Costs

B.

Face-to-face meetings

C.

Communication needs

D.

Risks

Buy Now
Questions 53

You are the business analyst for your organization and are working on organizing the identified requirements for a new solution. Nancy, your assistant in this process, says that these requirements aren't very complex. You agree but add that it's this thing that makes the overall solution complex. What thing adds to the level of complexity among requirements?

Options:

A.

Relationships among the requirements

B.

Management in the project

C.

Cost and schedule constraints

D.

Stakeholders in the project

Buy Now
Questions 54

Which approach is used to focus on minimizing up-front uncertainty?

Options:

A.

Class-driven approach

B.

Change driven approach

C.

Solution-driven approach

D.

Plan-driven approach

Buy Now
Questions 55

What does the decomposition of activities and tasks based on the work breakdown structure create for the business analyst?

Options:

A.

Activity list

B.

Business analysis plan

C.

Network diagram

D.

Project management plan

Buy Now
Questions 56

You are the business analyst for your organization. Management has asked that you create a method to store the project requirements including those under development, under review, and the requirements which have been approved. What is management asking you to create?

Options:

A.

A change management system

B.

A repository

C.

Requirements register

D.

A project scope statement

Buy Now
Questions 57

Which one of the following terms is not a business analysis planning and monitoring approach?

Options:

A.

Structured walkthroughs

B.

Decision analysis

C.

Requirements elicitation

D.

Process modeling

Buy Now
Questions 58

There are many stakeholders that need to be involved in the allocated requirements. One of the stakeholders in the task will be responsible for verifying released and solution components. Which stakeholder has this

responsibility?

Options:

A.

Project team

B.

Project manager

C.

Operational support

D.

Tester

Buy Now
Questions 59

The project plan called for deliverables to be handed over at the end of the project. Although the client's business team was satisfied, the client's technical team was extremely resistant to this approach. What could the business analyst (BA) do to mitigate the technical team’s resistance?

Options:

A.

Escalate to project sponsor

B.

Meet with technical team

C.

Reassess the project objectives

D.

Email the business team

Buy Now
Questions 60

You are the business analyst in your organization and you're working to organize the requirements for the business units in your company. Which technique is best suited for structuring requirements around the needs of each stakeholder group?

Options:

A.

Organizational modeling

B.

User stories

C.

Data modeling

D.

Functional decomposition

Buy Now
Questions 61

You have been assigned as the Project Manager for a new project that involves the development of a new interface for your existing time management system. You would like to plan the communications that need to be made during the project lifecycle. Which of the following would be a critical tool/technique to help in your communications planning?

Options:

A.

RAM Chart

B.

Affinity Diagram

C.

Stakeholder Analysis

D.

Text-Oriented Chart

Buy Now
Questions 62

As a business analyst, you must identify activities in your business analysis approach. Which one of the following is useful for identifying activities?

Options:

A.

Project management input

B.

BABOK

C.

A list of deliverables

D.

WBS

Buy Now
Questions 63

There are three business analysis planning techniques that a business analyst can use to help plan business analysis processes. Which one of the following is not one of the three techniques?

Options:

A.

Process modeling

B.

Progressive elaboration

C.

Decision analysis

D.

Structured walkthrough

Buy Now
Questions 64

If you're a business analyst and using an event-based elicitation task, such as a requirements workshop, what can be considered as essential to establish with the participants?

Options:

A.

Cost management

B.

Deadlines

C.

Ground rules

D.

Purpose of the workshop

Buy Now
Questions 65

The process of defining the business need uses one output. What is it?

Options:

A.

Feasibility study

B.

Solution scope

C.

Business need

D.

Capability gaps

Buy Now
Questions 66

Complete this sentence in regard to the level of abstraction. Requirements need to say needs to be done, not to do it.

Options:

A.

What, when

B.

Requirements, who needs

C.

What, how

D.

Requirements, how much

Buy Now
Questions 67

Complete this sentence. If a requirement cannot be verified, it cannot be successfully .

Options:

A.

Scheduled

B.

Estimated

C.

Assigned

D.

Implemented

Buy Now
Questions 68

Complete this statement. are longer-term, ongoing, and qualitative statements of a state or condition that the organization is seeking to establish and maintain.

Options:

A.

Objectives

B.

Goals

C.

Requirements

D.

Operations

Buy Now
Questions 69

There are four inputs to the plan business analysis activities. Which one of the following is not an input to the plan business analysis activities process?

Options:

A.

Stakeholder list, roles, and responsibilities

B.

Organizational process assets

C.

Business analysis approach

D.

List of identified risks

Buy Now
Questions 70

There are three inputs needed to determine the solution approach process. What are these inputs?

Options:

A.

Business need, organizational process assets, and enterprise environmental factors

B.

Business need, enterprise environmental factors, and required capability

C.

Business need, organizational process assets, and assumptions

D.

