Spring Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: pass65

Civil-Engineering-Technology Technical Examination - Civil Engineering Technology C.E.T Questions and Answers

Questions 4

Based on the diagram below, what is the percentage slope between D1 and C2 if the grid is 10 m × 10 m?

Options:

A.

8.10%

B.

5.73%

C.

6.79%

D.

3.04%

Buy Now
Questions 5

For granular material, what is the typical optimum moisture content for dry densities ranging from 2100 kg/m³ to 2200 kg/m³?

Options:

A.

4–7%

B.

8–15%

C.

16–20%

D.

21–25%

Buy Now
Questions 6

What type of concrete structural element is shown in the image below?

Options:

A.

Precast

B.

Post-tensioned

C.

Prestressed

D.

Cast in place

Buy Now
Questions 7

In an oil and gas project, the location of a pile is offset by 78 mm north and 54 mm east of the key location plan. The location was stamped and issued for construction by a consulting engineering company. The statement on the drawings says, “Offset more than 75 mm is not accepted.” Which of the following is the best approach for the civil engineering technologist to take?

Options:

A.

Inquire with the client if the pile location is acceptable.

B.

Accept the pile location as is because the offsets are close enough to 100 mm.

C.

Submit a non-conformance report to the design engineer for review and advice.

D.

Fill up the hole and re-drill the pile hole based on the pile key location plan.

Buy Now
Questions 8

Which of the following can a civil engineering technologist request from a concrete supplier to verify that concrete falls within municipal specifications?

Options:

A.

Batch location

B.

Structural mix design

C.

Geotechnical mix design

D.

Batch ticket from the plant

Buy Now
Questions 9

The graph below is used for tracking progress and costs of a project for a client. What can be concluded about the project at week 10?

Options:

A.

The project is on budget

B.

The project is under budget

C.

The project is behind schedule

D.

The project is ahead of schedule

Buy Now
Questions 10

An engineered wooden “I” floor joist has a hole that was cut at the bearing location. What is the best way to verify that the structural integrity of the joist has not been compromised?

Options:

A.

Contact the manufacturer for further information.

B.

Contact a supplier for detailed design information.

C.

Consult another technologist for engineering calculations.

D.

Ask a mechanical contractor to remove the obstacle.

Buy Now
Questions 11

Which of the following situations would cause the most serious delay on a project?

Options:

A.

A worker suffered a broken arm on the work site.

B.

A severe storm flooded a trench before it could be backfilled.

C.

A gas service line to a residence was hit, causing the line to rupture.

D.

Several bones, ranging in size from 10 cm to 60 cm, were found during excavation operations.

Buy Now
Questions 12

Which of the following should be performed to determine the cumulative effect of a land development project on land, air, and water?

Options:

A.

Preliminary surveys

B.

Urban services design

C.

Aerial surveys

D.

Environmental assessment

Buy Now
Questions 13

What is the primary force that a bridge in the diagram needs to resist?

Options:

A.

Compression

B.

Tension

C.

Moment

D.

Shear

Buy Now
Questions 14

Which of the following items appears on a record drawing?

Options:

A.

Initial project estimates

B.

Safety meeting minutes

C.

Quantities for tender

D.

Changes from the original construction documents

Buy Now
Questions 15

What must an employer do if an employee could be exposed to hazardous materials on a work site?

Options:

A.

Remove hazardous materials from the work site prior to starting work.

B.

Provide hazmat suits for employees’ use.

C.

Establish procedures to minimize employee exposure.

D.

Conduct air sample testing prior to starting work.

Buy Now
Questions 16

What personal protective equipment is most important when surveying near active traffic?

Options:

A.

Hearing protection

B.

Leather gloves

C.

High-visibility vest

D.

Safety glasses

Buy Now
Questions 17

What are the coordinates of the valve in the imagebelow?

Options:

A.

N 4512.25, E 3345.73

B.

N 4507.25, E 3345.73

C.

N 4507.25, E75, E 3345.23

Buy Now
Questions 18

A road to be filled is 6 m wide with 3:1 side slopes and a maximum of 6 m fill at the road centre line. The cut and fill are symmetrical, as shown in the image below. The cost of moving material is $4.00 per m³ per km haul length. What is the minimum cost to fill in the road?

Options:

A.

$384,000

B.

$576,000

C.

$864,000

D.

$1,152,000

Buy Now
Questions 19

A site inspection reveals a beam that does not conform to Issued for Construction (IFC) drawings. What should be done?

Options:

A.

Document the issue and notify the engineer

B.

Remove the beam and notify the contractor

C.

Document the issue and file it

D.

Verify engineering calculations on IFC drawings

Buy Now
Questions 20

What is the most important information a civil engineering technologist should be familiar with before stepping onsite during site inspection?

