Spring Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: pass65

Development-Lifecycle-and-Deployment-Architect Salesforce Certified Development Lifecycle and Deployment Architect (SP25) Questions and Answers

Questions 4

Universal Containers (UC) is embarking on a large program of work, with different projects and different vendors. UC created a center of excellence (COE) that is struggling with scope creep between the different projects.

What role should the architect suggest be added to the COE?

Options:

A.

Scrum master

B.

Release managers

C.

Product owner

D.

Change managers

Buy Now
Questions 5

Universal Containers has recently acquired another business that uses Salesforce extensively. UC wants to merge their Salesforce Orgs to effectively sell and service customer under one business. Traditionally, UC has followed an agile development methodology to deliver Salesforce functionality. With the merging businesses, UC is convinced that adopting a Waterfall development methodology is the best approach. Which are two positive aspects of using a Waterfall development methodology?

Options:

A.

Changes late in the process are expected and can be handled by integrating them into the requirements specs.

B.

Complex processes that will need to be built are thoroughly understood and documented before coding begins.

C.

Milestones, timelines and estimates tend to be more accurate and predictable due to the upfront due diligence.

D.

The costs of starting the project are low since much of the design work is pushed to later stages of the process.

Buy Now
Questions 6

Universal Containers CUC) is an enterprise financial company that operates in EMEA, AMER, and APAC. Because of regulatory requirements, UC has a separate Salesforce org for each region. Each org has its own customizations that fit for the region needs, but there are also standard processes that apply to all regions requirements.

As the deployment architect, what should be considered for the multi-org deployment strategy?

Options:

A.

Deploy metadata to production orgs using managed packages.

B.

Deploy metadata to production orgs using unmanaged packages.

C.

Deploy metadata to production orgs using package development model.

D.

Deploy metadata to production orgs using change sets.

Buy Now
Questions 7

Universal Containers has discovered a Sev0 defect in production. Tens of thousands of records will be created with incorrect data in minutes, producing significant brand damage as a consequence. The Salesforce administrator has suggested that the defective text field be replaced with a new picklist field directly in production. The page layout will be modified so that the text-field is removed and the new picklist field added.

What should the Salesforce architect advise?

Options:

A.

Deny the suggestion and explain to everyone that the risk is too high and the next release window is on the weekend.

B.

Pair with the administrator, and review each change as it happens

C.

Explain that only developers are certified to make changes directly in production.

D.

Call the security team and begin organizing d penetration test.

Buy Now
Questions 8

Universal Containers (UC) is implementing Salesforce for the first time. Their legacy CRM system is an on-premise home-grown application written in Java. UC plans to implement a continuous integration process that mirrors their current standard. Under what conditions should an Architect recommend against continuous integration?

Options:

A.

Test scripts will be generated as part of the testing phase

B.

There isn ' t a full sandbox available to leverage

C.

The Salesforce instance has only standard functionality

D.

The client does not have the budget for additional software

Buy Now
Questions 9

What are two advantages of automated test data loads over manual data loads

Choose 2 answers

Options:

A.

Automated loads can be done with no human oversight.

B.

FRED Automated loads are reliable in their results.

C.

Automated loads cannot be scripted by CICD tools.

D.

Automated loads will increase costs.

Buy Now
Questions 10

Universal Containers (UC) has multiple development teams that work on separate streams of work, with different timelines. Each stream has different releases of code and config, and thedelivery dates differ between them.

What is a suitable branching policy to recommend?

Options:

A.

Leaf-based development

B.

Trunk-based development

C.

GitHub flow

D.

Scratch-org-based development

Buy Now
Questions 11

Universal Containers CUC) is embarked on a large Salesforce transformation journey, UC ' s DevOps team raised a question about tracking Salesforce metadata throughout the development lifecycle across sandboxes all the way to production.

As the deployment architect of the project, what should be the recommendation to track which version of each feature in different environments?

Options:

A.

Use an Excel sheet to track deployment steps and document the SFDX commands.

B.

Use an AppExchange or third-party tool that is specialized in Salesforce deployment.

C.

Use Change Set to track deployed customizations.

D.

Use Salesforce SFDX commands to deploy to different sandboxes.

Buy Now
Questions 12

Universal Containers (UC) had implemented two full sandboxes. One, known as Stage,

is used for performance, regression testing, and production readiness check. The other is used primarily for user acceptance testing (UAT). Both full sandboxes were refreshed two months ago. Currently, UC is targeting to start user acceptance testing in two weeks, and do production release in four weeks. An admin also realized Salesforce will have a major release in six weeks.