Business need, organizational process assets, and required capability

Buy Now
Questions 71

When a business analyst is using alternative generation, what should she always include as an output?

Options:

A.

The cost of all requirements, some requirements, and a few core requirements

B.

The schedule of implementation for each solution

C.

The option of doing nothing

D.

The cost of each solution

Buy Now
Questions 72

A business analyst (BA) is assessing the completeness and coherence of the requirements. The BA has considered a variety of viewpoints and has a collection of views. What has the BA constructed?

Options:

A.

Requirements architecture

B.

Requirements traceability matrix

C.

Business knowledge model

D.

Solution design

Buy Now
Questions 73

A business analyst has determined that a project should be worth $2,750,000 in four years if her company decides to pursue the project. Assuming the rate of return on the investment is six percent, what is the minimum amount of funds the organization should invest in this project?

Options:

A.

$2,585,000.00

B.

$2,749,001.99

C.

$2,178,257.57

D.

$165,000

Buy Now
Questions 74

Which of the following defines all of the features and functions of the thing, solution, or service the project or organization will create?

Options:

A.

Requirements envisioning

B.

Project scope

C.

Requirements foundation

D.

Product scope

Buy Now
Questions 75

Shelly is the business analyst for her organization and she's working with Thomas to review the business requirements. They are discussing the identified requirements, how the requirements will transition to the operations, and the longevity of the solution. Thomas is concerned that the identified requirements may not map to the desired future state of the organization. What business analysis task is Shelly facilitating in this scenario?

Options:

A.

Acceptance evaluation criteria definition

B.

Requirements quality assurance

C.

Validate requirements

D.

Stakeholder management

Buy Now
Questions 76

What condition of the requirements must be fulfilled in order to use the matrix documentation approach to specify and model requirements?

Options:

A.

The requirements must have opposing values.

B.

The requirements must have common characteristics.

C.

The requirements must have the uniform structure.

D.

The requirements must have rated goals, such as time, cost, and quality.

Buy Now
Questions 77

You are a business analyst for your organization and you're working with the stakeholders to identify the primary inputs to the business analysis approach. Which of the following will help determine whether a plan- driven or change-driven approach is appropriate?

Each correct answer represents a complete solution.

Options:

A.

Organizational process assets

B.

Expert Judgement

C.

Business need

D.

Penalty of not seizing the opportunity

Buy Now
Questions 78

Kelly is the business analyst for her organization and she's identifying roles and responsibilities of the people involved in business analysis activities. Her manager has asked Kelly to create the RACI matrix to accomplish this task. What is the RACI matrix?

Options:

A.

The RACI matrix is a roles and responsibilities chart that uses the legend of Responsible, Action, Controlled, and Informed.

B.

The RACI matrix is a roles and responsibilities chart that uses the legend of Role, Action, Controlled, and Information.

C.

The RACI matrix is a roles and responsibilities chart that uses the legend of Responsible, Accountable, Consulted, and Informed.

D.

The RACI matrix is a roles and responsibilities chart that uses the legend of Risk, Action, Cost, and Information.

Buy Now
Questions 79

A project team member is confused about why a small change requires the team to look at the different enterprise-level business objectives when a desired state can be achieved easily without this analysis. What can the business analyst (6A) do to help the team member understand?

Options:

A.

Impact analysis helps gain critical thinking to achieve the desired solution.

B.

Detailed assessments might result in future success of other projects

C.

Proper analysis from difference aspects in required to select the best solution.

D.

When funding is available for extra analysis the project team need to use it.

Buy Now
Questions 80

An organization is experiencing long contracting life cycles when establishing annual contracts with its customers. Upon initial investigation, the outdated application was thought to be the cause, however based on further analysis the business process is found to be flawed. The business analyst (BA) wants to model the people involved in the process. Which of the following techniques models the responsibilities of these stakeholders?

Options:

A.

Roles and Permissions Matric

B.

Data Flow Diagram

C.

Use Cases and Scenarios

D.

Activity Flow

Buy Now
Questions 81

A business owner has marked certain requirements as high priority for the upcoming release. After performing some analysis, the project team concluded that some of these requirements are not actually high priority and can be implemented in later releases. How should the project team proceed with prioritizing requirements?

Options:

A.

Change the priority of the requirements by performing are ranking

B.

Consult with the business owner to discuss possible trade-oils

C.

Implement the requirements that the project team considers important

D.

Execute the requirements that the business owner identified

Buy Now
Questions 82

A business analyst (BA), analyzing requirements, has decomposed information into components. What is the purpose of this exercise?

Options:

A.

To enable discussion regarding solution options

B.

To plan project iterations

C.

To plan test cases for the components

D.

To identify the project sponsor

Buy Now
Questions 83

The claims intake workflow of an insurance company is being standardized across all branch offices. The business analyst (BA) assigned to this project has interviewed users individually in all the offices and plans to schedule a workshop with all the users. What should the BA do to prepare for the workshop?

