Spring Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: pass65

CT-PT ISTQB Certified Tester - Performance Testing Questions and Answers

Questions 4

What is the primary purpose of a load generator?

Options:

A.

Create a steady and consistent background load on the system

B.

Simulate user behavior in accordance with the defined operational profile

C.

Record and analyze the behavior of the system as it is executing the prescribed tests

D.

Support root cause analysis when performance degradation is encountered

Buy Now
Questions 5

Which of the following is considered a common database protocol?

Options:

A.

ODBC

B.

JUNIT

C.

SMP

D.

MMS

Buy Now
Questions 6

During which of the principal performance testing activities are the building blocks for larger, more complex tests created?

Options:

A.

During test completion

B.

During test planning

C.

During test design

D.

During test implementation

Buy Now
Questions 7

At what point during performance testing does monitoring with the load testing tool begin?

Options:

A.

When testing is concluded.

B.

Before testing execution.

C.

Immediately after test execution.

D.

Simultaneously with test execution.

Buy Now
Questions 8

Which of the following is typically the result of oversaturation of system resources during performance testing?

Options:

A.

Response time will gradually improve over a period of time.

B.

Response time will be slow under significant load levels.

C.

Error logging will decrease.

D.

The size of the database will gradually decrease.

Buy Now
Questions 9

Which of the following is considered a common web service protocol?

Options:

A.

SOAK

B.

REST

C.

HTTP

D.

RTE

Buy Now
Questions 10

Which of the following is usually identified by a performance test?

Options:

A.

Resource bottlenecks

B.

Suitability issues

C.

Learnability concerns

D.

Failure to meet accessibility requirements

Buy Now
Questions 11

Which of the following is a general principle of performance testing?

Options:

A.

Tests must be executable within the project timeframe.

B.

Test results must be comparable to tester expectations.

C.

Test results must vary when the tests are run repeatedly on an unchanged system.

D.

Tests must align with the ideal outcome of stakeholders.

Buy Now
Questions 12

Which of the following is a typical performance risk associated with distributed architectures?

Options:

A.

A local hard disk that has been de-fragmented

B.

Excess computer memory resources

C.

Unreliable or unpredictable remote servers

D.

Inconsistent Bluetooth connectivity

Buy Now
Exam Code: CT-PT
Exam Name: ISTQB Certified Tester - Performance Testing
Last Update: May 11, 2026
Questions: 40

PDF + Testing Engine

$63.52  $181.49

Testing Engine

$50.57  $144.49
buy now CT-PT testing engine

PDF (Q&A)

$43.57  $124.49
buy now CT-PT pdf