UC needs to release on the current Salesforce version, but also wants to make sure the new

Salesforce release does not break anything

What should an architect recommend?

Options:

A.

Refresh Stage now, and do not refresh UAT. This way, Stage will be on preview and UAT will not.

B.

Use the Sandbox Preview Guide to check if there is any necessary action needed. UC might have to prepare, refresh, and redeploy to UAT.

C.

Visit trust.salesforce.com to figure out the preview cutoff dates, if the dates had passed, work with support to get on the preview instance.

D.

Refresh Stage from UAT now. After preview cutoff, use the upgraded one for regression test, use the non-upgraded one for user acceptance Test.

Buy Now
Questions 13

What are three necessary components for establishing a governance framework? Choose 3 answers

Options:

A.

Automated Testing

B.

Requirements Management

C.

Change Control Log

D.

Documentation Repository

E.

Continuous Integration

Buy Now
Questions 14

When replacing an old legacy system with Salesforce, which two strategies should the plan consider to mitigate the risks associated with migrating data from the legacy system to Salesforec? Choose 2 answers?

Options:

A.

Identify the data relevant to the new system, including dependencies, and develop a plan/scripts for verification of data integrity.

B.

Migrate users in phases based on their functions, requiring parallel use of legacy system and Salesforce for certain period of time.

C.

Use a full sandbox environment for all the systems involved, a full deployment plan with test data generation scripts, and full testing including integrations.

D.

Use a full sandbox environment and perform test runs of data migration scripts/processes with real data from the legacy system.

Buy Now
Questions 15

Universal Containers CUC) has decided to improve the quality of work by the development teams. As part of the effort, UC has acquired some code review software licenses to help the developers with code quality.

Which are two recommended practices to follow when conducting secure code reviews? Choose 2 answers

Options:

A.

Generate a code review checklist to ensure consistency between reviews and different reviewers.

B.

Focus on the aggregated reviews to save time and effort, to remove the need to continuously monitor each meaningful change.

C.

Conduct a review that combines human efforts and automatic checks by the tool to detect all flaws.

D.

Use the code review software as the tool to flag which developer has committed the errors, so the developer can improve.

Buy Now
Questions 16

Which are the two key benefits of fully integrating an agile issue tracker with software testing and continuous integration tools? Choose 2 answers?

Options:

A.

Developers can see automated test statuses that commit on a specific user story.

B.

Developers can collaborate and communicate effectively on specific user stories.

C.

Developers can observe their team velocity on the burn chart report in the agile tool.

D.

Developers can use the committed code ' s build status directly on the user story record.

Buy Now
Questions 17

Universal Containers has defined a software tool to support Agile processes, but the

development team is not regularly updating the status of their work in progress.

What Scrum value is compromised by this bad practice, and why?

Options:

A.

Courage, because the teams should be transparent about progress and speak up when they need help.

B.

Openness, because the team is not open to a new methodology.

C.

Focus, because the teams are not focusing in the agile process expected activities.

D.

Commitment, because the team is not committed to follow the Agile methodology.

Buy Now
Questions 18

What are two advantages of using an Agile Project Management tool? Choose 2 answers

Options:

A.

Increased visibility into sprint and project status

B.

Better relationships with business stakeholders

C.

Consolidate project artifacts to a common repository

D.

Improve governance with gate steps in development

Buy Now
Questions 19

A Salesforce Administrator has initiated a deployment using a change set. the deployment has taken more time than usual. What is the potential reason for this?

Options:

A.

The change set includes changes to permission sets and profiles.

B.

The change set includes Field type changes for some objects.

C.

The change set includes new custom objects and custom fields.

D.

The change set performance is independent of the included components.

Buy Now
Questions 20

The release will be deployed over a weekend, one week after Salesforce updates the production environment (e.g., from Winter to Spring). UC has found that a full sandbox refresh can take several days. What should the architect suggest as an optimal deployment plan?

Development-Lifecycle-and-Deployment-Architect Question 20

Options:

A.

Two weeks before go -live, deploy to Staging and then refresh the Staging and Production support sandboxes. Deploy from Staging to Production at go-live

B.

Approximately six weeks before go -live, ensure the sandbox will be on the release preview. One week before go live, deploy to Staging. Deploy from Staging to Production at go-live

C.