Options:

A.

Create a process model

B.

Develop a work breakdown structure

C.

Build an entity-relationship diagram

D.

Construct a decision tree

Buy Now
Questions 84

An organization has identified a market opportunity that could result in significant business gains. A business analyst (BA) is asked to assist in building the new business model. The BA begins by analyzing the current state. What input is critical to the current state analysis?

Options:

A.

Goals and objectives

B.

Organizational culture

C.

Risks and assumptions

D.

Business needs

Buy Now
Questions 85

A company wants to launch a new product that will have similar features to an existing product. A business analyst (BA) working on the project has invited the product manager to explain the features and business rules of the new product. Which activity must the BA perform in preparation of the session?

Options:

A.

Align the scope of the project to the company’s strategy

B.

Review information about the existing project

C.

Ensure requirements are traceable

D.

Determine the communication plan for requirements

Buy Now
Questions 86

A business analyst (BA) is working on a project to improve product delivery. The issues arise during the latter stages of the delivery Freecycle and are due to poor communication of the business analysis information from the elicitation phase. As a result, a BA has ensured that the testing and training teams are identified as stakeholders on the RACI Matrix going forward. To which RAG designation should the training and testing teams be added?

Options:

A.

Consulted

B.

Responsible

C.

Accountable

D.

Informed

Buy Now
Questions 87

Stakeholders initially agreed to an implementation schedule for a set of reports based on the value to business users. The development team provided a detailed estimate of the time required to develop each report based on the business requirements. What should the business analyst (BA) and the stakeholders do with the estimates?

Options:

A.

Revise the business requirements

B.

Write functional report specifications

C.

Review the priorities

D.

Analyze technical constraints

Buy Now
Questions 88

The Chief Executive Officer (CEO) of a company presents a new corporate strategy that will introduce a new system to the organization. The CEO has expressed a concern about the impact to the staff once the strategy has been implemented. What must the business analyst (BA) do to address concerns of the CEO?

Options:

A.

Identify required cultural changes

B.

Perform a cost-benefit analysis of the strategy

C.

Ensure requirements are easily accessible

D.

Align the new capabilities to the company's architecture

Buy Now
Questions 89

A business analyst (BA) has elicited the following requirement; "The solution must ensure the portal response times are under 2 seconds." What requirement classification schema does this requirement belong to?

Options:

A.

Nonfunctional requirements

B.

Stakeholder requirements

C.

Transitional requirements

D.

functional requirements

Buy Now
Questions 90

A business analyst (BA) is managing stakeholder collaboration to ensure positive reactions are capitalized upon. There is uncertainty as to whether the correct stakeholders have been identified. Which technique can be used to correct this situation?

Options:

A.

Functional decomposition

B.

Lessons learned

C.

Risk analysis

D.

Interviews

Buy Now
Questions 91

A business analyst (BA) is working on a project for a media company. The BA has verified, validated, and prioritized the requirements based on business benefits. During the development phase, the team discovered that the current viewer will no longer be supported by the provider. The technical team needs to either upgrade to the newer version with different technology or find an alternate viewer. Given this new information, what is the next step for the BA?

Options:

A.

Assess the impacts and re-prioritize the requirements based on technical constraints

B.

Continue the project as it is currently important to focus on customer satisfaction

C.

Convince stakeholders that the business benefits are unachievable due to technical constraints

D.

Communicate the technical constraints to customers

Buy Now
Questions 92

After a walk-through of the requirements specification with the business users, the group determines that five requirements are now mandatory due to new government regulations. What should the business analyst (BA) do following the meeting?

Options:

A.

Update the priority of the requirements and record the reason for doing so

B.

Ask the test analyst to ensure that test cases are only written to cover the new requirements

C.

Escalate the decision to the project manager to confirm with all users again

D.

Help the system analyst create a prototype of the requirements to demo to the users

Buy Now
Questions 93

A project to replace a financial system uses a waterfall methodology. Initially, meetings with the project subject

matter experts (SMEs) were positive. As the project progressed through the requirements and design phases, the SMEs attended fewer meetings, resulting in a delay to the project build phase. What should the business analyst (BA) have done to prevent the delay?

Options:

A.

Selected a different project methodology

B.

Requested new SMEs participate in the project

C.

Modified the governance structure

D.

Engaged in consistent collaboration

Buy Now
Questions 94

After a number of requirements elicitation workshops, the business analyst (BA) notices that two business stakeholders did not speak up during any of the discussions. What should the BA do in the next workshop?

Options:

A.

Allow only the two stakeholders to speak, so that other stakeholders are able to hear their input.

B.

Proceed as normal, assuming that the two business stakeholders will speak up if and when they are ready

C.

Ask all attendees for their input, ensuring that each stakeholder is given time to speak and provide their opinion

D.

