What is the difference between a raised floor and a solid floor?

Options:

A.

Raised floor allows for better airflow and cable management

B.

Solid floor allows for better cooling efficiency and higher load capacity

C.

Raised floor is cheaper and easier to install

D.

Solid floor is more flexible and adaptable to changing needs

Buy Now
Questions 5

According to NEB, what is the recommended range for the low temperature in a data center?

Options:

A.

65 degrees

B.

60 degrees

C.

55 degrees

D.

70 degrees

E.

75 degrees

Buy Now
Questions 6

What is the distance from the bottom of the access floor to the bottom of the cable tray?

Options:

A.

6 inches

B.

7 inches

C.

8 inches

D.

9 inches

E.

10 inches

Buy Now
Questions 7

what is the ANSI/TIA-942 typical range of pressure differential regarding positive pressure for data center.

Options:

A.

Less than or equal to –0,1 in water column (-25 Pa)

B.

More than -0,005 in wc ( < -1,24 Pa), but less than or equal to +0,05in wc (+12,4 Pa)

C.

More than +3in wc ( > 746Pa),but less than or equaltto+6,in wc(1492 pa))

D.

Less Than –4,+4 inches water column(-1000 opa ,+100 < pa > )

Buy Now
Questions 8

What is the recommended level of redundancy for a critical power system in a Tier III data center?

Options:

A.

N

B.

N+1

C.

2N

D.

2N+1

E.

3N

Buy Now
Questions 9

What are the different generator ratings?

Options:

A.

Standard, Backup and Emergency

B.

Prime, Continuous and Standby

C.

Primary, Secondary and Tertiary

D.

Normal, Redundant and Fault-tolerant

Buy Now
Questions 10

Where should telecom cabling be routed under an access floor?

Options:

A.

In the cold aisle

B.

Above the access floor

C.

In the plenum space

D.

In the equipment room

E.

In the office area

Buy Now
Questions 11

what is minimum recommended space for secured storage area?

Options:

A.

100 square feet

B 240 square feet

B.

250 square feet

C.

280 square feet

D.

None of above

Buy Now
Questions 12

What is the clearance required for the hot aisle width?

Options:

A.

2 ft

B.

4 ft

C.

6 ft

D.

8 ft

Buy Now
Questions 13

What is the difference between a hot aisle and a cold aisle containment system?

Options:

A.

Hot aisle containment system encloses the hot aisle to prevent mixing with the cold air while cold aisle containment system encloses the cold aisle to prevent mixing with the hot air

B.

Hot aisle containment system is more efficient in terms of cooling than cold aisle containment system

C.

Cold aisle containment system is more cost-effective than hot aisle containment system

D.

Hot aisle containment system is more flexible and adaptable to changing needs than cold aisle containment system

Buy Now
Questions 14

What is the Fourth Preference Regarding Utility Service?

Options:

A.

At least two circuits from one substation fed via alternative power grid

B.

Two balanced feeds with different voltages derived from a single distribution station

C.

One circuit from one substation, separate paths

D.

At least four circuits each from different distribution stations but fed via common feeders

Buy Now
Questions 15

What should be done with unused rack space?

Options:

A.

it should be filled with blanking devices to reduce non-functional airflow

B.

it should be used for additional storage purposes

C.

it should be left open to allow for better ventilation

D.

they should be turned off to save energy costs

Buy Now
Questions 16

What is the third preference regarding electricity supply?

Options:

A.

At Least Two Circuits From Same Power Grid But Different Substations And Separate Paths

B.

One Balanced Feeder Coordinated With Upstream Backup Feed

C.

One Circuit From Single Sub Station Fed Via Additional Path from Alternate Power Grid

D.

Two Balanced Feeds With Same Voltage Derived From A Single Distribution Station

Buy Now
Questions 17

Which network topology uses the least amount of cabling?

Options:

A.

Star

B.

Mesh

C.

Bus

D.

Top of Rack

Buy Now
Questions 18

What types of electrical equipment is typically located inside the computer room

Options:

A.

power distribution units, not power distribution equipment, remote power panels, and power strips

B.

transformers only

C.

Uninterrupted Power Supply (UPS) only

D.

Circuit Breakers only

Buy Now
Questions 19

what is another main function of the entrance room?

Options:

A.

to house the telecommunications main grounding busbar

B.

to store backup telecommunication devices

C.

as a dedicated location outside building

D.

None of these

Buy Now
Questions 20

Apart from marine cargo ports, hazardous material transport roadways, transportation roadways, and flight paths, what other things should a data centre be at least one mile away from?

Options:

A.

Waste-disposal units and dumpsites only.

B.

Petroleum storage installations like petrol stations & oil storage facilities only.

C.

Fireworks manufacturing companies only.

D.

All of The Above

Buy Now
Questions 21

What is the recommended range for the low temperature in a data center according to ASHRAE?

Options:

A.

64.4 degrees

B.

60 degrees

C.

55 degrees

D.

70 degrees

E.

75 degrees

Buy Now
Questions 22

What type of slope is considered too extreme for a data center site?

Options:

A.

5%

B.

10%

C.

15%

D.

20%

Buy Now
Questions 23

What is the switch gear in an electrical distribution design responsible for?

Options:

A.

Transforming voltage

B.

Delivering power directly to the server racks

C.

Transferring control between utility and generator

D.

Managing cooling systems

Buy Now
Questions 24

What is the smoke development rating required for all materials hosted in a containment system?

Options:

A.

150

B.

300

C.

450

D.

600

Buy Now
Questions 25

where should the secured storage area be located?