One month before go -live, deploy to Staging and to Production Support. Deploy from Production Support to Production at go-live

D.

One week before go -live, initiate the Staging sandbox refresh and then immediately deploy to Staging. Deploy from Staging to Production at go-live

Buy Now
Questions 21

Universal Containers (UC) has multiple teams with major projects working

concurrently in their own developer sandboxes. After deploying to production, a bug is

discovered. Due to tight timelines, the development team has suggested correcting the bug in the user acceptance testing (UAT) environment, which is a full copy sandbox.

What should the architect recommend?

Options:

A.

UC should spin up a new sandbox to use as a hot fix environment. Once the bug is corrected, the change should be applied to production and downstream environments.

B.

The fix should be made in the developer environment where the project work was done. Once the fix has been made, it should go through a full deployment/testing process and adhere to the normal project cadence.

C.

Since the issue was found in production, it should be treated as a change request and go into the backlog as an enhancement.

D.

Correcting the bug in UAT is ideal. Since UAT is a full copy, it will be the fastest location to fix and test the resolution.

Buy Now
Questions 22

There has been an increase in the number of defects. Universal Containers (UC) found the root cause to be decreased in quality of code. Which two options can enforce code quality in UC ' s continuous integration process? Choose 2 answers

Options:

A.

Introduce manual code review before deployment to the testing sandbox.

B.

Introduce manual code review before deployment to the production org.

C.

Increase the size of the testing team assigned to the project.

D.

Introduce static code analysis before deployment to the testing sandbox.

Buy Now
Questions 23

Universal Containers (UC) is developing a custom Force.com application. The following tools are used for development, the Force.com IDE for developing apps. Git as a source control system and a Git repository, and the Force.com Migration Tool for updating sandboxes from source control. UC ' s current branching strategy calls for two main branches: 1) Master 2) Develop Three supporting branches: 1) Feature 2) Release 3) Hotflix Consider that the branching strategy is in parallel as follows Feature |Develop |Release |Hotfix |Master What is the recommended practice strategy that Developers should adopt for Development?

Options:

A.

Developers work off of the Feature branch, which is pulled from the Master branch and the Feature branch is then merged with the Develop branch.

B.

Developers work off of the Feature branch, which is pulled from the Develop branch, and the Feature branch is then merged with the Develop branch.

C.

Developers work off of the Feature branch, which is pulled from the Release branch, and the Feature branch is then merged with the Develop branch.

D.

Developers work off of the Feature branch, which is pulled from the Develop branch, and the Feature branch is then merged with the Hotfix branch.

Buy Now
Questions 24

There are many types of quality assurance techniques that can help minimize defects in software projects.

Which two techniques should an architect recommend, for Universal Containers to incorporate into its overall CI/CD pipeline?

Choose 2 answers

Options:

A.

Business verification testing

B.

Stress testing

C.

Automated browser testing

D.

Static code quality analysis

Buy Now
Questions 25

What is a main characteristic of an agile team?

Options:

A.

The team uses Scrum, Kanban, and Extreme Programming.

B.

The team has biweekly sprints to ensure on-time delivery.

C.

The team delivers new releases on dates defined in the beginning of the project, following a project plan

D.

The team improves and evolves its processes and frequently delivers value to the end users.

Buy Now
Questions 26

Universal Containers is planning to release simple configuration changes and enhancements to their Sales Cloud. A Technical Architect recommend using change sets. Which two advantages would change sets provide in this scenario? Choose 2 answers

Options:

A.

An easy way to deploy related components.

B.

The ability to deploy a very large number of components easily.

C.

A simple and declarative method for deployment.

D.

The ability to track changes to component.

Buy Now
Questions 27

Universal Containers uses multiple Salesforce orgs for its different lines of business (LOBs). In a recent analysis, the architect found that UC could have a more complete view of its customers by gathering customer data from different orgs.

What two options can an architect recommend to accomplish the customer 360-degree view?

Choose 2 answers

Options:

A.

Implement a Complete Graph multi-org strategy by allowing each org to connect directly to every other, reading and writing customer data from the orgs where it has been originally created.

B.

Migrate from multi-org to single-org strategy, consolidating customer data in the process.

C.

Implement a Single Package multi-org strategy by developing and deploying to all orgs a managed package which reads and consolidates customer 360-degree view from the different orgs.

D.

Implement a Hub-and-Spoke multi-org strategy by consolidating customer data In a single org, which will be the master of customer data, and using integration strategies to let the LOBs orgs read and write from it.