Omit the two stakeholders from the next meeting since they do not seem to be engaged or interested

Buy Now
Questions 95

A change is desired in a project after the requirements are signed off and after technical design has started. The stakeholders want an additional product to be developed as part of the project. What tool can be used by the business analyst (BA) to assess the impact of the change?

Options:

A.

Concept modelling

B.

Requirements architecture

C.

Backlog management

D.

Balanced scorecard

Buy Now
Questions 96

A business analyst (BA) is working on a project that has a number of stakeholder conflicts and issues. The BA is finding it difficult to resolve the conflicts and issues effectively. What should the BA do to prevent a similar situation in the future?

Options:

A.

Plan business analysis governance

B.

Verify requirements

C.

Perform stakeholder analysis

D.

Validate requirements

Buy Now
Questions 97

Stakeholder requirements where approved for a business process reengineering initiative along with the Creation of a | roadmap. Due to market conditions, the product roadmap is modified to move the default process to the next iteration. What should the business analyst (BA) modify in the stakeholder requirements?

Options:

A.

Requirement performance measures

B.

Scope model

C.

Requirement description

D.

Requirement attribute values

Buy Now
Questions 98

The creative thinking process has three values to determine the effectiveness of the process. Which one of the following is not a measurement of effective creative thinking?

Options:

A.

Willingness of stakeholders to accept new approaches

B.

Generation of a pre-determined number of new ideas for a business solution

C.

Application of new ideas to resolve existing problems

D.

The successful generation and productive consideration of new ideas

Buy Now
Questions 99

In order to plan the business analysis approach, the business analyst must understand the organizational process needs and what other thing?

Options:

A.

Operation of organizations and the objectives of business analysis

B.

Consideration of risk and reward

C.

Purpose of the proposed solution

D.

Stakeholders' threats and perceived threats

Buy Now
Questions 100

What is the purpose of managing the solution scope and requirements from a business analyst's objective?

Options:

A.

To complete business analysis activities as quickly as possible

B.

To obtain and maintain requirements approval from the sponsoring client about the solution scope

C.

To obtain and maintain consensus among key stakeholders for the overall solution scope

D.

To complete business analysis activities as accurately as possible

Buy Now
Questions 101

Which of the following documents graphically depicts the project team members and displays their interrelationship for a specific project?

Options:

A.

Project team directory

B.

Project organization chart

C.

Project scope statement

D.

Project charter

Buy Now
Questions 102

A business analyst (BA) has determined that “Product Box”, a collaboration game, will provide a fun way to engage the stakeholders when working on prioritizing the list of features. What should the BA do?

Options:

A.

Ensure buy-in from key stakeholders

B.

Send out an agenda in advance

C.

Research ideas for the new product

D.

Consider meeting logistics

Buy Now
Questions 103

You are the business analyst for your organization and you're working with Adam on business analysis processes. Adam allows the business analysis activities and resources to exist in support of the organization. Of the following, what type of business analysis stakeholder is Adam?

Options:

A.

Project manager

B.

Domain subject matter expert

C.

Sponsor

D.

Regulator

Buy Now
Questions 104

You are the business analyst for your organization and you're creating a data flow diagram to show how

information is input, processed, stored, and output from a system. Which element of a data flow diagram represents a process that transforms data by combining it with other data?

Options:

A.

Data flow

B.

External entities

C.

Data process

D.

Concatenation

Buy Now
Questions 105

As a candidate for the CCBA exam, you should be able to recognize the activities associated with each knowledge area. All of the following are the business analysis planning & monitoring activities except for which one?

Options:

A.

Defining and determining business analysis processes

B.

Planning how requirements will be approached, traced, and prioritized

C.

Identifying stakeholders

D.

Job shadowing

Buy Now
Questions 106

You are the business analyst for your organization and you're working with your stakeholders to assess the organization's readiness for the solution. As part of this assessment, you'll perform a cultural assessment. What is the purpose of this assessment?

Options:

A.

To determine how the culture may affect the solution

B.

To determine if the stakeholders genuinely want the change to be successful

C.

To determine if the change is feasible in the environment

D.

To determine how the solution affects the stakeholders' culture

Buy Now
Questions 107

According to the book 'A Guide to the Business Analysis Body of Knowledge', effective business analysis practices can do what to the amount of change to requirements in a stable business environment?

Options:

A.

Reduce the amount of change, but not eliminate entirely.

B.

Document the changes to requirements.

C.

Control the frequency of the change.

D.

Eliminate the change entirely.

Buy Now
Questions 108

Which basis for prioritization allows the project team to work initially with lower-risk requirements first?

Options:

A.

Quantitative ranking

B.

Positive risk ranking

C.

Relationship to other requirements

D.

Implementation difficulty

Buy Now
Questions 109

Wanda is the business analyst for her organization and she is currently working on the specify and model requirements process. One of the elements of this process is the documentation of the textual requirements. Wanda must describe the capabilities of the solution, any conditions that must exist for the requirements to operate, and what third component of the textual requirement?

