Spring Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: pass65

FlashArray-Implementation-Specialist Pure Certified FlashArray Implementation Specialist (FAIS) Exam Questions and Answers

Questions 4

What command should be used to check the shelf cable connections?

Options:

A.

purearray list --shelf

B.

purehw list --enclosures

C.

storage_view.py config

Buy Now
Questions 5

An Implementation Engineer completes an installation running 6.x and needs to log back into the array to run final health checks.

After rebooting the controllers, which user account should the Implementation Engineer use to log in?

Options:

A.

pureuser

B.

puresetup

C.

pureeng

D.

root

Buy Now
Questions 6

Once the new Purity firmware has been installed using the pureinstall command, what step is required to commit the new version?

Options:

A.

Reboot the controller

B.

Reboot the array

C.

Log out of the controller

D.

Run pureinstall --commit

Buy Now
Questions 7

An Implementation Engineer is performing a capacity consolidation on an X50R3.

Which command is needed for the engineer to determine whether the customer’s FlashArray supports SAS Flash Modules?

Options:

A.

puredrive list --total --type controller

B.

purehw list --type controller --all

C.

purehw list --type drive --all

Buy Now
Questions 8

On FlashArray models that use standard DFMs instead of DFMDs, which NVRAM bays are always populated?

Options:

A.

NVB0 and NVB3

B.

NVB0 and NVB1

C.

NVB0 and NVB2

Buy Now
Questions 9

How many chassis capacity drive slots come standard on a FlashArray//X Gen 2 chassis?

Options:

A.

28 slots

B.

20 slots

C.

24 slots

D.

40 slots

Buy Now
Questions 10

Upon completion of a hardware upgrade activity, which command should be used to unset the maintenance tag?

Options:

A.

purealert tag --cancel

B.

purealert untag --maintenance

C.

purealert --unset

Buy Now
Questions 11

A customer has a DirectFlash Shelf installed on a FlashArray//X90R4. The 208V rack PDUs are full, but there are five 120V connections available at the top of the rack. What should the Implementation Engineer understand about powering the DirectFlash Shelf in this scenario?

Options:

A.

The Shelf requires at least 180V to operate and Will NOT power on With 120V.

B.

The shelf can be fully supported by 120V for the duration of its service life.

C.

The shelf can operate temporarily on 120V, but 208/240V should be used as soon as it's available.

Buy Now
Questions 12

An Implementation Engineer attempts to add a FlashArray to a Fusion fleet but receives an error indicating the array cannot be added. The array appears healthy and is connected to Pure1.

What is the most likely cause of this issue?

Options:

A.

The array is already assigned to another Fusion fleet.

B.

The array does NOT have any existing workloads configured.

C.

The array is NOT running the latest Purity//FA version.

D.

The array's management interface is physically disconnected.

Buy Now
Questions 13

The Customer’s Implementation Workbook specifies that the SMTP reply is “outlook.microsoft.com:587”. What correction should be made for array initialization to be successful?

Options:

A.

Provide username and password.

B.

Prefix the URL with “https://”.

C.

Remove the port number.

Buy Now
Questions 14

What are the default replication ports on all three rack unit FlashArray models?

Options:

A.

ETH2 and ETH3

B.

ETH4 and ETH5

C.

ETH0 and ETH1

Buy Now
Questions 15

An Implementation Engineer is replacing a failing component in a FlashArray//XR4 and must ensure proper service clearance at the front and rear of the array.

What is the required service depth clearance for the front and rear panels of the FlashArray//XR4?

Options:

A.

Front panel: 216 mm (8.5 in.), Rear panel: 530 mm (20.9 in.)

B.

Front panel: 530 mm (20.9 in.), Rear panel: 530 mm (20.9 in.)

C.

Front panel: 530 mm (20.9 in.), Rear panel: 216 mm (8.5 in.)

D.

Front panel: 216 mm (8.5 in.), Rear panel: 216 mm (8.5 in.)

Buy Now
Questions 16

An Implementation Engineer is installing a FlashArray//XR4 and needs to add an extra card to support a second DirectFlash Shelf. What will be the resulting pair of interfaces?

Options:

A.

ETH4 and ETH5

B.

ETH6 and ETH7

C.

ETH5 and ETH6

Buy Now
Questions 17

How many power connections are required for the FlashArray//XL chassis?

Options:

A.

2

B.