Options:

A.

Owner’s name

B.

Project completion date

C.

Site safety rules and procedures

D.

Number of site personnel and equipment

Buy Now
Questions 21

What is a silt fence used for?

Options:

A.

To mark the construction limits of the project

B.

To prevent water from moving through the site

C.

To prevent the public from accessing the construction site

D.

To prevent soil from moving through the site due to erosion

Buy Now
Questions 22

What is the main reason for taking handwritten notes while surveying?

Options:

A.

To prepare invoices

B.

To create a topographic map

C.

To protect from litigation with the employer

D.

To make a permanent record of survey results

Buy Now
Questions 23

In the middle of the project, the client proposed an additional scope of work that requires a change order to the contract. Which statement applies to the contractor’s percentage fee (i.e., mark-up) that should be added to the total amount in the change order?

Options:

A.

It is determined by the owner.

B.

It is determined by the contractor.

C.

It is specified in the contract documents.

D.

It varies depending on the size of the change contract.

Buy Now
Questions 24

Which of the following tests would most likely be used to determine if engineered fill was placed to meet contract specifications?

Options:

A.

Sieve analysis

B.

Compaction test

C.

Triaxial compression test

D.

Moisture content check

Buy Now
Questions 25

A civil engineering technologist works for a contractor. An engineer notifies him that the depth of concrete pilings needs to be increased. What is the first thing the civil engineering technologist should do?

Options:

A.

Proceed with the work according to the original contract.

B.

Proceed with the revised work as instructed.

C.

Present revised environmental considerations to the project engineer.

D.

Present the change in costs and schedules to the project manager.

Buy Now
Questions 26

What information is provided by a 5-point Proctor density test on a soil sample?

Options:

A.

Maximum density at optimum moisture content

B.

Maximum density at its current moisture content

C.

Maximum moisture content of the sample

D.

Maximum particle size within the soil sample

Buy Now
Questions 27

Which of the following statements best describes thefor piling loads in the diagram below?

Options:

A.

It is less than.

B.

It is less than.

C.

It is less than or equal to.

D.

It is less than or equal to.

Buy Now
Questions 28

When calculating the total cost for a multi-year project, which of the following parameters should be considered?

Options:

A.

Escalation cost

B.

Cost of material

C.

Alternate material availability

D.

Current material delivery times

Buy Now
Questions 29

A geotechnical report indicates the presence of a peat layer in several boreholes. The peat layer ranges in thickness from 450 mm to 1200 mm and is found at a depth of 1.5 m below the existing grade. How should this be addressed in the project specifications that are being prepared?

Options:

A.

Advise the bidders that the peat layer is present

B.

Propose a method of stabilizing the peat layer in the specifications

C.

Include a clause stating that the peat should be removed from the area

D.

Determine the bearing strength of the peat material and include this information in the specifications

Buy Now
Questions 30

The k-value in a vertical curve design defines the horizontal distance required to make a 1% change in the gradient. Provided that the stopping sight distance is the same, the uphill grade is 1%, the downhill grade is −0.5%, and the design speed is 90 km/h, what is the length of the vertical curve?

Options:

A.

60 m

B.

83 m

C.

90 m

D.

110 m

Buy Now
Questions 31

EXCERPT FROM MUNICIPAL BYLAW 1234 – ZONING

Section 3: Single family zone

3.1 All dwellings shall house one family.

3.2 All dwellings shall have a minimum main floor area of 120 m².

3.3 All dwellings shall be constructed a minimum of 10.0 m from the front property line, 15.0 m from the rear property line, and 1.5 m from the side property lines.

3.4 An application that does not fulfill the above requirements shall be referred to Council.

Options:

A.

Approve the application because it meets all requirements.

B.

Reject the application because the rear yard setback is too large.

C.

Refer the application to Council because it does not meet the requirements.

D.

Reject the application because one of the side yard dimensions and the main floor area are not sufficient.

Buy Now
Questions 32

A soil sample has a porosity of 40%, and the specific gravity of solids is 2.60. What would be the approximate value of dry density of the soil if the soil is completely saturated?

Options:

A.

15.30 kN/m³

B.

20.45 kN/m³

C.

25.85 kN/m³

D.

40.25 kN/m³

Buy Now
Exam Name: Technical Examination - Civil Engineering Technology C.E.T
Last Update: Feb 26, 2026
Questions: 110

PDF + Testing Engine

$63.52  $181.49

Testing Engine

$50.57  $144.49
buy now Civil-Engineering-Technology testing engine

PDF (Q&A)

$43.57  $124.49
buy now Civil-Engineering-Technology pdf