Options:

A.

Any constraints that may prevent the solution from fulfilling the requirement

B.

Describe a situation or problem

C.

Write in the active voice

D.

Express only one requirement at a time

Buy Now
Questions 110

You are the business analyst for your organization. You are currently writing the business goals and objectives as part of the elements for the define business process. Which one of the following statements best describes the business goals and objectives element?

Options:

A.

They describe all of the required work the project will need to complete in order to reach its objectives.

B.

They describe the ends that the organization is seeking to achieve.

C.

They describe the processes the solution will need to improve for the project to be successful.

D.

They describe all of the positive benefits in ratio to the risk and costs of the project.

Buy Now
Questions 111

What should an organization do if the business analyst has determined that the existing capabilities are inadequate to seize an opportunity?

Options:

A.

Recommend that the organization launch a project to create the capabilities needed.

B.

Recommend that the organization not pursue the opportunity.

C.

Recommend that the organization hire contractors with the needed capabilities.

D.

Recommend that the organization share the opportunity with other organizations.

Buy Now
Questions 112

Which of the following is the prime purpose of the Manage Stakeholders Expectations process?

Options:

A.

Identify stakeholders

B.

Close project

C.

Resolve issues

D.

Updating risk registers

Buy Now
Questions 113

You work as a business analyst for u Certify Inc. You have been assigned the task to implement the job

shadowing process. Which of the following statements are true regarding the job shadowing process? Each correct answer represents a complete solution.

Options:

A.

The job shadowing process is a part of business analysis planning and monitoring activities.

B.

In this process, the observer is required to keep an eye on those workers whose work routine is down and who are unable to explain their work.

C.

In this process, the observer has to understand their work process for better assessment of the modifications of the work required.

D.

Job shadowing is an elicitation process that is a part of job observation.

Buy Now
Questions 114

An organization has selected a solution for a business need and the business analyst has elected to use the time boxing/budgeting technique for requirements prioritization. What is the time boxing/budgeting technique?

Options:

A.

It's a method to prioritize requirements based on a pre-determined budget and/or a pre-determined deadline.

B.

It's used when there are conflicting requirements that must be resolved quickly and cost efficiently.

C.

It's a method to rank requirements in different boxes based on time, cost, risk, and need.

D.

It's used to determine which requirements can be implemented fastest and for the least amount of cost.

Buy Now
Questions 115

John and Hanna are business analysts in their organization and they are completing the verification activities to check for completeness of the requirements. When should John and Hanna perform these verification activities?

Options:

A.

At each milestone of the requirements analysis process

B.

Once all of the requirements have been gathered

C.

Iteratively throughout the requirements analysis process

D.

As often as the requirements management plan calls for

Buy Now
Questions 116

Which technique in organizing requirements is best described as showing the concepts and relationships relevant to the solution or business domain?

Options:

A.

Data flow diagram

B.

Business rules analysis

C.

Data modeling

D.

Functional decomposition

Buy Now
Questions 117

Mark is a business analyst for his organization. A business need has been identified; therefore, Mark immediately sets out to identify the stakeholders. How long will stakeholder analysis need to continue?

Options:

A.

It will continue until all of the stakeholders have been identified.

B.

It will continue until the requirements have been approved.

C.

It will continue as long as business analysis continues.

D.

It will continue until the project charter is signed.

Buy Now
Questions 118

A business analyst (BA) is tasked with developing requirements that can be implemented by the development team iteratively. Which characteristic should the requirements exhibit?

Options:

A.

Substantial

B.

Granular

C.

Prioritized

D.

Unambiguous

Buy Now
Questions 119

A business analyst (BA) has been spending the majority of the past week cataloguing the new, removed, and modified components of an upcoming project. What is the main purpose of the BA performing this work?

Options:

A.

To establish the key performance indicators

B.

To define the future state

C.

To identify the domain subject matter expert

D.

To document the current state

Buy Now
Questions 120

A survey on a new system was conducted after the chief executive officer (CEO), who is also the project sponsor, expressed concerns about the uptake of the new system. The CEO is neither sure that the concerns are valid nor whether the survey was conclusive about the success of the project. The business analyst (BA) has been tasked to address the concerns expressed by the CEO and evaluate the results of the survey. What must the BA do to determine that the system is performing as intended and address the concerns of the CEO?

Options:

A.

Evaluate the new system against competitor applications

B.

Confirm the satisfaction of business requirements

C.

Conduct another survey to validate the original results

D.

Validate performance measures and alignment with KPIs

Buy Now
Questions 121

A project's business requirements require that the new solution reduce the labor costs currently attributed to performing end of month accounting procedures. Currently the company routinely must pay overtime to meet the deadline. The business analyst (BA) has been documenting the process and wants to ensure that the approach to the process design is feasible for the staff who perform the end of month procedures. Which of the following stakeholders will provide this verification?