Buy Now
Questions 28

As a part of technical debt cleanup project, a large list of metadata components has been identified by the business analysts at Universal Containers for removal from the Salesforce org. How should an Architect manage these deletions across sandbox environments and production with minimal impact on other work streams?

Options:

A.

Generate a destructivechanges.xml file and deploy the package via the Force.com Migration Tool

B.

Perform deletes manually in a sandbox and then deploy a Change Set to production

C.

Assign business analysts to perform the deletes and split up the work between them

D.

Delete the components in production and then refresh all sandboxes to receive the changes

Buy Now
Questions 29

Universal Containers (UC) had been using change sets for deploying all of the

modifications to its Sales Cloud apps. After multiple business units joined the single Salesforce

instance, there is a need to evaluate which development model is the most suitable for UC. The

IT management has shown a particular interest in finding out more about the package

development model.

As an architect, which two statements can be made to articulate the differences between the

change set model and package development model?

Choose 2 answers

Options:

A.

In package development, the source of truth is the metadata in the package project, which makes it easy to integrate to a version control System.

B.

A change set can be retrieved from the developer’s workbench as a package, then pushed into the version control system to achieve the Versioning control.

C.

In change set development, the source of truth is a combination of the metadata already in the environment and the content of your change Set.

D.

In package development, the best practice is to consider the dependencies and build the dependencies into the package so it can be deployed in any other target orgs.

Buy Now
Questions 30

Universal Containers has multiple projects being developed in parallel. One of the projects is in the testing phase and the testing team found a list of issues on the items that will be deployed to production. As the project deadline is short, the customer team proposes that the fixes be done in the test sandbox and then deployed to production. What should be the Architect recommend?

Options:

A.

Recommend the customer team ' s proposal to fix the issues in the testing environment and deploy them to production.

B.

Recommend fixing the issues in the development environment and deploying the changes to production.

C.

Recommend fixing the issues in the development sandbox, migrating them to testing, and deploy to production after testing.

D.

Recommend fixing the issues in the test environment and migrating the changes to the development sandbox.

Buy Now
Questions 31

Universal Containers (UC) has been following the Waterfall methodology to deliver customer apps in Salesforce. As the business is growing at scale and with demand to incorporate features and functionality at faster pace, UC is finding the Waterfall approach is not an optimal process, and intends to transition towards an agile development methodology. Which are the two strengths of using an agile development methodology? Choose 2

Options:

A.

Careful documentation is done at each step of the process so a target body of knowledge is available for inspection.

B.

There are many small releases of functional code, allowing stakeholders to see and touch the work in progress.

C.

All elements of the build are fully understood before work begins, reducing risk of unpleasant surprises.

D.

The project requirements in later phases are expected and accommodated by the process, by design.

Buy Now
Questions 32

Universal Containers has just initiated a project to implement a custom container tracking application with a large development team. The project manager is concerned that the large number of developers in a single developer pro sandbox could lead to challenges with code being overwritten. Which two methods should be used to mitigate this risk? Choose 2 answers

Options:

A.

Provide each developer their own sandbox developer org and implement a code repository and continuous integration to merge code into the developer pro sandbox

B.

Replace the developer pro sandbox with a Partial copy sandbox

C.

Use a single sandbox and strictly coordinate development across shared components, and implement a code repository to allow developers to merge code into a common repository

D.

Provide each developer their own sandbox developer org, and implement managed packages to deploy to the merge

Buy Now
Questions 33

Salesforce has three major releases a year.

Which type of change introduced by a release can cause automated browser tests to need updating?

Options:

A.

DOM changes

B.

New standard fields

C.

Metadata schema changes

D.

New Apex methods

Buy Now
Questions 34

Universal Containers has a highly integrated environment with significant process orchestration between systems. When refreshing UAT, Objects that have external Ids from Production no longer point to valid External Ids in the UAT environment.

What should an Architect do to resolve this?

Options:

A.

Let UAT point to production integrations and rollback each transaction after it finishes.

B.

Delete all the data and use an Automated testing tool to create new data across all the systems in UAT.

C.

Mask the External Id so nobody can see the production value.

D.

In the post refresh plan, modify external ids to a known valid set of values for UAT.

Buy Now
Questions 35

What are three advantages of using a Source Control system alongside a multi -sandbox development strategy? Choose 3 answers

Options:

A.

