Spring Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: pass65

D-VXR-DY-23 Dell VxRail Deploy 2023 Questions and Answers

Questions 4

A company needs to enable vSphere GPU capabilities on their VxRail cluster. To do so, they need to purchase a specific entitlement.

What licensing satisfies this requirement?

Options:

A.

vSphere Enterprise Plus

B.

vSAN Enterprise Plus Edition

C.

vSAN Advanced Edition

D.

vSphere Standard

Buy Now
Questions 5

An implementation engineer is deploying a new VxRail cluster What should they confirm before installing the hardware?

Options:

A.

At least 24 in (61 cm) of clearance exists in front of and behind the cabinet

B.

Redundant power zones exist with adequate power cables

C.

Power distribution supports only the power rating of a single node

D.

Service laptop is on the same IP network as the iDRACs

Buy Now
Questions 6

During the activation of Internal SRS, the implementation engineer receives a message that the deployment has failed What is a possible cause?

Options:

A.

SRS VE Gateway on the same subnet as the VxRail Manager

B.

VxRail status already set to installed ' in IB database

C.

Site ID mismatch between the IB database and the SRS Wizard

D.

Witness Gateway not configured following Dell best practices

Buy Now
Questions 7

Which requirement must be met when expanding a 3-node VxRail G560F cluster with a fourth G Series node in the same chassis?

Options:

A.

PCIe network card must be added to all nodes

B.

Node requires only the same drive configuration

C.

Node hardware must be identical to the other three nodes

D.

New node must be at the same VxRail version as existing nodes

Buy Now
Questions 8

What is a supported witness configuration for a 3+3+1 VxRail Stretched Cluster?

Options:

A.

vSAN Witness appliance with customer provided license

B.

Physical ESXi host with included cluster license

C.

Physical ESXi host with multiple VxRail clusters as witness

D.

vSAN Witness appliance or a physical ESXi host

Buy Now
Questions 9

What is a difference between vSAN Data-In-Transit Encryption and vSAN Data-At-Rest-Encryption?

Options:

A.

Data-In-Transit Encryption: Encrypts traffic between VMs and the VxRail nodes

Data-At-Rest Encryption: Encrypts traffic between VxRail nodes only

B.

Data-In-Transit Encryption: Does not require a Key Management Server

Data-At-Rest Encryption: Requires a Key Management Server

C.

Data-In-Transit Encryption: Key Management Server must reside on the vSAN cluster

Data-At-Rest Encryption: Key Management Server can reside on the vSAN cluster

D.

Data-In-Transit Encryption: Addresses fear of media theft

Data-At-Rest Encryption: Addresses fear of rogue administrators

Buy Now
Questions 10

According to the VxRail PEQ Engagement Details worksheet, links to what resources should the SE send to the customer?

Options:

A.

VxRail vCenter Server Planning Guide

Network Validation Tool

B.

VxRail vCenter Server Planning Guide

VxRail Network Planning Guide

C.

VxRail QuickStart Guide

VxRail Network Planning Guide

D.

VxRail QuickStart Guide

Network Validation Tool

Buy Now
Questions 11

What is a consideration when implementing a custom VDS on a VxRail cluster?

Options:

A.

Used by multiple clusters managed by a single vCenter instance

B.

Supported with external and internal vCenter Servers

C.

Supports only four NIC uplinks

D.

Supports only two NIC uplinks

Buy Now
Questions 12

Which VxRail Series is designed to support a VDI environment and requires a GPU card in each host?

Options:

A.

S Series

B.

V Series

C.

G Series

D.

P Series

Buy Now
Questions 13

An implementation engineer is expanding an existing VxRail E Series cluster with an additional node The version of the node is not at the current cluster level and is not compatible

What action must be performed before adding the node?

Options:

A.

Order node with correct image

B.

RASR Factory Reset

C.

RASR Factory Image Upgrade

D.

Compute node expansion

Buy Now
Questions 14

What is a consideration when performing a VxRail software upgrade from version 4.7.xxx to version 7.0.xxx?

Options:

A.

External vCenter server must be upgraded after the VxRail is upgraded

B.

vCenter Server requires a temporary IP address on a different subnet before the upgrade

C.

Secure boot must be enabled on the ESXi hosts for a successful upgrade

D.

VxRail Manager VM must be changed to the default name to avoid an upgrade failure

Buy Now
Questions 15

What is the recommended format for host names when using the VxRail Deployment Wizard for an External vCenter solution?

Options:

A.

FQDN for vCenter Server

Host name for VxRail Manager

B.

Host name for both vCenter Server and for VxRail Manager

C.

FQDN for both vCenter Server and for VxRail Manager

D.

Host name for vCenter Server

FQDN for VxRail Manager

Buy Now
Questions 16

What must be used when deploying VxRail with a customer-supplied VDS?

