Free Practice Questions for the EMC Storage D-PVM-DS-01 Exam (2026 Updated)

At Marks4sure, we are dedicated to providing IT professionals with the most accurate and reliable preparation materials for the EMC D-PVM-DS-01 exam. To support your certification journey, we have made a selection of our premium 2026 Storage practice questions and answers available completely free. You can take this practice test as many times as you need. Every question includes a detailed, expertly verified explanation to ensure you fully grasp the core security concepts before test day.

Questions 4

A customer is planning to purchase a PowerMax 8000 system with the zEssentials software package. The environment needs to have the ability to rapidly recover from large scale logical corruption using TimeFinder SnapVX.

Which optional software should be recommended to fulfill the requirement?

Options:

A.

Product Suite for z/TPF

B.

GDPR

C.

zDP

D.

AutoSwap

Buy Now
Questions 5

What is the best practice sizing guideline for front-end FA utilization on a single engine PowerMax array?

Options:

A.

0.5

B.

0.6

C.

0.7

D.

0.8

Buy Now
Questions 6

While designing a PowerMax 8500 system, the capacity requirements require 298 drives in a RAID 5(12+1) configuration.

What is the minimum number of node pairs that must be configured?

Options:

A.

5

B.

2

C.

4

D.

3

Buy Now
Questions 7

A PowerMax 2500 system has an SMB share capacity of 2 TB, user quota is applied on the share for the 80% threshold. User has already crossed 80% data writing; alerts are getting generated for this share.

What will happen to user access once grace period expires?

Options:

A.

Writes will happen along with warnings.

B.

Writes will append and destage once additional capacity is added in the share.

C.

Writes will stop on the share.

D.

Warnings will no longer trigger for user.

Buy Now
Questions 8

Due to space restrictions at the data center for the PowerMax 8500 system, the existing six node pairs with four DMEs are limited to grow within its existing rack.

What is a valid upgrade option in this scenario?

Options:

A.

One more DME (total five) can be installed in the existing rack.

B.

Two more DME (total six) can be installed in the existing rack.

C.

No additional node pairs or DME can be added to this configuration.

D.

Two more node pairs (eight node pairs) can be installed in the existing rack.

Buy Now
Questions 9

A customer is using SDNAS in replication. However, they have different IP subnets in DC and DR. They want to modify the interface IP at the DR site.

What is the correct order to perform the changes?

D-PVM-DS-01 Question 9

Options:

Buy Now
Questions 10

A Storage Architect is preparing a response to a Request for Proposal (RFP). The customer currently uses a two-site Hitachi enterprise platform for their SAP HANA database and applications. Dell is proposing a technology refresh using a PowerMax 8500 system, requiring data migration from the existing Hitachi arrays to the new PowerMax V4 arrays.

To validate the existing configuration for migration using the “My Work” portal, which two components, other than hosts and SAN switches, can the Architect verify? (Choose two.)

Options:

A.

Application Server Licenses

B.

Hitachi Storage

C.

Virtual Machine CPU Allocation

D.

PowerMax 8500 array

Buy Now
Questions 11

A single node pair PowerMax 8500 system is configured with 768 GB DRAM + 1 TB PMEM. The array requires a PMEM upgrade.

What is the only available PMEM upgrade option for this PowerMax configuration?

Options:

A.

768 GB DRAM + 1.5 TB PMEM

B.

768 GB DRAM + 4 TB PMEM

C.

768 GB DRAM + 2 TB PMEM

D.

768 GB DRAM + 3 TB PMEM

Buy Now
Questions 12

Due to a technology refresh, the storage for a critical OLTP DB application on a PowerMax 8000 system will be migrated to a new PowerMax 8500 system. The application requires zero downtime, and the hosting team has minimal staff to support the extra work.

What would be the best migration solution to meet the requirements?

Options:

A.

NDM with precopy.

B.

SRDF sync mode.

C.

Open Replicator with donor update.

D.

PowerPath migration enabler.

Buy Now
Exam Code: D-PVM-DS-01
Exam Name: Dell PowerMax Design v2 Exam
Last Update: Oct 31, 2026
Questions: 40

PDF + Testing Engine

$55.71   $185.69

Testing Engine

$42.85   $142.83

PDF (Q&A)

$47.13   $157.11