Perform code reviews before promoting to a pre -production sandbox

B.

Automatically deploy changes from sandbox to production

C.

Keep a history of changes made by each developer

D.

Create a branching strategy that tracks each feature or change separately

E.

Act as a backup in case of catastrophic data loss

Buy Now
Questions 36

Universal Containers (UC) has gone through a global organization restructuring and

process review during the last year, which triggered a review of its Salesforce org strategy. After

thorough analysis of its org and global customers, UC decided to start a project to merge its

Salesforce orgs, going from a multi-org to a single-org strategy.

In this scenario, what are three benefits going to a single-org strategy?

Choose 3 answers

Options:

A.

Lower administration overhead costs.

B.

Improved Chatter collaboration across different business units.

C.

Consolidating the business processes would be simplified.

D.

Automatically unify data model among all lines of business.

E.

Easier to get a 360-view of the customer.

Buy Now
Questions 37

Universal Containers (UC) uses a managed package to install an internal Sales app in

five orgs. Within each org there are integrations and local processes with the objects of the

managed package. UC wants to use unlocked packages for better integration with CI/CD

processes.

What would the Salesforce architect recommend for this migration?

Options:

A.

Export all data from objects/fields of the managed package, uninstall it, install the unlocked package with the same namespace as the Managed package and restore all data.

B.

Export all data from objects/fields of the managed package, uninstall it, install the unlocked package without namespace and restore all data.

C.

Do not change to unlocked package as it is possible to perform all CI/CD processes with the managed package.

D.

Migrate all classes, Visualforce, and components from the managed package to the unlocked package. Install the new version of the managed package (objects/fields only)and the unlocked package with the other components.

Buy Now
Questions 38

Universal Containers CUC) Customer Community is scheduled to go live in the Europe, Middle East, and Africa (EMEA) region in 3 months. UC follows a typical centralized governance model. Two weeks ago, the project stakeholders informed the project team about the recent changes in mandatory compliance requirements needed to go live. The project team analyzed the requirements and have estimated additional budget needs of 30^0 of the project cost for incorporating the compliance requirements.

Which management team is empowered to approve this additional budget requirements?

Options:

A.

Security Review Committee

B.

Project Management Committee

C.

Executive Steering Committee

D.

Change Control Board

Buy Now
Questions 39

The CEO at Universal Containers (UC) is receiving constant complaints from business

stakeholders that the development teams are not frequently delivering value to the end-user. The

CEO talked with the CTO, who argues the opposite, explaining that the development teams are

delivering value every Sprint.

The architect suggests to the CTO to implement Kanban to solve this disagreement.

How can Kanban help clarify whether value is being delivered to the business?

Options:

A.

Kanban teams respond to unplanned work and changes by dropping everything and jumping on the new request, ensuring agility.

B.

Kannan traits includes metrics, like lead time and throughput, which increases transparency.

C.

Kanban can make use of the Salesforce Agile Accelerator to speed up delivery.

D.

Kanban limits work in progress, so the executives will know the development team is not overworked.

Buy Now
Questions 40

Universal Containers is considering developing a client application using the Metadata API for managing deployments to multiple Salesforce orgs. Which two use cases describe the usage of Metadata API? Choose 2 answers

Options:

A.

Perform CRUD operations o manage records in the organization.

B.

Migrate configuration changes between two organizations.

C.

Migrate data changes between two organizations using a csv file.

D.

Export current customization in the organization as an xml file.

Buy Now
Questions 41

Universal Containers (UC) is considering updating their Salesforce Release Management process. Which three best practices should UC consider for Version Control? Choose 3 answers

Options:

A.

Maintain separate developer branches for minor and major releases.

B.

Automation is a must with various application branches in the repository.

C.

Maintain unrestricted access to the release sandboxes for all changes being deployed.

D.

Maintain a single repository for applications with individual branches for projects.

E.

Maintain a single-entry point for production from the master branch.

Buy Now
Questions 42

Universal Containers has several concurrent projects building new functionality, fixing bugs, and modifying existing functionality. Management would like features to be available to users as quickly as possible, even if the entire project is incomplete. What should an Architect recommend to maintain quality?

Options:

A.

Require developers to deploy completed code and unit tests directly to production

B.

Deploy all functionality together to ensure all functionality works together without error

C.

Use a spreadsheet to track approved changes that should be released with change sets

D.