4

C.

6

D.

8

Buy Now
Questions 18

What are the starter configurations of DFMDs in a Gen 2 DirectFlash Shelf?

Options:

A.

8-slot and 14-slot

B.

10-slot and 14-slot

C.

12-slot and 14-slot

Buy Now
Questions 19

Which Pure1 app functionality requires that a user is on their internal company network?

Options:

A.

View array telemetry

B.

Manage support cases

C.

Open Remote Assist

Buy Now
Questions 20

An Implementation Engineer is replacing a failing component in a FlashArray//XR4 and must ensure proper service clearance at the front and rear of the array. What is the required service depth clearance for the front and rear panels Of the FlashArray//XR4?

Options:

A.

Front panel: 216 mm (8.5 in.), Rear panel: 530 mm (20.9 in.)

B.

Front panel: 530 mm (20.9 in.), Rear panel: 216 mm (8.5 in.)

C.

Front panel: 530 mm (20.9 in.), Rear panel: 530 mm (20.9 in.)

Buy Now
Questions 21

A dark site customer requests an evacuation of SH01 on a FlashArray/M50. What is an appropriate next step?

Options:

A.

Use the evac_checks script.

B.

Ensure that usable capacity is less than 80%.

C.

Ensure that usable capacity is less than 90%.

Buy Now
Questions 22

What command should the Implementation Engineer run to view NVRAM install and update status?

Options:

A.

puredrive list

B.

purearray list

C.

purehw list --all

Buy Now
Questions 23

An Implementation Engineer is onsite to replace a 22TB data pack with a new 91TB (10 x 9.1TB) data pack in a FlashArray//X90R5 Gen 2. The array is at 90% capacity. It currently has 22TB (10 x 2.2TB) in slots 0-9 and 63TB (14 x 4.5TB) in slots 10-23, configured as two separate write groups.

What is a supported method to proceed with the planned capacity migration?

Options:

A.

Add the new datapack into slots CH0.BAY24 - CH0.BAY28 and start the EVAC of the drives in slots 0-9. Install the remaining drives after the EVAC completes.

B.

Install a swing shelf, add the new data pack to the swing shelf, and evacuate the old 22TB (10 x 2.2TB) pack.

C.

Evacuate the drives from slots 0-9 into remaining capacity, then install the new data pack into those slots.

D.

Remove the 22TB data pack instantly and rebuild the missing data onto the new 91TB drives from parity.

Buy Now
Questions 24

A customer has purchased a DirectFlash Shelf, but lacks available space in the same rack as the chassis. There is available space in a rack 6m away. What step should be taken prior to implementation?

Options:

A.

Make space in the rack where the chassis is located.

B.

Order 7m DirectFlash Shelf cables.

C.

Relocate the chassis to the rack where there is space for the shelf.

Buy Now
Questions 25

When updating Purity on a new array, which command should the Implementation Engineer run to start the process?

Options:

A.

puresetup

B.

pureinstall

C.

pureboot --install

D.

pureupdate start

Buy Now
Questions 26

An Implementation Engineer is assigned to install a 4X Module 9.1 TB Conversion Kit in a Flash Array Chassis. Why are there only four Direct Flash Modules?

Options:

A.

To widen an existing write group.

B.

To fill out enclosure bays.

C.

To replace a missing shipment.

Buy Now
Questions 27

A data pack has been installed and the puredrive list command shows the drives in “unadmitted” status. Which command should be used to complete the admission?

Options:

A.

puredrive add

B.

puredrive admit

C.

purearray drive admit

Buy Now
Questions 28

When performing a FlashArray//X50R3 to FlashArray//XL130R5 upgrade, what should the Implementation Engineer do with the 20 DirectFlash Modules from the FlashArray//X50R3?

Options:

A.

Insert them into slots 20-39 in the FlashArray//XL130R5 one at a time, allowing parity to reach 100% before inserting the next.

B.

Insert them into slots 0-19 in the FlashArray//XL130R5 one at a time, allowing parity to reach 100% before inserting the next.

C.

Return the drives to Pure Storage after the upgrade script has completed the data migration phase.

D.

Keep the drives installed in the FlashArray//X50R3 and connect it to the FlashArray//XL130R5 as an external DirectFlash Shelf.