Options:

A.

Implementation subject matter expert

B.

Domain subject matter expert

C.

Operational support

D.

Project sponsor

Buy Now
Questions 122

A business analyst (BA) is supporting an organization in its product launch. The BA wants to identify assumptions about the benefits resulting from the new product. What does identifying assumptions help the BA manage?

Options:

A.

Priorities

B.

Metrics

C.

Requirements

D.

Risks

Buy Now
Questions 123

A business analyst (BA) is working on a project involving the purchase of a commercial off-the-shelf (COTS) product. All internal risks have been identified and assessed. What is the BA's next course of action?

Options:

A.

Review the business objectives

B.

Consult the business case

C.

Assess external risks

D.

Perform an environmental scan

Buy Now
Questions 124

Stakeholders need a financial report that can be published and distributed to multiple end users. They would also like the report to be developed within a specific time frame and within cost. What must the business analyst (BA) do to achieve this goal?

Options:

A.

Review the project budget

B.

Revise business requirements

C.

Define solution approaches

D.

Update the project schedule

Buy Now
Questions 125

One of the tasks that the business analyst (BA) needs to complete is to maintain the requirements. As much as the BA values and sees the benefits of maintaining the requirements, the project manager (PM) does not see the same. In order to help the PM understand the value of this task, which following benefit of maintaining the requirements should the BA communicate to the PM?

Options:

A.

They identify the financial projections of the project.

B.

They define the project schedule and future tasks.

C.

They describe how to setup the traceability tools.

D.

They can easily be traced and reused for future.

Buy Now
Questions 126

A business analyst (BA) is determining the current state as part of a new project. What is an internal enterprise asset that the BA must include in the analysis?

Options:

A.

Brand name

B.

Organizational structure

C.

Business need

D.

Enterprise mission statement

Buy Now
Questions 127

A new regulation is introduced that the project must comply with to remain competitive and industry compliant. Management wants to understand the effect of this new requirement on the project. What will the business analyst (BA) use to evaluate the change?

Options:

A.

Process Modelling

B.

Domain Knowledge

C.

Traceability

D.

Impact Analysis

Buy Now
Questions 128

A client wants to rehire a business analysis consulting firm for another project. The assigned business analyst (BA) developed a good rapport with the stakeholders, but delivered documents that contained lots of technical jargon that the client could not fully understand. Based on the feedback, the consulting company should:

Options:

A.

recommend a new methodology which is the latest trend in the industry.

B.

assign a different BA to the project.

C.

discuss the feedback during the brainstorming sessions after project completion.

D.

identify performance metrics before commencing work.

Buy Now
Questions 129

A business analyst (BA) is in the process of eliciting requirements. It has been determined that not all requirements can be implemented by the project deadline due to complexity. What must the BA do to ensure maximum benefit for the stakeholders?

Options:

A.

Ensure users are trained based on requirements

B.

Apply quality control on requirements

C.

Utilize requirements documentation template

D.

Maintain requirements based on priority

Buy Now
Questions 130

A business analyst (BA) is defining a stakeholder approval approach for the requirement deliverables. The project involves implementing new government regulatory requirements with significant risk to the organization in case of non-compliance. According to the BABOK ® GUIDE, what will the BA need to do?

Options:

A.

Ensure high level user stories are completed and accepted

B.

Use an informal approval process to speed up delivery

C.

Use a rigorous approval process of detailed specifications

D.

Ensure the document is completed and signed off

Buy Now
Questions 131

A business analyst (BA) is preparing the elicitation activity plan for a project. How will understanding the elicitation scope assist the BA with the elicitation activity?

Options:

A.

By ensuring the requirements are validated in time

B.

By demonstrating how to record elicitation results

C.

By outlining the level of stakeholder collaboration

D.

By determining when elicitation is complete

Buy Now
Questions 132

A business analyst (BA) is working on a set of tasks to establish a governance process for the project. The BA intends to identify who has authority and responsibility to propose changes, who should be involved in the change discussions, and how changes will be documented and communicated. Which of the following are the inputs that would help the BA complete the task?

Options:

A.

Business analysis approach and stakeholder engagement approach

B.

Governance approach and stakeholder engagement approach

C.

Governance approach and business analysis approach

D.

Stakeholder engagement approach and information management approach

Buy Now
Questions 133

A business analyst (BA) has been asked to develop a plan to complete the associated business analysis activities for a project in which an organization is switching from a manual to an automated process for receiving payments. As the final step in developing the plan, which technique will the BA use?

Options:

A.

Surveys or QUESTION NO:naires for the current initiative

B.

Functional Decomposition for the current initiative

C.

Lessons learned from previous initiatives

D.