Options:

A.

Deployment Wizard using the configuration file method

B.

Deployment Wizard using the step-by-step method

C.

VxRail API with configuration file

D.

VxRail PowerShell SysBringUp Module

Buy Now
Questions 17

An implementation engineer is in the validation phase of a VxRail deployment with two Dell EMC ToR switches. Which command should they run on each of the ToR switches to validate that Link Aggregation has been configured according to Dell best practices for VxRail node interfaces?

Options:

A.

show network-policy profile

B.

show interface status

C.

show port-channel summary

D.

show interface

Buy Now
Questions 18

Match each VxRail API request with the information to be retrieved.

D-VXR-DY-23 Question 18

Options:

Buy Now
Questions 19

What code is returned when a VxRail API request is executed successfully?

Options:

A.

200

B.

207

C.

400

D.

500

Buy Now
Questions 20

A systems engineer is tasked to configure a VxRail cluster and notices that the VxRail Deployment Wizard fails to launch. The engineer discovers that the software is corrupted.

What should the engineer do to address the issue?

Options:

A.

Use the VMware Host Client and iDRAC to access the nodes for troubleshooting

B.

Verify that the JSON file is not corrupted and has all the required values

C.

Return the nodes to the original build state

D.

Check vCenter and troubleshoot the build failure

Buy Now
Questions 21

A customer has decided that they will be using the Spanning Tree protocol in their Dell EMC ToR switches How should the switch ports used for VxRail be configured to achieve a successful deployment?

Options:

A.

Set the port type to edge

B.

Enable link aggregation for all ports

C.

Set the port mode to access

D.

Enable MLD snooping and querier

Buy Now
Questions 22

For which typical activity would the Full data migration setting be used when placing a VxRail host into maintenance mode?

Options:

A.

Temporary maintenance

B.

Rebooting a single ESXi host

C.

Shutting down an entire cluster

D.

Permanently removing host from cluster

Buy Now
Questions 23

An implementation engineer places a VxRail node into maintenance mode using the Ensure accessibility setting What is the engineer likely planning to do?

Options:

A.

Extensive maintenance

B.

Temporary maintenance

C.

Permanent removal of host from cluster

D.

Shutdown of an entire cluster

Buy Now
Questions 24

An implementation engineer is configuring External SRS. Where can they find the installation files for SRS VE?

Options:

A.

VxRail Support Matrix

B.

VxRail Manager

C.

SolVe Online

D.

Dell Support Page

Buy Now
Questions 25

What are the requirements for a customer-supplied VDS in a VxRail deployment?

Options:

A.

4 or 8 uplinks

Port groups for Discovery, Management, vMotion, and vSAN only

B.

2 or 4 uplinks

Port groups for Discovery, Management, vMotion, and vSAN only

C.

2 or 4 uplinks

Port groups for Discovery, Management vCenter Server, vMotion, and vSAN

D.

4 or 8 uplinks

Port groups for Discovery, Management, vCenter Server, vMotion, and vSAN

Buy Now
Questions 26

What is a characteristic of the VxRail S Series node?

Options:

A.

Form factor of 2U4N

B.

Large form factor drives

C.

Dense Flash disks

D.

Form factor of 1U1N

Buy Now
Questions 27

A company has recently implemented a popular date center monitoring and reporting software solution. They plan to use the solution to consolidate reporting into a single platform.

What is an expected benefit of programmatically gathering VxRail information?

Options:

A.

Perform node shutdowns and specific operations

B.

Perform pre-checks for vSAN health

C.

Automate iDRAC firmware management and status

D.

Obtain status of all running operations on a cluster

Buy Now
Questions 28

What is the maximum number of supported nodes for a VxRail cluster running on a 1 GbE network?

Options:

A.

4

B.

5

C.

16

D.

32

Buy Now
Questions 29

Use the VxRail simulator to explore the system. What is the presented configuration?

Note: It fs necessary to close (x) the simulator window before you can select a response to this question.

D-VXR-DY-23 Question 29

D-VXR-DY-23 Question 29

D-VXR-DY-23 Question 29

D-VXR-DY-23 Question 29

D-VXR-DY-23 Question 29

Options:

A.

Internal vCenter and external DNS

B.

Internal vCenter and Internal DNS

C.

External vCenter and external DNS

D.

External vCenter and internal DNS

Buy Now
Questions 30

A VxRail API request has been executed and the user account does not have vCenter privileges to perform the task What code is returned?

Options:

A.

200

B.

207

C.

403

D.

500

Buy Now
Exam Code: D-VXR-DY-23
Exam Name: Dell VxRail Deploy 2023
Last Update: May 29, 2026
Questions: 102

PDF + Testing Engine

$64.99   $185.69

Testing Engine

$49.99   $142.83

PDF (Q&A)

$54.99   $157.11