Weekend Sale Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 713PS592

E_S4HCON2023 SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Questions and Answers

Questions 4

You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.

Options:

A.

Apply the corresponding SAP note via SAP Note Assistant

B.

Generate it by analyzing the specific custom code via RFC

C.

Configure it within transaction ATC

D.

Download it from SAP Support Portal

Buy Now
Questions 5

During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?

There are 3 correct answers to this question.

Response:

Options:

A.

Execution of SPAU modification adjustment

B.

Execution of eCATTs for business validation tests

C.

Creation of the table structures in the new SAP HANA database

D.

Execution of SPDD modification adjustment

E.

Execution of XPRAs and AIMs

Buy Now
Questions 6

You are performing an SAP S/4HANA conversion with DMO as an inplace migration. How does SUM transfer the data by default from the source database to the target database during the migration?

Options:

A.

Using R3load and network socket connection

B.

Using R3load and memory pipes

C.

Using R3load and file transfer

D.

Using work processes and network socket connection

Buy Now
Questions 7

What do you need to consider when performing the SI checks for an SAP S'4I 1ANA conversion? Note There are 2 correct answers to this question.

Options:

A.

You need an SAP system based on AS ABAP 7.50 or above for the SI check framework

B.

The SI checks are executed in the development system and the results are transported into the subsequent systems

C.

The errors from the SI checks must be solved, otherwise. SUM will report an error

D.

You need to build up an SI check framework by applying SAP Notes

Buy Now
Questions 8

You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.

The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.

Why are 40 Process Buckets executed in parallel?

Please choose the correct answer.

Response:

Options:

A.

There is a maximum of 40 parallel R31oad processes within this specific downtime phase.

B.

SUM is still running in uptime; the number of 40 defined R31oad processes is considered.

C.

The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.

D.

These are 40 pairs of R3load processes, so there are 80 R3load processes running.

Buy Now
Questions 9

You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?

Please choose the correct answer.

Response:

Options:

A.

Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.

B.

Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.

C.

Perform the Unicode conversion before the upgrade to SAP ECC 6.08.

D.

Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.

Buy Now
Questions 10

In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2 correct answers to this question.

Options:

A.

When performing an SAP S/4HANA conversion with DMO

B.

When performing an SAP S/4HANA conversion without u DMO

C.

When upgrading an SAP S/4HANA Server system

D.

When upgrading an SAP ECC system with DMO

Buy Now
Questions 11

You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.

What does the "Calculated level" indicate for those software components?

Please choose the correct answer.

Response:

Options:

A.

The SAP Support Packages that will be bound to the upgrade

B.

The SAP Support Packages contained in the upgrade media

C.

The SAP Support Packages found in the download directory

D.

The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner

Buy Now
Questions 12

ICNV initialization does 3

Options:

A.

Creation of views

B.

AA

C.

Creation of flag

D.

Build index on flag column

Buy Now
Questions 13

You are performing an S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of dictionary objects (SPDD)?

Please choose the correct answer.

Response:

Options:

A.

Credentials of a named user in client 000 of the shadow system

B.

Credentials of a named user in the development client of the development system

C.

Credentials of user DDIC in client 000 of the shadow system

D.

Credentials of user DDIC in the development client of the development system

Buy Now
Questions 14

During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?

Please choose the correct answer.

Response:

Options:

A.

It performs a comparison on selected tables using check sum.

B.

It performs a comparison on all tables using row counts.

C.

It performs a comparison of all tables using check sum.

D.

It does NOT perform any table comparison.

Buy Now
Questions 15

During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?

Options:

A.

SUM continues with the next phase and your modifications are kept as In the start release

B.

SUM continues with the next phase and your modifications are lost

C.

Before continuing with the next phase SUM asks for a modification adjustment transport

D.

SUM refuses to continue unless you have marked a transport request as modification adjustment transport

Buy Now
Questions 16

In ICNV. How database operations synchronized between the source and the target table?

Options:

A.

Deletes are directly executed in the target table by delete trigger.

B.

AA

Buy Now
Questions 17

During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?

There are 2 correct answers to this question.

Response:

Options:

A.

In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp

B.

In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log

C.

In the job log for the corresponding job in SM37 (Job Overview)

D.

In the corresponding R3trans log files of this phase

Buy Now
Questions 18

You want to execute a Unicode Conversion only. Which approach do you need to follow?

Please choose the correct answer.

Response:

Options:

A.

SWPM using the Backup / Restore procedure

B.

SUM with DMO

C.

SUM without DMO

D.

SWPM using the Load procedure

Buy Now
Questions 19

What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?

Options:

A.

To optimize the migration

B.

To optimize the activation

C.

To optimize the conversion

D.

To optimize the main import

Buy Now
Questions 20

Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.

Options:

A.

Unicode conversion

B.

Custom code analysis

C.

Database migration

D.

Software update

Buy Now
Questions 21

What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?

Please choose the correct answer.

Response:

Options:

A.

An upgrade of the software components is performed, without changing the database type.

B.

A change of the database type is performed, without changing the software components.

C.

An SAP S/4HANA conversion is performed, without adapting the customer data.

D.

A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.

Buy Now
Questions 22

Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?

Options:

A.

Downtime Optimized DMO (DoDMO)

B.

Near-Zero Downtime Maintenance (nZDM)

C.

Near-Zero Downtime Technology (NZDT)

D.

Downtime Optimized Data Conversion (DoC)

Buy Now
Questions 23

You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".

Where can you change this during the migration via the Utilities option of the SUM UI?

There are 2 correct answers to this question

Response:

Options:

A.

In SUM Phaselist

B.

In Process Control Center

C.

In SUM Parameters

D.

In DMO Migration Preparation

Buy Now
Exam Code: E_S4HCON2023
Exam Name: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade
Last Update: May 14, 2024
Questions: 79

PDF + Testing Engine

$66.4  $165.99

Testing Engine

$46  $114.99
buy now E_S4HCON2023 testing engine

PDF (Q&A)

$42  $104.99
buy now E_S4HCON2023 pdf