CTFL-001 ISTQB Certified Tester Foundation Level Questions and Answers

Questions 4

Which one of the following estimation approaches is appropriate at this stage of the project? 2 credits

Options:

A.

Create an estimate based on the function point analysis technique and test point analysis

B.

Create an estimate based on the complexity of the code

C.

Create an estimate based on the credentials of the successful bidder

D.

Create an estimate based on a percentage of the development effort

Buy Now
Questions 5

You have been asked to write a testing strategy for the company. Which statement best explains how risk can be addressed within the testing strategy? 1 credit

Options:

A.

A test strategy should address identified generic product risks and present a process for mitigating those risks in line with the testing policy.

B.

A test strategy identifies the specific product for a project risk and defines the approach for the test project.

C.

A test strategy is derived from the test policy and describes the way risk assessments are performed in projects.

D.

A test strategy is the result of a project risk analysis and defines the approach and resources for testing.

Buy Now
Questions 6

In addition to risk, identify TWO other components of a testing strategy. 1 credit

Options:

A.

The entry and exit criteria for each test phase

B.

Test training needs for the project resources

C.

The test design techniques to be used

D.

Test performance indicators

E.

The test schedule

Buy Now
Questions 7

Part of the testing strategy indicates that you are going to be using systematic test design techniques. Your manager has asked that you present the main advantages of using these techniques at the next board meeting. Identify THREE main benefits of using systematic test design techniques within this company. 2 credits (for 2 out of 3 correct 1 credit)

Options:

A.

Easier to quickly adapt testing to changing requirements compared to experienced-based testing

B.

Targets certain types of faults

C.

Will guide experienced testers to find defects

D.

Provides a way to differentiate depth of testing based on product risks by using different techniques

E.

More enhanced documentation and therefore higher repeatability and reproducibility

F.

Will make non-systematic testing redundant

G.

Will reduce the need for early reviews

Buy Now
Questions 8

Which of the following activities is appropriate to the test planning stage?

Options:

A.

Analysing the test basis

B.

Assigning resources for the planned activities

C.

Designing the test environments

D.

Writing a test execution schedule

Buy Now
Questions 9

Risks should be constantly reviewed. Given the current situation, which one of the following factors is most likely to lead to a revised view of product risk? 3 credits

Options:

A.

The concerns over the user interface may lead to changes to the interface which cannot be implemented by development in time for the second test iteration.

B.

The concerns over the user interface raises the likelihood of a risk in that area and increases the amount of test effort needed for the user interface, thereby limiting the test effort available for other parts of the test management tool.

C.

The delivery of the application without the interface changes may upset the user community.

D.

The method used for test estimation is not accurate enough and hence the money spent on testing exceeded its budget.

Buy Now
Questions 10

Non-functional system testing includes:

Options:

A.

Testing to see where the system does not function properly

B.

Testing quality attributes of the system including performance and usability

C.

Testing a system feature using only the software required for that action

D.

Testing a system feature using only the software required for that function

E.

Testing for functions that should not exist

Buy Now
Questions 11

Complete statement and branch coverage means..?

Options:

A.

That you have tested every statement in the program

B.

That you have tested every statement and every branch in the program

C.

That you have tested every IF statement in the program

D.

That you have tested every combination of values of IF statements in the program

Buy Now
Questions 12

Why is measurement of code coverage Important?

Options:

A.

Because 100% code coverage implies 100% coverage of requirements

B.

Because 100% code coverage guarantees that there are no coding errors

C.

Because code coverage can be used to ensure that all code is exercised by tests

D.

Because code coverage can ensure that all decisions are correctly implemented in the code

Buy Now
Questions 13

The following Test Cases have been created for a simple web-based airline booking system.

Test Case 1: Search for an item Available Flights

Test Case 2: View selected item in My Flights

Test Case 3: Login to the system: Login is accepted

Test Case 4: Select an available flight: item added to My Flights

Test Case 5: Print confirmation receipt, then exit

Test Case 6: In My Flights, confirm details and book flight

Which of the following is the correct logical order for the test cases?

Options:

A.

6, 3, 1, 4, 2, 5

B.

3, 4, 1, 2, 5, 6

C.

3, 2, 1, 4, 6, 5

D.