Utilize automated source control, test, and build systems to test and deploy to production

Buy Now
Questions 43

Universal Containers is reviewing its environment strategy. They have identified a need

for a new hotfix environment to resolve any urgent production issues.

Which two sandbox types would be appropriate to use as the hotfix environment?

Choose 2 answers

Options:

A.

Partial Copy sandbox

B.

Developer sandbox

C.

Full sandbox

D.

Developer Pro sandbox

Buy Now
Questions 44

Universal Containers has three types of releases in their release management strategy: daily, minor (monthly), and major (quarterly). A user has requested a new report to support an urgent client request. What release strategy would an Architect recommend?

Options:

A.

Utilize the major release process to create the report directly in production bypassing the full sandbox.

B.

Utilize the minor release process to create the report directly in production bypassing the full sandbox.

C.

Utilize the major release process to create the report in a full sandbox and then deploy it to production.

D.

Utilize the daily release process to create the report directly in a full sandbox and then deploy it to production.

Buy Now
Questions 45

What are three advantages of the package development model?

Choose 3 answers

Options:

A.

Improving team development and collaboration.

B.

Eliminating the need of using change set, which should no longer be used as it can get messy working with package development models.

C.

Facilitating automated testing and continuous integration.

D.

Significantly reducing the need for manually tracking changes.

E.

Providing its own source control, so the source can be deployed In any sandbox orgs.

Buy Now
Questions 46

Universal Containers CUC) is considering implementing a minor change policy for a series of low-risk user stories that are commonly received by the UC admins. The policy would allow admins to make these changes directly in production. UC does not have continuous integration/continuous delivery (CI/CD) in place.

Which three best practices should the architect suggest UC follow for their new change policy? Choose 3 answers

Options:

A.

Minor changes do not need to be documented and can be made at any time.

B.

Minor changes should be thoroughly documented and follow some type of standard cadence.

C.

All changes should still be tested.

D.

CI/CD is required in to successfully manage minor changes.

E.

Downstream environments will not be automatically updated when production changes.

Buy Now
Questions 47

Universal Containers (UC) has a large user base ( > 300 users) and was originally implemented eight years ago by a Salesforce Systems Integration Partner. Since then, UC has made a number of changes to its Visual force pages and Apex classes in response to customer requirements, made by a variety of Vendors and internal teams. Which three issues would a new Technical Architect expect to see when evaluating the code in the Salesforce org? Choose 3 answers

Options:

A.

Multiple triggers on the same object, making it hard to understand the order of operations.

B.

Multiple unit test failures would be encountered.

C.

Broken functionality due to Salesforce upgrades.

D.

Duplicated logic across Visual force pages and Apex classes performing similar tasks.

E.

Custom-built JSON and String manipulation Classes that are no longer required.

Buy Now
Questions 48

Universal Containers (UC) is a high-tech company using SFDX tools and methodologies for its Salesforce development. T UC has moved some of its code and configuration to Unlocked Packages.

Which two best practices should an architect recommend to support UC ' s new package development strategy?

Choose 2 answers

Options:

A.

Version control does not need to be used, as packages manage all the code and configuration.

B.

Test developed packages in test environments before installing to production.

C.

Move everything in the existing codebase to a single monolithic package.

D.

Consult the metadata coverage report to identify features supported by packages.

Buy Now
Questions 49

Universal Containers has many development teams deploying into a single org. The

business is very seasonal and approaching its busiest season. The business owner comes to you

asking for your advice about its next major production release.

What best practice should an architect recommend?

Options:

A.

Make declarative changes in production only.

B.

Bypass regression testing for minor changes.

C.

Avoid releasing near peak business periods.

D.

Developers should conduct user acceptance testing

Buy Now
Questions 50

Universal Containers (\) C) is on the Unlimited Edition of Salesforce orgs. Currently, there are four Developer Pro sandboxes used by dev teams for various purposes, one partial copy sandboxes used for training, one full sandbox used for user acceptance testing. There is another full sandbox used for performance testing during the initial launch, and it is no longer being actively used.

A system administrator had reported yesterday that none of the sandboxes can be refreshed.

What is the most probable action an architect can help the system administrator with?

Options:

A.

It appears the org is using more sandboxes than the license permits. The Partial Copy sandbox shouldn ' t be used.

B.

Create a Salesforce support case, someone should know what is wrong.

C.

Contact the Salesforce Account Team to do a sandbox License Count.

D.

Delete the full sandbox used for performance testing.