Buy Now
Questions 29

An Implementation Engineer is getting ready to install four DFMs into a 16-module efficiency bundle and notices that the new modules are DFMDs while the installed modules are DFMs. What should the Implementation Engineer do to get the array using a 20-module Wide write group?

Options:

A.

Install the four new DFMDs and run puredrive .

B.

Work With the account team to Ship DFMS instead Of the DFMDS.

C.

Install the four new DFMDs, run puredrive admit and have support set the tunable puretune --set ALLOW_DFMD_IN_DFM_WWG 1

Buy Now
Questions 30

Prior to running the puresetup command, which command should an Installation Engineer run on a new install of a FlashArray//XR4 array?

Options:

A.

pureboot list

B.

cobalt check . py

C.

purehw list

Buy Now
Questions 31

After completing planned maintenance, what command should the Implementation Engineer run to verify connectivity to pure services?

Options:

A.

purearray test

B.

purearray --connect

C.

puresupport test

Buy Now
Questions 32

An Implementation Engineer needs to run the puresetup replace procedure on the FlashArray//X during a controller upgrade. Which command should the Implementation Engineer run on the new controller to determine its model?

Options:

A.

hwconfig --all

B.

hwconfig --model

C.

purearray list --controller

Buy Now
Questions 33

An Implementation Engineer is going on site to complete a data pack evacuation and perform a hardware NDU.

At what step should the Implementation Engineer contact support for assistance?

Options:

A.

After removing the fully evacuated drives and before proceeding with the hardware NDU.

B.

When the hardware NDU has been completely finished.

C.

After removing the old drives and inserting any new ones, but before they rebuild.

D.

Before starting the data pack evacuation process.

Buy Now
Questions 34

A customer would like to consolidate their SAS shelves and wants to evacuate multiple shelves in parallel. What is a prerequisite for this procedure?

Options:

A.

Purity must be upgraded to 6.x

B.

The array chassis must be fully populated with modules.

C.

The array usage percentage must be lower than 60%

Buy Now
Questions 35

What command can be used to identify interface status?

Options:

A.

purenetwork list

B.

purenetwork list --all

C.

purenetwork list --eth

Buy Now
Questions 36

An Implementation Engineer is onsite to add a new 91TB (10 x 9.1TB) data pack to a FlashArray that includes a DirectFlash Shelf. The chassis currently contains two write groups, one 45TB (10 x 4.5TB) and one 91TB (10 x 9.1TB). The shelf contains a single 45TB (10 x 4.5TB) write group. The customer requests that the new data pack be added as part of a wide write group. How should the Implementation Engineer meet this request?

Options:

A.

Have support set a tunable to allow the wide write group to extend between the chassis and shelf; then add the drives to the shelf to extend the write group from the chassis.

B.

Add the drives to the shelf and then run puredrive admit --wide-write-group to admit them into the same write group in the shelf.

C.

Move the chassis write group of 45TB (10x4.5TB) to the shelf and then add the new data pack to the chassis.

Buy Now
Questions 37

Which NVRAM bays are always populated on the FlashArray//XR2/3?

Options:

A.

0-1

B.

0-2

C.

0-3

D.

1-2

Buy Now
Questions 38

Which PCIe slot must be used for a SAS HBA on R4B revision controllers?

Options:

A.

PCIe slot 1

B.

PCIe slot 0

C.

PCIe slot 4

D.

PCIe slot 2

Buy Now
Questions 39

A customer has filled out the Installation Workbook. The management IP information netmask is specified as “255.255.255.223” and the gateway is specified as “10.24.18.1”. What corrective action should be taken to reconcile the IP configuration?

Options:

A.

The gateway information should be changed to 10.24.18.223.

B.

The netmask value should be changed to 255.255.255.0.

C.

The netmask value should be changed to /23.

Buy Now
Questions 40

An Implementation Engineer has installed a data pack and the list command shows the drives in "unadmitted" status. Which command should the Implementation Engineer run to complete the admission?

Options:

A.

puredrive

B.

puredrive add

C.

purearray drive admit

Buy Now
Questions 41

A customer has a FlashArray X20R3 with 22/22 data packs in the chassis at 80% space usage and wishes to swap one of the data packs for a 45TB pack. What step needs to be taken to facilitate this consolidation?

Options:

A.

Send a DirectFlash Shelf without any additional capacity.

B.

Send a DirectFlash Shelf with a 63TB of temporary extra capacity.

C.