3, 1, 4, 2, 6, 5

Buy Now
Questions 14

You have investigated different possibilities and selected four of them to present to IT management. Which of the proposals will you most likely give your highest recommendations? 3 credits

Options:

A.

Insourcing of test automation based on an offer from a local company ABC that has people who are specialists in system level capture-replay automation tools and they also do regular training courses in test automation methods and tools. They can then work closely with Vicki.

B.

Outsourcing of test automation based on an offer from an Asian company, AsiaAutoTest, which has people who are specialists in system level capture-replay automation tools. They also offer training and besides they offer to run and maintain the regression tests in the future.

C.

Internal offer from the development department of XYZ to create the regression package using CppUnit as test automation tool. One of the development groups have very good experiences in automating unit tests, and they are willing to do training as well.

D.

Solution from a tool vendor offering to educate two test team members in the use of their easy-to-use test automation capture replay tool over the first 3 month and based on that build the regression test suite. In addition to Vicki, Steve is the only one that has time available to be educated.

Buy Now
Questions 15

Instead of having an independent test team within the company, the company is considering to outsource testing. What are THREE key challenges that are typical for outsourcing? 1 credit

Options:

A.

Test environment more complex

B.

Define expectation for tasks and deliverables

C.

Clear channels of communications

D.

Possibly different cultures

E.

Testing of non-functional requirements

F.

Audit trail from requirements to test cases

G.

Applying test automation

Buy Now
Questions 16

What is the value of static code analysis?

Options:

A.

Detection of failures not easily found by other types of testing

B.

Early defect detection

C.

Detection of suspicious operations caused by deviations from regulations

D.

Detect deviations in standards by executing the source code

Buy Now
Questions 17

Which of the following is a project risk mitigation step you might take as test manager? 1 credit

Options:

A.

Testing for performance problems

B.

Hiring a contractor after a test analyst leaves the company

C.

Arranging a back-up test environment in case the existing one fails during testing

D.

Performing a project retrospective meeting using the test results after each increment

Buy Now
Questions 18

During test process improvement it is recommended to use standards where possible. Standards originate from various sources and they cover different subjects in relation to testing Pick TWO sources of software standards, useful to software testing from the ones mentioned below. 1 credit

Options:

A.

ISO 9126-1 ‘Software engineering- Product quality Part 1:

Quality model’ is an international standard, that provides a basis on which to define quality assurance solutions.

B.

ISA 4126-1 ‘Software engineering- Product quality Part 1:

Quality model’ is an international standard, that provides a basis on which to define quality assurance solutions.

C.

BS-7925-2 ‘Software testing. Software component testing is a national standard used internationally. It covers a number of testing techniques that may be useful both on component testing level and on system testing level.

D.

SY-395-01 ‘Standard for East Coast Hospital software’ is a regional standard adapted from a national one. Besides hospital software, this standard ought to be used also by other types of software system in the region.

E.

IEEE 829 ‘standard for software test documentation’ is an international standard to be following mandatory by all testing origination regardless of lifecycle models.

Buy Now
Questions 19

Which of the following phases in the fundamental test process is considered to deliver a document which can be used as a major input for test process improvement? 1 credit

Options:

A.

Test planning and control

B.

Test implementation & execution

C.

Evaluating exit criteria and reporting

D.

Test project closure

Buy Now
Questions 20

Which test management control option is most appropriate to adopt under these circumstances? 2 credits

Options:

A.

Introduce mandatory evening and weekend working to retrieve the 3 week slippage.

B.

Reconsider the exit criteria and review the test plan in the context of the current situation.

C.

Advise the user community regarding the reduced scope of requirements and the additional incremental delivery.

D.

Arrange a meeting with the user community representatives to discuss the user interface.

Buy Now
Questions 21

What would be a test approach regarding the test design techniques to be applied that would fit an item with the highest risk? 2 credits

Options:

A.

Component testing: decision testing; System testing: exploratory testing

B.

Component testing: decision testing; System testing: decision table testing

C.

Component testing: statement testing; System testing: equivalence partitioning

D.

Component testing: statement testing; System testing: decision table partitioning

Buy Now
Questions 22

What is the Risk Priority Number for risk item number 2? 2 credits

Options:

A.

16

B.

2

C.

1

D.