Buy Now
Questions 51

UC ' sscale of Salesforce deployment has increased over time, leading to complexities. UC is finding too many bugs in the deployed code, which has become a challenge to the delivery team. The team wants to reduce the amount of bugys by ensuring all the developed code is reviewed, tested, and validated in the upstream deployment process. Which three development practices will be best suited tp address UC ' s concerns? Choose 3

Options:

A.

Use continuous integration with automation testing.

B.

Encourage the development team to be self-organizing.

C.

Enable developer teams to do peer code review.

D.

Incorporate test-driven deployment into the project structure.

E.

Enable a short and timely feedback loop with customers

Buy Now
Questions 52

A developer with Universal Containers recently created a flow in the developer

sandbox. While working on the flow, the developer deactivated it and made updates multiple

times before the flow worked as desired. Now the developer is planning to use a change set to

migrate the flow to the QA sandbox.

What two statements should be considered when migrating the flow with change sets?

Choose 2 answers

Options:

A.

When a change set with a multiple versioned flow is uploaded, it includes only the active version of the flow.

B.

When a change set with a multiple versioned flow is uploaded, it includes all the versions of the flow.

C.

When a change set with a multiple versioned flow is uploaded, and no active version is available, it includes the most recent inactive version of the flow.

D.

When a change set with a multiple versioned flow is uploaded, and no active version is available, it throws an exception.

Buy Now
Questions 53

Universal Containers is in the final stages of building a new application to track custom containers. During a review of the application, a business subject Matter Expert mentioned that it would be nice to be able to track additional container types beyond what was originally scoped during the plan and design phase. Which two actions should be performed to mitigate the risk? Choose 2 answers.

Options:

A.

Escalate and communicate to stakeholders the risk and mitigate it by allocating additional resources to support the new requirement based on stakeholders’ input.

B.

Have a discussion with the business subject Matter Expert and communicate that the Salesforce has limitations in supporting such a feature to mitigate the risk.

C.

Escalate and communicate to stakeholders the risk and mitigate it by extending the timeline of the project to support the new requirement based on stakeholders’ input.

D.

Have a discussion with the business subject Matter Expert and communicate that anew developer environment will be needed to mitigate the risk.

Buy Now
Questions 54

Universal Containers (UC) has a huge volume of metadata that cannot be deployed at once. What is the recommended strategy for UC to be successful with the deployment?

Options:

A.

Identify metadata dependencies, create logical groupings, and deploy in the right order.

B.

Use a continuous integration tool such as Jenkins to deploy in the right order.

C.

Sort and group the metadata alphabetically and deploy them in the same order.

D.

Use a combination of the Ant migration tool and change sets for deployment.

Buy Now
Questions 55

Cloud Kicks is considering using an automated testing tool to help manage deployments between environments.

When should the architect recommend the use of an automated testing tool?

Options:

A.

Automated tests should be run when branches are merged.

B.

Automated tests should be run dally in all Developer Orgs.

C.

Automated tests should be run only when merging into Full or Partial Copy sandboxes.

D.

Automated tests should be run daily in all Developer Orgs, and when branches are merged.

Buy Now
Questions 56

Universal Containers (UC) innovative apps division is releasing an application which can be installed in their trading partners Salesforce environment. The partners can then build on top of the application with process builders and triggers so the container booking process can be integrated with the trading partners own processes. What is the recommended mechanism for releasing the application?

Options:

A.

Zip file deployable by Force.Com Migration Tool.

B.

Unmanaged Package.

C.

Change Sets.

D.

Managed Package.

Buy Now
Questions 57

Universal Containers has automated its deployment process using Metadata API. However, they found that Metadata API doesn ' t support all the components yet. What should be done to address this?

Options:

A.

Deploy unsupported components manually before/after deployment.

B.

Use AppExchange products to deploy unsupported components.

C.

Use change sets for deploying all the unsupported components.

D.

Use the force.com IDE for deploying the unsupported components.

Buy Now
Questions 58

Universal Containers is building a new complex integration to a legacy system. the legacy system is also going through a major upgrade. Senior leadership has committed to the board that the combined programs will be completed on time. What is the risk with this plan?

Options:

A.

The deadline is scheduled during a Salesforce release

B.

The project team has decided to use the Waterfall methodology

C.

The legacy system team is using an Agile methodology

D.

Multiple work -streams with dependencies could impact the go-live

Buy Now
Questions 59

The CTO at Universal Containers decided to principle? Implement the Scrum framework for its agile teams, and communicated a set of Scrum principles to the company.