Process modelling from previous initiatives

Buy Now
Questions 134

A business analyst (BA) is assessing risks on a project addressing the implementation of a new web portal. Which of the following would the BA classify as a project risk?

Options:

A.

Customer service ratings will increase with the new system

B.

Current infrastructure may not support increased performance

C.

Expenditures are currently below budgeted estimates

D.

Support calls will increase if the change is not performed

Buy Now
Questions 135

A one-location restaurant has been a huge success and the owner wants to expand into more markets. The owner wants to ensure that the quality of the food and pleasing atmosphere is maintained without introducing new variables. Working with the key members of the organization, the owner determines that training and standard processes must be defined. The owner engages a business analyst (BA) to create training materials and operating procedures based on the existing processes at the original restaurant. During this documentation, the BA identifies some opportunities for improvement. How must the BA proceed?

Options:

A.

Schedule time with the owner to review any opportunities to improve existing processes and obtain

permission to include changes before documenting

B.

Create documentation based on the observed processes because improvements are outside of the scope of the project

C.

Provide documentation of improved procedures based on the observed opportunities for then new location

D.

Perform benchmarking and market analysis to determine whether there are standard procedures in the restaurant industry that support the opportunities identified

Buy Now
Questions 136

The business analyst (BA) has prepared a requirements package and it is now ready to present to the stakeholders. What is the purpose of presenting the package?

Options:

A.

To document the project's completion

B.

To define the analysis approach

C.

To verity the project's progress

D.

To ensure a shared understanding of the information

Buy Now
Questions 137

Two business analysts (BAs) are working on a requirement elicitation activity. One BA comes across a checklist that contains stakeholder details such as who are involved, location, group dynamics that are to be considered before beginning the elicitation activity and seeks a clarification from the second BA. The other BA explains that these details, along with several other items mentioned in the checklist, are required to:

Options:

A.

select elicitation techniques.

B.

prepare stakeholders.

C.

secure supporting material.

D.

understand scope of elicitation.

Buy Now
Questions 138

Due to a change in regulation, a solution being implemented has a new compliance requirement that must be evaluated. The requirements change strategy focuses on total cost of change as the primary driver for decisions. The business analyst (BA) compiled the following impact assessment of the proposed change based on the new compliance requirement.

CCBA Question 138

What recommendation should the BA make to the stakeholders based on the above information?

Options:

A.

Approve the requirement

B.

Request additional information

C.

Defer the requirement

D.

Reject the requirement

Buy Now
Questions 139

A business analyst (BA) is currently verifying the accuracy and consistency of information obtained from the stakeholders. The BA needs to identify additional information. What should the BA do next?

Options:

A.

Perform data modelling

B.

Conduct elicitation activities

C.

Meet with the sponsor

D.

Consult with the project manager

Buy Now
Questions 140

An organization is engaged in an effort to streamline the online customer experience. The business analyst (BA) prepares a business analysis information package to discuss the changes the customer will experience. Which one of the following tools will assist the BA in this discussion?

Options:

A.

Context Diagram

B.

Data Dictionary

C.

Visual Prototype

D.

Business Rules

Buy Now
Questions 141

A business analyst (BA) is identifying the functions and features required for a new enterprise software solution. The BA reviews historical documents about the current business processes and then interviews each stakeholder group, individually, asking Questions about current business processes. The BA compares the information obtained during the stakeholder interviews with the information gathered from the historical documents. Which activity is the BA performing with this approach?

Options:

A.

Verification of requirements

B.

Validation of requirements

C.

Confirmation of elicitation results

D.

Capture of elicitation outcomes

Buy Now
Questions 142

A business analyst (BA) is creating a business process model (BPM) showing how the organization will handle errors reported on its website. The BA held a workshop with stakeholders about how the process might work. The BA was also given an instruction manual about a similar error-handling situation, but was advised that some minor aspects are not applicable to the new process. How can the BA use the manual?

Options:

A.

Ignore the manual's information when creating the BPM since it is about a different situation

B.

Identify the discrepancies in process between the manual and the workshop results and resolve these with stakeholders

C.

Create a new version of the manual based on the original

D.

Rely on the manual to create the BPM and ignore the interview results because no single stakeholder has the whole picture of the process

Buy Now
Questions 143

A business analyst (BA) is reviewing the elicitation results of several workshops in order to decide which technique to use to model the requirements. The elicitation identified user roles needed in a future solution, the functionality needed by each of these roles, and how the desired interaction with the solution should look.

Which technique allows the BA to model this type of information?

Options:

A.

Process models

B.

Roles and permission matrix

C.

Use cases and scenarios

D.

Sequence diagrams

Buy Now
Questions 144

A business analyst (BA) has identified the impacts and resolution for a proposed change. Based on the Responsible, Accountable, Consulted, informed (RACI) matrix, who must approve the change before it is implemented?

Options:

A.

Subject matter expert

B.

Business sponsor

C.

Project manager

D.