Reduce array space usage to allow for the evacuation of the 22TB packs.

Buy Now
Questions 42

A customer needs to have arrays installed and configured with ActiveCluster and ETH replication. The installation document contains 3 IP addresses. How many additional IP addresses are needed?

Options:

A.

4

B.

5

C.

6

Buy Now
Questions 43

For a new FlashArray installation, a customer's network team has NOT provisioned network ports for management connectivity.

How will this affect the installation process?

Options:

A.

The array's data will be inaccessible.

B.

Management connectivity is required for installation and the setup will fail.

C.

The customer will be unable to login to the array.

D.

The array will default to using the Fibre Channel ports for management.

Buy Now
Questions 44

Before proceeding with a controller upgrade, phonehome logs must be sent. What command will verify that the logs have been sent?

Options:

A.

purearray phonehome --check

B.

purearray phonehome --list

C.

purearray phonehome --status

Buy Now
Questions 45

An Implementation Engineer completes an installation running 6.x and needs to log back into the array to run final health checks. After rebooting the controllers, which user account should the Implementation Engineer use to log in?

Options:

A.

pureuser

B.

puresetup

C.

pureeng

Buy Now
Questions 46

A customer's management network connectivity is NOT available at the time of array deployment. Which switch should an Implementation Engineer use to avoid those checks during puresetup flow?

Options:

A.

--skip-connectivity-tests

B.

--skip-network-tests

C.

--skip-management-connectivity-tests

Buy Now
Questions 47

Which PCIe slot supports 4-port FC cards on FlashArray//XL?

Options:

A.

2

B.

5

C.

8

Buy Now
Questions 48

After upgrading Purity during a new installation, which command should an Implementation Engineer run to determine what version of Purity will be loaded at the next boot of the FlashArray?

Options:

A.

purearray list --controller

B.

pureversion -a

C.

pureboot list

Buy Now
Questions 49

What is the maximum number of DirectFlash Shelves supported for FlashArray//XL?

Options:

A.

2

B.

3

C.

4

Buy Now
Questions 50

Prior to running the puresetup newarray command, which command should an Implementation Engineer run on a new install of a FlashArray//XR4 array?

Options:

A.

pureboot list

B.

cobalt_check.py

C.

purehw list

D.

hardware_check.py

Buy Now
Questions 51

An Implementation Engineer is setting up a customer environment and has specified a number of NTP servers. Which command should the Implementation Engineer run to list the NTP servers that have been configured?

Options:

A.

puredns list --ntpserver

B.

purenetwork list --ntpserver

C.

purearray list --ntpserver

Buy Now
Questions 52

For FlashArray//XL, which PCIe card slot is reserved for control upgrades?

Options:

A.

5

B.

6

C.

7

Buy Now
Questions 53

After racking a new FlashArray with one data pack, how should DirectFlash modules be installed?

Options:

A.

Starting in bay 10, left to right.

B.

Starting in bay 0, left to right.

C.

Starting in bay 19, right to left.

D.

Starting in bay 4, left to right.

Buy Now
Questions 54

For a new FlashArray installation, a customer's network team has NOT provisioned network ports for management connectivity. How Will this affect the installation process?

Options:

A.

The array's data will be inaccessible.

B.

Management connectivity is required for installation.

C.

The customer Will be unable to login to the array.

Buy Now
Questions 55

How many power connections are required for the FlashArray//XL chassis?

Options:

A.

2

B.

6

C.

4

Buy Now
Questions 56

Which user does an Implementation Engineer use when preparing for the Purity upgrade to complete a HWNDU?

Options:

A.

pureuser

B.

puresetup

C.

pureinstall

D.

root

Buy Now
Questions 57

What is the required PSU wattage for a FlashArray// X70R2/R3 or X90R2/R3 array?

Options:

A.

1200W

B.

1300W

C.

1600W

Buy Now
Questions 58

When adding a data pack into a FlashArray chassis or a DFS shelf, the drives show "unrecognized" status when running List. What is the cause of this status on the newly inserted drives?

Options:

A.

There is a hardware fault that needs to be corrected.

B.

The drives exceed the max space supported for the controller model.

C.

The Purity version of the FlashArray/DFS is incompatible with the new drives.

Buy Now
Questions 59

The customer has completed the installation document and has stated that the proxy server address is “10.24.18.120”. What additional information is required?

Options:

A.

Credentials and port number

B.