Which describes a Scrum

Options:

A.

Deliver working software, so if a software component is working, avoid changing it.

B.

Respect other teams by not doing their work (a developer should not test the software).

C.

Create transparency by being honest and clear about timing, planning, and obstacles.

D.

Embrace change by working on a different scope every day.

Buy Now
Questions 60

Which statement is true for the Staging sandbox in the following diagram?

Development-Lifecycle-and-Deployment-Architect Question 60

Options:

A.

When created or refreshed, the Staging sandbox is a full replica of Production

B.

The Staging sandbox is automatically refreshed on a schedule set by the administrator

C.

Salesforce major releases (e.g., Winter to Spring) always occur in Staging and Production at the same time

D.

The Staging environment can only be updated once every two weeks

Buy Now
Questions 61

Universal Containers has a stable continuous integration process and all stakeholders are happy. However, user testing takes longtime, as data has to be setup. What should an Architect do to address this problem?

Options:

A.

Include automated sample data during deployment.

B.

Advise the project manager to assign more users to create test data.

C.

Test data creation is outside the scope of continuous integration.

D.

Train business users to create test data more efficiently.

Buy Now
Questions 62

What are three advantages of using the SFDX?

Choose 3 answers

Options:

A.

Can store code on a local machine, or a version control system.

B.

Can quickly deploy metadata using Execute Anonymous.

C.

Can create scratch orgs.

D.

Can use native Deployment Rollback Tool to quickly revert to prior state.

E.

Can Install application metadata from a central repository.

Buy Now
Questions 63

By to What three tools should an architect recommend to support application lifecycle methodology Choose 3 answers

Options:

A.

Database management systems

B.

Version control repository

C.

Middleware

D.

Continuous integration tool

E.

Issue tracking Tool

Buy Now
Questions 64

What advice should a technical architect provide in a Change Advisory Board meeting?

Options:

A.

Functionality meets the business needs.

B.

Solution is usable by the business.

C.

Solution is technically sound.

D.

Troubleshooting strategies for deployment issues

Buy Now
Questions 65

Universal Containers CUC) has been on the org development model with scratch orgs are already enabled, but they haven ' t been taking advantage of the scratch orgs.

Now UC is ready to move to the package development model.

What step must be done by an administrator?

Options:

A.

In setup, switch both the Enable Dev Hub and Enable 2nd-Generation Managed Packages to Enabled.

B.

In setup, switch the Enable Unlocked Packages to Enabled, keep the Enable Second-Generation Managed Packages as disabled.

C.

In setup, switch the Enable Dev Hub to Enabled, then switch the Enable Source Tracking for Scratch Orgs to Enabled.

D.

In setup, switch the Enable Unlocked Packages and Second-Generation Managed Packages to Enabled.

Buy Now
Questions 66

Sales and Service products will be created by two teams that will use second-generation managed package(s). The Sales team will use a specific function of the Service product, but the architect wants to ensure that this team will only use the functions exposed by the Service team. No other team will use these same functions.

What should an architect recommend?

Options:

A.

Create two second generation managed packages with the same namespace and set the methods that should be shared with the @namespaceAccessible annotation.

B.

Create two managed packages with Sales and service namespaces. Set the methods to be shared with the ©salesAccessible annotation

C.

Create a managed package with both products and create a code review process with an approver from each team.

D.

Create two managed packages. Create an authentication function in the Service package that will return a token if a Sales user is authorized to call the exposed function. Validate the token in the Service functions.

Buy Now
Questions 67

Universal Containers (UC) works with different partners and has few admin resources that take care of the day-to-day deployment tasks. As a result, UC would like to find a way to automate the deployments using Metadata API. Which two limitations of Metadata API should be considered when using Metadata API-based Deployments? Choose 2 answers

Options:

A.

Deploy up to 10,000 files, but retrieve more than 10,000 files.

B.

Maximum size of deployed .zip file is 400MB.

C.

Maximum Size of deployed .zip file is 39MB.

D.

Deploy and retrieve up to 10,000 files at once.

Buy Now
Exam Name: Salesforce Certified Development Lifecycle and Deployment Architect (SP25)
Last Update: May 18, 2026
Questions: 225

PDF + Testing Engine

$64.99   $185.69

Testing Engine

$49.99   $142.83

PDF (Q&A)

$54.99   $157.11