63

Buy Now
Questions 23

Which of the following is least likely to be used as a technique to identify project and product risks? 1 credit

Options:

A.

Brainstorming

B.

Inspections

C.

Expert interviews

D.

Independent assessments

Buy Now
Questions 24

According to the ISTQB Glossary, regression testing is required for what purpose?

Options:

A.

To verify the success of corrective actions.

B.

To prevent a task from being incorrectly considered completed.

C.

To ensure that defects have not been introduced by a modification.

D.

To motivate better unit testing by the programmers.

Buy Now
Questions 25

Which THREE activities would be valid steps during the development of the test strategy?2 credits (2 out of 3 correct 1 credit)

Options:

A.

Identify test staff members that will be involved in the system test

B.

Define test career paths

C.

Understand the software development life cycle used by the software house

D.

Assess the testing that needs to be done to minimize the risks

E.

Issue the test strategy document for review

F.

Define a master test plan template

G.

Perform a project risk analysis

Buy Now
Questions 26

Which of the following would be the TWO most appropriate examples of entry criteria documented in the system integration test plan? 2 credits

Options:

A.

The percentage of decision coverage achieved during unit testing.

B.

The availability of the latest version of the capture-replay tool (for testing the interface with the newly developed test management tool).

C.

The sign-off of a performance test software release note (test item transmittal report) by both development and testing showing that system performance meets the specified acceptance criteria.

D.

The percentage of acceptance test procedures scheduled for execution.

E.

The percentage of requirements coverage achieved during system integration test.

Buy Now
Questions 27

Regarding the process described above, what is the most important recommendation you would make using IEEE 1044 as a guide? 2 credits

Options:

A.

No priority or severity assigned

B.

Incident numbering is manual rather than automated

C.

No mentioning of reproduceability

D.

No classification on type of incident

Buy Now
Questions 28

You are considering involving users during test execution. In general, what is the main reason for involving users during test execution? 1 credit

Options:

A.

They are a cheap resource

B.

They have good testing skills

C.

This can serve as a way to build their confidence in the system

D.

They have the ability to also focus on invalid test cases

Buy Now
Questions 29

Which of the following team roles would be most appropriate to enhance the team and why? 2 credits

Options:

A.

A person with the ability to complete tasks

B.

A quality assurance officer

C.

A person with in-depth technical skills

D.

A person who brings new ideas to the team

Buy Now
Questions 30

In addition to introducing the new team member, you have decided to raise motivation. Which of the measures listed below would be the best measure to take in order to increase the motivation of the team? 2 credits

Options:

A.

Provide more time for testing in the schedule

B.

Allow people to take some time off

C.

Introduce entry criteria to the testing phase

D.

Organize a meeting with senior management in which they address the importance of good testing for this project

Buy Now
Questions 31

Which of the following is a valid drawback of independent testing? 1 credit

Options:

A.

Developer and independent testing will overlap and waste resources.

B.

Developers loose the sense of responsibility and independent testers may become a bottleneck.

C.

Independent testers need extra education and always cost more.

D.

Independent testers will become a bottleneck and introduce problems in incident management.

Buy Now
Questions 32

Which of the following is a benefit of independent testing? 1 credit

Options:

A.

Code cannot be released into production until independent testing is complete.

B.

Testing is isolated from development.

C.

Independent testers find different defects and are unbiased.

D.

Developers do not have to take as much responsibility for quality.

Buy Now
Questions 33

A number of options have been suggested for the level of independence to be employed for the testing on the next project, and are shown below.

i. External test specialists perform non-functional testing.

ii. Testing is outsourced.

iii. Testing is carried out by the developer.

iv. A separate test team carries out the testing.

v. Testing is performed by the business.

vi. Testing is performed by a different developer.

Which of the following orders the above in a correct order of independence? 1 credit

Options:

A.

i, ii, iv, vi

B.

ii, i, v, vi

C.

ii, v, i, iii

D.

i, iv, v, vi

Buy Now
Questions 34

Consider the following pseudo code:

1 Begin

2 Read Time

3 If Time < 12 Then

4 Print(Time, " am " )

5 Endif

6 If Time > 12 Then

7 Print(Time −12, " pm " )

8 Endif

9 If Time = 12 Then

10 Print (Time, " noon " )

11 Endif

12 End

How many test cases are needed to achieve 100 per cent decision coverage?