System architect

Buy Now
Questions 145

Several user groups are impacted by a proposed change to their daily work flow. How should the business analyst (BA) convey these changes so that the user groups understand the impact?

Options:

A.

Develop a data model diagram

B.

Create business process models

C.

Write functional requirements

D.

Establish a communication plan

Buy Now
Questions 146

A global organization is implementing a new Knowledge Management System and communication to the different regions has been informal. The approach is to convert the few remaining regions iteratively. The team has experienced variances at this point but feels confident in these final conversions. How should the business analyst (BA) communicate the information?

Options:

A.

Repository

B.

Document management

C.

Email

D.

Individual collaboration

Buy Now
Questions 147

A lead business analyst (BA) analyzed the performance of all BA's within the organization. How should the BA approach communicating the results to stakeholders?

Options:

A.

Compare a solution used at another company

B.

Identify the performance objectives

C.

Select performance measures

D.

Determine the reporting requirements

Buy Now
Questions 148

The business analyst (BA) assigned to support a legacy system has developed a customer survey to assess its usability. Before distributing the survey, what should the BA do?

Options:

A.

Validate the survey with the project sponsor

B.

Observe customer interaction with the system

C.

Review the risk register with the project sponsor

D.

Update the project plan to include the survey

Buy Now
Questions 149

Performance measures have been collected and analyzed by a business analyst (BA) to evaluate a solution that was launched a few years ago; however, the performance measures do not indicate whether or not the solution is contributing to the desired value. What is the recommended next step?

Options:

A.

Replace the solution as soon as possible

B.

Identify and collect more measurements

C.

Increase the efficiency of the solution

D.

Reduce the business' expectations of value

Buy Now
Questions 150

A business analyst (BA) is tasked with designing a method of ensuring that the requirements captured during the elicitation sessions satisfy the needs and expectations of the customer experience, within an initiative. The BA identifies a way that the stakeholder requirements can be structured to ensure realization of the desired customer experience. Which viewpoint describes the approach taken by the BA to structure the requirements?

Options:

A.

User interactions

B.

Business model

C.

Audit and security

D.

Business process model

Buy Now
Questions 151

The business analyst (BA) has traced the requirements for the interaction between a customer and the new online ordering system. Besides enabling the BA to ensure quality of the requirements to stakeholders, tracing the requirements will also enable the BA to:

Options:

A.

show all of the decision points in the business process.

B.

illustrate the relationships between relevant requirements.

C.

capture all users that will be impacted by the project.

D.

detail the inner workings of the system being changed.

Buy Now
Questions 152

A senior business analyst (BA) is tasked with verifying a set of requirements written by a junior BA for a

system. During this exercise, the junior BA will ensure that the requirements exhibit atomic characteristics. The senior BA will be verifying that the requirements:

Options:

A.

can be understood independently of other requirements.

B.

are written using terminology common for the audience.

C.

contain no extraneous and unnecessary content.

D.

are aligned with the identified need of the stakeholders.

Buy Now
Questions 153

A company wants to increase transaction service offerings using its on-line channels. The existing application already has some of the required functionality. A new project has been initiated to implement the additional capabilities but the company management is unsure of the complexity of the project. What exercise must be carried out to determine the changes needed in the new application?

Options:

A.

Perform gap analysis of current and future states

B.

Identify internal solution component dependencies

C.

Evaluate competitor applications

D.

Assess organizational culture

Buy Now
Questions 154

A business analyst (BA) worked with two stakeholders to finalize the access rights related requirements for an internal software application. According to the first stakeholder “Comments, once entered in the application, should be stored for 365 days and should not allow the users to delete”. According to the second stakeholder, “The users with super administrator privileges should be able to add/delete/modify every page/section in the entire application.” Which characteristic does this pair of requirements fail to meet?

Options:

A.

Concise

B.

Consistent

C.

Complete

D.

Complex

Buy Now
Questions 155

A business analyst (BA) identifies a design option that enhances the performance of the business by automating repetitive tasks that require multiple staff touchpoints to complete a single task. Which type of improvement opportunity is identified by the BA?

Options:

A.

Identify additional capabilities

B.

Increase efficiencies

C.

Reduce costs

D.

Improve access to information

Buy Now
Questions 156

An organization prefers to execute projects using an adaptive approach. However, the new project is much more complex than previously executed projects. What will the business analyst (BA) recommend?

Options:

A.

Select an extreme programming approach

B.

Review current approach with key stakeholders

C.

Follow a predictive approach

D.

Choose an agile programming approach

Buy Now
Exam Code: CCBA
Exam Name: Certification of Capability in Business Analysis (CCBA)
Last Update: Apr 18, 2024
Questions: 522

PDF + Testing Engine

$74.7  $165.99

Testing Engine

$51.75  $114.99
buy now CCBA testing engine

PDF (Q&A)

$47.25  $104.99
buy now CCBA pdf