Options:

A.

adjacent to the non-secured loading dock

B.

far away as possible from secure data

C.

adjacent to security offices

D.

adjacent to the secured loading dock

E.

None of above

Buy Now
Questions 26

How do you calculate the thermal load of the lighting system inside a data center?

Options:

A.

Rated power * .01

B.

IT load * .01

C.

Rated power * .02

D.

IT load * .02

E.

Rated power * .05

Buy Now
Questions 27

Which areas should generate a history of all access attempts and monitored by CCTV Security System?

Options:

A.

Only computer rooms

B.

Storage Areas

C.

Any concealed places

D.

Loading Docks

E.

Computer rooms, Loading docks, storage areas, Staging areas and Vendor Storage

Buy Now
Questions 28

What are the 3 types of Authentication for access control?

Options:

A.

Type 4 - What you possess

B.

Type 5 - What you desire

C.

Type 6 - What you create

D.

Type 1 - What you have

Type 2 - What you know

Type 3 - What you are

Buy Now
Questions 29

what room should the battery room be adjacent to?

Options:

A.

the electrical Room

B.

computing Room

C.

Mechanical Room

D.

Security Rooms

E.

Non-combustible materials

F.

all

Buy Now
Questions 30

What is the recommended raised floor height, especially for high density needs and underfloor HVAC?

Options:

A.

24 "

B.

30 "

C.

36 "

D.

42 "

Buy Now
Questions 31

what is the ASHRAE maximum relative humidity recommended.

Options:

A.

45%

B.

50%

C.

55%

D.

60%

Buy Now
Questions 32

Where should the entrance room be located within a data center?

Options:

A.

In the computer room

B.

In a separate building on the campus

C.

Adjacent to or in a secured space within the computer room

D.

Anywhere with easy access to the outside

Buy Now
Questions 33

where is the storage room located?

Options:

A.

away from computer room, adjacent to equipment entrance at data center

B.

next door to computing area

C.

outermost point of Data Centre

D.

Near Backup Generator

E.

All

Buy Now
Questions 34

What is the ASHRAE TC 9.9 recommended range for humidity levels in a data center?

Options:

A.

20-50%

B.

40-60%

C.

60-80%

D.

80-100%

Buy Now
Questions 35

What are the 2 minimum thicknesses of regular floor slabs?

Options:

A.

4 inches and 6 inches

B.

6 inches and 8 inches

C.

8 inches and 10 inches

D.

10 inches and12inches

Buy Now
Questions 36

What is the recommended clearance space required for hot and cold aisles in a data center?

Options:

A.

1-2 feet

B.

3-4 feet

C.

5-6 feet

D.

7-8 feet

Buy Now
Questions 37

How far should Data Center be located from Commercial Airport?

Options:

A.

At Least 3 Miles

B.

At Least 5 Miles

C.

At least 10 miles

D.

None of the above.

Buy Now
Questions 38

What is the recommended amount of fuel supply to be available to a class F4 data center?

Options:

A.

24 hours

B.

48 hours

C.

72 hours

D.

96 hours

Buy Now
Questions 39

What is the function of an emergency generator?

Options:

A.

provide backup power to IT equipment only

B.

supply power to the restrooms during a utility outage

C.

back up office lighting

D.

all of the above

Buy Now
Questions 40

What is the minimum separation distance for redundant utility service feeds

Options:

A.

4 feet along entire route

B.

22 feet along entire route

C.

44 feet along entire route

D.

66 Feet Along the Entire Route

Buy Now
Questions 41

What is the recommended front of rack aisle width?

Options:

A.

2 feet

B.

3 feet

C.

4 feet

D.

5 feet

Buy Now
Questions 42

What is the low temperature that must be maintained in a data center according to NEB standards?

Options:

A.

55 degrees

B.

60 degrees

C.

65 degrees

D.

70 degrees

E.

75 degrees

Buy Now
Questions 43

what is the hydrogen maximum for a data center?

A .1 % of total room volume

B .15%of total room volume

C .20%of total room volume

D. None Of These answers

Options:

Buy Now
Questions 44

what can take up to40 percent of overall space in the equipment area?

Options:

A.

circulation and support equipment

B.

principal loads

C.

computer

D.

electrical equipments

E.

redistribution systems

F.

all of above

Buy Now
Questions 45

What is the clearance required between AC units?

Options:

A.

Min. of 2 ft but recommended 6 ft.

B.

Min. of 4 ft but recommended 6 ft.

C.

Min. of 6 ft but recommended 8 ft.

D.

Min. of 8 ft but recommended 10 ft.

Buy Now
Questions 46

What are three primary considerations in designing the power systems space plan?

Options:

A.

Energy utilization, efficiency of cooling and redundant generators

B.

Physical security, environmental monitoring, backup power source

C.

Reduce transmission loss, conduit path minimizing & spacing requirement for system

D.

Leakage current control, firewall protection & hardening redundancy

Buy Now
Questions 47

What is the ASHRAE TC 9.9 recommended range for static pressure in a data center?

Options:

A.

0.01-0.05 inches water gauge

B.

0.05-0.1 inches water gauge

C.

0.1-0.15 inches water gauge

D.

0.15-0.2 inches water gauge

Buy Now
Exam Code: DCDC-002
Exam Name: BICSI Data Center Design Consultant – DCDC
Last Update: Apr 30, 2026
Questions: 158

PDF + Testing Engine

$63.52  $181.49

Testing Engine

$50.57  $144.49
buy now DCDC-002 testing engine

PDF (Q&A)

$43.57  $124.49
buy now DCDC-002 pdf