Options:

A.

1

B.

2

C.

3

D.

4

Buy Now
Questions 35

What is the purpose of test completion criteria in a test plan:

Options:

A.

To know when a specific test has finished its execution

B.

To ensure that the test case specification is complete

C.

To set the criteria used in generating test inputs

D.

To know when test planning is complete

E.

To plan when to stop testing

Buy Now
Questions 36

In general, why is it NOT a good idea to estimate the testing effort based only on a percentage of development effort? Identify THREE valid reasons. 1 credit

Options:

A.

The quality of the development estimate may be poor.

B.

In general bottom-up estimation is always better than top-down estimation.

C.

The percentage based technique only applies to the V life cycle model.

D.

Using the same percentage every time does not address the level of risk of the application to be tested.

E.

The maturity of the organization, e.g. the quality of the test basis, quality of development testing, configuration management, availability of test tools, also influence the effort needed for testing.

F.

It builds on large set of historical data

G.

The result is almost always a too low estimate for the required test effort

Buy Now
Questions 37

Which of the following is NOT a typical key challenge for testing in a RAD based development approach? 1 credit

Options:

A.

Re-usable test scripts for (automated) regression testing

B.

Project management and control

C.

No complete requirements specification

D.

Time-boxing

Buy Now
Questions 38

As a result of the RAD based development approach, the test manager has decided to change the risk mitigation approach. Which test technique might be most appropriate to use? 2 credits

Options:

A.

Decision Table Testing

B.

Boundary Value Analysis

C.

Error Guessing

D.

Exploratory Testing

Buy Now
Questions 39

Why might a RAD approach be a better option for the test manager rather than a sequential development? 2 credits

Options:

A.

It will extend the development team’s abilities and enhance future delivery capabilities.

B.

It will allow the marketing, clerical and testing staff to validate and verify the early screen prototypes.

C.

Time-box constraints will guarantee code releases are delivered on schedule.

D.

More time can be spent on test execution as less formal documentation is required.

Buy Now
Questions 40

The business has asked for a weekly progress report. Which of the following would be appropriate as a measure of test coverage? 2 credits

Options:

A.

Percentage of business requirements exercised

B.

Percentage of planned hours worked this week

C.

Percentage of countries that have test scenarios

D.

Percentage of test iterations completed

Buy Now
Questions 41

You have been given responsibility for the non-functional testing of a safety-critical monitoring & diagnostics package in the medical area. Which of the following would you least expect to see addressed in the test plan? 1 credit

Options:

A.

Availability

B.

Safety

C.

Portability

D.

Reliability

Buy Now
Questions 42

Given the following figures for the testing on a project, and assuming the failure rate for initial tests remains constant and that all retests pass, what number of tests remain to be run? 3 credits

CTFL-001 Question 42

Options:

A.

700

B.

720

C.

784

D.

570

Buy Now
Questions 43

Given is the following defect removal chart reported at the end of system testing - showing total defects detected and closed defects (fixed and successfully retested). A number of open defects are classified as critical. All tests have been executed.

CTFL-001 Question 43

Based on the chart above, what is the most appropriate next test phase? 1 credit

Options:

A.

Acceptance testing to verify the business process

B.

Acceptance testing to verify operational requirements

C.

Requirements testing as part of testing regulatory compliance

D.

Another system test cycle to verify defect resolution

Buy Now
Questions 44

Continuing with the Scenario described in the previous question, which of the following topics would you need to address in detail in the master test plan? 3 credits

Options:

A.

An approach to regression testing

B.

A list of boundary values for “advance amount”

C.

A description of dependencies between test cases

D.

A logical collection of test cases

Buy Now
Questions 45

Relying only on the information provided in the scenario, select the TWO items and/or features for which sufficient information is available to proceed with test design. 2 credits

Options:

A.

All supported credit cards

B.

Language localization

C.

Valid and invalid advances

D.

Usability

E.

