Spring Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: pass65

Civil-Engineering-Technology Technical Examination - Civil Engineering Technology C.E.T Questions and Answers

Questions 4

For granular material, what is the typical optimum moisture content for dry densities ranging from 2100 kg/m³ to 2200 kg/m³?

Options:

A.

4–7%

B.

8–15%

C.

16–20%

D.

21–25%

Buy Now
Questions 5

What is the main reason for taking handwritten notes while surveying?

Options:

A.

To prepare invoices

B.

To create a topographic map

C.

To protect from litigation with the employer

D.

To make a permanent record of survey results

Buy Now
Questions 6

A surveyor is laying out the invert elevations of a storm sewer. Centre elevation is 10 m, storm pipe outside diameter is 1 m, and storm sewer pipe wall thickness is 0.05 m. What is the storm sewer invert elevation in the diagram below?

Civil-Engineering-Technology Question 6

Options:

A.

6.50 m

B.

6.55 m

C.

6.75 m

D.

7.00 m

Buy Now
Questions 7

A civil engineering technologist is taking a sample of concrete cylinders from a truck. When should the sample be taken?

Options:

A.

At the start of the load

B.

At the end of the load

C.

In the middle of the load

D.

After the load

Buy Now
Questions 8

Which of the following tests are required as part of soil grain size analysis?

Options:

A.

Sieve analysis for coarse grains and Atterberg limit tests for fine grains

B.

Sieve analysis for coarse grains and hydrometer test for fine grains

C.

Sieve analysis for fine grains and hydrometer test for coarse grains

D.

Sieve analysis for fine grains and Atterberg limit tests for coarse grains

Buy Now
Questions 9

If a controlled product is used, stored, handled, or manufactured at a work site, what documents should be discussed at safety meetings with workers?

Options:

A.

Material Safety Data Sheets (MSDS)

B.

Product Application Procedures

C.

Product Colour Board Samples

D.

Workplace Hazardous Materials Information System (WHMIS)

Buy Now
Questions 10

What two municipal plans are required to define a new civil infrastructure project?

Options:

A.

Residential/commercial development plan and transportation plan

B.

Municipal Development Plan and Transportation Master Plan

C.

Residential/commercial development plan and city transit plan

D.

Municipal Development Plan and city transit plan

Buy Now
Questions 11

Considering Occupational Health and Safety standards for trench side slopes in lieu of shoring, and a 1.2 m wide trench, what is the minimum offset from centre line to the top edge of the trench for an excavation that is 3 m deep?

Options:

A.

1.20 m

B.

2.40 m

C.

3.00 m

D.

5.20 m

Buy Now
Questions 12

The delay in the delivery of a critical item may affect the completion date for a project. Which of the following would be the best course of action?

Options:

A.

Inform the client of possible delays.

B.

Continue the work on the project as planned.

C.

Tell the client that the delivery is on schedule.

D.

Insist that the supplier meet the original delivery date.

Buy Now
Questions 13

When calculating the total cost for a multi-year project, which of the following parameters should be considered?

Options:

A.

Escalation cost

B.

Cost of material

C.

Alternate material availability

D.

Current material delivery times

Buy Now
Questions 14

A soil sample has a porosity of 40%, and the specific gravity of solids is 2.60. What would be the approximate value of dry density of the soil if the soil is completely saturated?

Options:

A.

15.30 kN/m³

B.

20.45 kN/m³

C.

25.85 kN/m³

D.

40.25 kN/m³

Buy Now
Questions 15

Which of the following is not a type of structural foundation system used to hold the weight of a building?

Options:

A.

Grade beam and piles

B.

Wall and strip footings

C.

Concrete formwork

D.

Structural slab-on-grade

Buy Now
Questions 16

What is a typical concrete slump for a municipal sidewalk?

Options:

A.

10–50 mm

B.

25–75 mm

C.

50–100 mm

D.

80–100 mm

Buy Now
Questions 17

The graph below is used for tracking progress and costs of a project for a client. What can be concluded about the project at week 10?

Civil-Engineering-Technology Question 17

Options:

A.

The project is on budget

B.

The project is under budget

C.

The project is behind schedule

D.

The project is ahead of schedule

Buy Now
Questions 18

What is the purpose of a spiral curve in highway design?

Options:

A.

To transition into a circular curve

B.

To slow traffic when the minimum sight distance cannot be achieved

C.

To transition onto a vertical curve

D.

To slow traffic when the superelevation of the lane is greater than 5%

Buy Now
Questions 19

What type of delivery method is described in the image below?

Civil-Engineering-Technology Question 19

Options:

A.