Protocol prefix and credentials

C.

Protocol prefix and port number

Buy Now
Questions 60

An Implementation Engineer needs to run the puresetup replace procedure on a FlashArray//XR5 during a controller upgrade. What command should the engineer run to identify the array model?

Options:

A.

hwconfig --all

B.

pureversion -a

C.

hwconfig --model

Buy Now
Questions 61

After running puredb run giveback --safe command once CT0 has been upgraded, how long should the Implementation Engineer wait before continuing with the controller upgrade?

Options:

A.

3 minutes

B.

5 minutes

C.

10 minutes

Buy Now
Questions 62

An Implementation Engineer is installing a FlashArray//XL chassis with two DirectFlash Shelves.

What is the minimum rack space required for this installation?

Options:

A.

9

B.

11

C.

12

D.

15

Buy Now
Questions 63

A client needs to upgrade Purity on their FlashArray, but is unable to wait for an available upgrade date from support.

What action should the customer take?

Options:

A.

Go through the Self-Service upgrade portal on Pure1 Manage and upgrade to the latest Purity version.

B.

Open a ticket with support, download the latest Purity version, copy to a USB flash drive, and run the pureinstall command on each controller.

C.

Log into the Purity CLI, download the latest Purity version, and run the pureinstall command on each controller.

D.

Proceed with the upgrade by executing the purendu procedure start command via the local array GUI.

Buy Now
Questions 64

An Implementation Engineer is performing an inventory for an NDU from a FlashArray//X70R2 to a FlashArray//X70R4 and discovers that a complete FlashArray//X70R4 was shipped instead of an NDU kit. What is the minimum hardware the Implementation Engineer should use from the new array to complete the NDU?

Options:

A.

Controllers

B.

Controllers and power supplies

C.

Controllers and NVRAM

Buy Now
Questions 65

An Implementation Engineer is performing a capacity consolidation on an X50R2 that is 83% full. The starting config is X50R2-20/10-22/0. The end config is X50R2-91/0. What steps should the Implementation Engineer follow to complete the work?

Options:

A.

Evac the chasses drives, install the new 91TB chassis data pack, and evac SH0.

B.

Move the 20TB chassis DP to SH0, install the new 91TB chassis DP, evac the 10TB chassis DP, and evac SH0.

C.

Evac SH0, evac the 20TB chassis DP, install the new 91TB DP, and evac the 10TB chassis DP.

Buy Now
Questions 66

An Implementation Engineer is performing a hardware NDU from a fully populated FlashArray//X90R3 to a FlashArray//XL that already contains 20 DFM-Ds. The drive transfer is complete, and the //XL is still in SPM (Shelf Mode). What is the next step the Implementation Engineer should take to continue the upgrade?

Options:

A.

Hot swap and move each DMM into any open //XL slot.

B.

Evacuate and remove each DMM one-by-one then set aside.

C.

Evacuate DMM's as a datapack then install into any slot in //XL.

Buy Now
Questions 67

During a hardware NDU from a FlashArray//X20R3 to an X20R4-LL (low-line) model, the Implementation Engineer encounters a failure during the power supply check. Voltage readings are correct. What is a likely cause of this failure?

Options:

A.

There are more than 10 drives installed in the chassis.

B.

The power cables are NOT fully seated in the array.

C.

Purity does NOT recognize the power supplies installed in the array.

Buy Now
Questions 68

Which Purity command can be used to validate I/O is balanced across initiators?

Options:

A.

purehost list --balance

B.

purehost iobalance --check

C.

purehost monitor --balance

Buy Now
Questions 69

For FlashArray//XL, which 2 PCIe slots should be used for DFS connectivity?

Options:

A.

0 and 4

B.

0 and 6

C.

1 and 7

Buy Now
Questions 70

Which Purity command can be used to validate I/O is balanced across initiators?

Options:

A.

purehost iobalance check

B.

purehost monitor --balance

C.

purehost list --balance

Buy Now
Exam Name: Pure Certified FlashArray Implementation Specialist (FAIS) Exam
Last Update: Apr 4, 2026
Questions: 234

PDF + Testing Engine

$63.52  $181.49

Testing Engine

$50.57  $144.49
buy now FlashArray-Implementation-Specialist testing engine

PDF (Q&A)

$43.57  $124.49
buy now FlashArray-Implementation-Specialist pdf