Response time

Buy Now
Questions 46

Within the projects, a master test plan and phase test plan will be used. Following is a list of characteristics applicable for test plans:

a. Any deviation from the procedures described in the test strategy document

b. The overall estimated costs, timescales and resource requirements

c. A detailed schedule of testing activities

d. The development deliverables to be tested

e. Which test staff members (names) will be involved and when

f. Level of requirements coverage achieved

Which THREE of the above mentioned characteristics relate to the master test plan? 1 credit

Options:

A.

a

B.

b

C.

c

D.

d

E.

e

F.

f

Buy Now
Questions 47

As part of the test strategy, entry and exit criteria will be defined for each test level. Which is NOT a valid reason for using entry and exit criteria? 1 credit

Options:

A.

The expectation is that development testing is not adequate.

B.

Exit criteria are used to decide on when to stop testing.

C.

Entry and exit criteria are a principal way for getting adequate resources.

D.

Using entry and exit criteria will prevent software that is not or poorly tested from going to the next test level.

Buy Now
Questions 48

Within the projects, a master test plan and phase test plan will be used. Following is a list of characteristics applicable for test plans:

a. Any deviation from the procedures described in the test

b. strategy document

c. The overall estimated costs, timescales and resource

d. requirements

e. A detailed schedule of testing activities

f. The development deliverables to be tested

g. Which test staff members (names) will be involved and when

h. Level of requirements coverage achieved

Which TWO of the above mentioned characteristics relate to the phase test plan? 1 credit

Options:

A.

a

B.

b

C.

c

D.

d

E.

e

F.

f

Buy Now
Questions 49

Evaluate the status of the project against the defined exit criteria. Which of the following options shows the correct status? 2 credits

Options:

A.

Criteria A = OK, criteria B = OK, criteria C = OK

B.

Criteria A = NOT OK, criteria B = NOT OK, criteria C = OK

C.

Criteria A = OK, criteria B = NOT OK, criteria C = NOT OK

D.

Criteria A = NOT OK, criteria B = NOT OK, criteria C = NOT OK

Buy Now
Questions 50

Based on the information given in the scenario, identify how the team could be improved most effectively? 2 credits

Options:

A.

By providing training in the payroll domain

B.

By providing a workshop on test design techniques

C.

By providing specific training on the systems being tested

D.

By providing training on reviewing requirements

Buy Now
Questions 51

Comparing TMMi and TPI, which is not a valid reason for choosing either TPI or TMMi? 2 credits

Options:

A.

If the scope of test performance improvement covers all test levels, TMMi is preferred since TPI focusses mainly on black-box testing.

B.

If the organization is already applying CMMI, TMMi may be preferred since it has the same structure and uses the same terminology. TMMi addresses management commitment very strongly and is therefore more suitable to support a top-down improvement process.

C.

TPI is much more a bottom-up model that is suitable for addressing test topics for a specific (test) project.

D.

TMMi can only be used with the traditional V model,whereas TPI can be used with all types of software life cycles.

Buy Now
Questions 52

Model characteristics:

Which THREE of the below mentioned characteristics relate to TMMi? 1 credit

Options:

A.

5 maturity levels

B.

Focussed on higher level testing

C.

20 key areas

D.

Highly related to CMMI

E.

Continuous model

F.

Staged model

G.

Focussed on component and integration testing

Buy Now
Questions 53

A test assessment has been carried out using the selected model as a reference framework. A number of recommendations have been identified and you are asked to prioritize them. Based on your knowledge of the project, you are expecting severe resistance to change. Which of the following would be the most important selection criterion for defining the priority of the recommendations? 2 credits

Options:

A.

Synchronized with the overall long-term organizational strategy

B.

Defined according to the maturity model used

C.

Most visible to stakeholders

D.

Low costs actions first

Buy Now
Questions 54

The test improvement project will take place in an organization developing a safety-critical avionics application. Which one of the following standards do you believe would be most appropriate to take into account for compliance during your assignment? 1 credit

Options:

A.

ISO 9126

B.

IEEE 829

C.

BS 7925/2

D.

DO-178B

Buy Now
Exam Code: CTFL-001
Exam Name: ISTQB Certified Tester Foundation Level
Last Update: Apr 30, 2026
Questions: 332

PDF + Testing Engine

$63.52  $181.49

Testing Engine

$50.57  $144.49
buy now CTFL-001 testing engine

PDF (Q&A)

$43.57  $124.49
buy now CTFL-001 pdf