Fast-tracking method

B.

Traditional method

C.

Construction management delivery method

D.

Design–build delivery method

Buy Now
Questions 20

What is a silt fence used for?

Options:

A.

To mark the construction limits of the project

B.

To prevent water from moving through the site

C.

To prevent the public from accessing the construction site

D.

To prevent soil from moving through the site due to erosion

Buy Now
Questions 21

A subcontractor is completing surface rehabilitation in a mature community. What are the minimum requirements for quality that must be met?

Options:

A.

Warranty agreement specifications

B.

Subcontractor’s paving specifications

C.

Developer insurance requirements

D.

Municipality specifications

Buy Now
Questions 22

Which structural components are indicated by the letters A, B, C, and D in the image below?

Civil-Engineering-Technology Question 22

Options:

A.

Pier / Ledger / Joist / Decking

B.

Post / Girder / Stringer / Sheathing

C.

Post / Joist / Beam / Decking

D.

Column / Joist / Girder / Sheathing

Buy Now
Questions 23

What type of survey stake is shown in the image below?

Civil-Engineering-Technology Question 23

Options:

A.

A grade stake

B.

A slope stake

C.

A centreline stake

D.

A benchmark stake

Buy Now
Questions 24

A concrete mix is onsite and at its specified slump of 80 mm. The pour requires a slump of 200 mm. The concrete onsite meets all other requirements. What action should be taken?

Options:

A.

Order a different concrete mix

B.

Add water to the concrete onsite

C.

Add low-range water reducer to the concrete onsite

D.

Add high-range water reducer to the concrete onsite

Buy Now
Questions 25

For a land development project to be initiated, which of the following documents must be submitted to the municipality for approval?

Options:

A.

Area Structure Plan

B.

Neighbourhood Structure Plan

C.

Historical resources overview

D.

Transportation network analysis

Buy Now
Questions 26

Why would an owner require COR certification from a contractor?

Options:

A.

To ensure that a contractor has first aid personnel on staff

B.

To ensure that a contractor has a good workplace safety record

C.

To ensure that a contractor is generally in compliance with workers’ compensation regulations

D.

To ensure that a contractor has a quality safety management program in place

Buy Now
Questions 27

Which of the following correctly indicates the information that must be provided on a site plan?

Options:

A.

The legal description

B.

Finish grades and setback distances

C.

Finish grades and the legal description

D.

Finish grades, setback distances, and the legal description

Buy Now
Questions 28

Which of the following are the most effective ways to communicate with ot contract?

Options:

A.

Email, memos, and meetings

B.

Leaving a message with a receptionist

C.

Calling clients or co-workers at home

D.

Memos, instant messages, and video conferences

Buy Now
Questions 29

Who is responsible for establishing and maintaining a system that is compliant with the Occupational Health and Safety Act in a workplace?

Options:

A.

Prime contractor

B.

Sub-contractor

C.

General contractor

D.

Prime consultant

Buy Now
Questions 30

A civil engineering technologist is undertaking a final acceptance review of a subdivision. The technologist finds 35 m of deficient sidewalk and three hydrants which were not tested. As part of final acceptance, what should be done to ensure the hydrants get tested and the sidewalk is repaired?

Options:

A.

Write down that three hydrants were not tested, and that 35 m of sidewalk was deficient.

B.

Verbally communicate the locations of the hydrants and the sidewalk to the contractor.

C.

Write down the locations of the hydrants and the sidewalk and forward the deficiency list to the contractor.

D.

Request that the contractor write down the numbers and locations of the hydrants and the sidewalk.

Buy Now
Questions 31

Which of the following can a civil engineering technologist request from a concrete supplier to verify that concrete falls within municipal specifications?

Options:

A.

Batch location

B.

Structural mix design

C.

Geotechnical mix design

D.

Batch ticket from the plant

Buy Now
Questions 32

Prior to entering an active construction site, what must all visitors do?

Options:

A.

Put on the appropriate Personal Protective Equipment (PPE).

B.

Check in at the site office for permission.

C.

Show identification credentials.

D.

Call supervisor notifying of site visit.

Buy Now
Questions 33

Which document must be submitted with a tender, if the project requires bonding?

Options:

A.

Consent of Surety

B.

Certificate of Recognition

C.

Certificate of Insurance

D.

Building Permit

Buy Now
Exam Name: Technical Examination - Civil Engineering Technology C.E.T
Last Update: May 22, 2026
Questions: 110

PDF + Testing Engine

$64.99   $185.69

Testing Engine

$49.99   $142.83

PDF (Q&A)

$54.99   $157.11