An Implementation Engineer completes an installation running 6.x and needs to log back into the array to run final health checks.
After rebooting the controllers, which user account should the Implementation Engineer use to log in?
Once the new Purity firmware has been installed using the pureinstall command, what step is required to commit the new version?
An Implementation Engineer is performing a capacity consolidation on an X50R3.
Which command is needed for the engineer to determine whether the customer’s FlashArray supports SAS Flash Modules?
On FlashArray models that use standard DFMs instead of DFMDs, which NVRAM bays are always populated?
How many chassis capacity drive slots come standard on a FlashArray//X Gen 2 chassis?
Upon completion of a hardware upgrade activity, which command should be used to unset the maintenance tag?
A customer has a DirectFlash Shelf installed on a FlashArray//X90R4. The 208V rack PDUs are full, but there are five 120V connections available at the top of the rack. What should the Implementation Engineer understand about powering the DirectFlash Shelf in this scenario?
An Implementation Engineer attempts to add a FlashArray to a Fusion fleet but receives an error indicating the array cannot be added. The array appears healthy and is connected to Pure1.
What is the most likely cause of this issue?
The Customer’s Implementation Workbook specifies that the SMTP reply is “outlook.microsoft.com:587”. What correction should be made for array initialization to be successful?
What are the default replication ports on all three rack unit FlashArray models?
An Implementation Engineer is replacing a failing component in a FlashArray//XR4 and must ensure proper service clearance at the front and rear of the array.
What is the required service depth clearance for the front and rear panels of the FlashArray//XR4?
An Implementation Engineer is installing a FlashArray//XR4 and needs to add an extra card to support a second DirectFlash Shelf. What will be the resulting pair of interfaces?
Which Pure1 app functionality requires that a user is on their internal company network?
An Implementation Engineer is replacing a failing component in a FlashArray//XR4 and must ensure proper service clearance at the front and rear of the array. What is the required service depth clearance for the front and rear panels Of the FlashArray//XR4?
A dark site customer requests an evacuation of SH01 on a FlashArray/M50. What is an appropriate next step?
What command should the Implementation Engineer run to view NVRAM install and update status?
An Implementation Engineer is onsite to replace a 22TB data pack with a new 91TB (10 x 9.1TB) data pack in a FlashArray//X90R5 Gen 2. The array is at 90% capacity. It currently has 22TB (10 x 2.2TB) in slots 0-9 and 63TB (14 x 4.5TB) in slots 10-23, configured as two separate write groups.
What is a supported method to proceed with the planned capacity migration?
A customer has purchased a DirectFlash Shelf, but lacks available space in the same rack as the chassis. There is available space in a rack 6m away. What step should be taken prior to implementation?
When updating Purity on a new array, which command should the Implementation Engineer run to start the process?
An Implementation Engineer is assigned to install a 4X Module 9.1 TB Conversion Kit in a Flash Array Chassis. Why are there only four Direct Flash Modules?
A data pack has been installed and the puredrive list command shows the drives in “unadmitted” status. Which command should be used to complete the admission?
When performing a FlashArray//X50R3 to FlashArray//XL130R5 upgrade, what should the Implementation Engineer do with the 20 DirectFlash Modules from the FlashArray//X50R3?
An Implementation Engineer is getting ready to install four DFMs into a 16-module efficiency bundle and notices that the new modules are DFMDs while the installed modules are DFMs. What should the Implementation Engineer do to get the array using a 20-module Wide write group?
Prior to running the puresetup command, which command should an Installation Engineer run on a new install of a FlashArray//XR4 array?
After completing planned maintenance, what command should the Implementation Engineer run to verify connectivity to pure services?
An Implementation Engineer needs to run the puresetup replace procedure on the FlashArray//X during a controller upgrade. Which command should the Implementation Engineer run on the new controller to determine its model?
An Implementation Engineer is going on site to complete a data pack evacuation and perform a hardware NDU.
At what step should the Implementation Engineer contact support for assistance?
A customer would like to consolidate their SAS shelves and wants to evacuate multiple shelves in parallel. What is a prerequisite for this procedure?
An Implementation Engineer is onsite to add a new 91TB (10 x 9.1TB) data pack to a FlashArray that includes a DirectFlash Shelf. The chassis currently contains two write groups, one 45TB (10 x 4.5TB) and one 91TB (10 x 9.1TB). The shelf contains a single 45TB (10 x 4.5TB) write group. The customer requests that the new data pack be added as part of a wide write group. How should the Implementation Engineer meet this request?
A customer has filled out the Installation Workbook. The management IP information netmask is specified as “255.255.255.223” and the gateway is specified as “10.24.18.1”. What corrective action should be taken to reconcile the IP configuration?
An Implementation Engineer has installed a data pack and the list command shows the drives in "unadmitted" status. Which command should the Implementation Engineer run to complete the admission?
A customer has a FlashArray X20R3 with 22/22 data packs in the chassis at 80% space usage and wishes to swap one of the data packs for a 45TB pack. What step needs to be taken to facilitate this consolidation?
A customer needs to have arrays installed and configured with ActiveCluster and ETH replication. The installation document contains 3 IP addresses. How many additional IP addresses are needed?
For a new FlashArray installation, a customer's network team has NOT provisioned network ports for management connectivity.
How will this affect the installation process?
Before proceeding with a controller upgrade, phonehome logs must be sent. What command will verify that the logs have been sent?
An Implementation Engineer completes an installation running 6.x and needs to log back into the array to run final health checks. After rebooting the controllers, which user account should the Implementation Engineer use to log in?
A customer's management network connectivity is NOT available at the time of array deployment. Which switch should an Implementation Engineer use to avoid those checks during puresetup flow?
After upgrading Purity during a new installation, which command should an Implementation Engineer run to determine what version of Purity will be loaded at the next boot of the FlashArray?
What is the maximum number of DirectFlash Shelves supported for FlashArray//XL?
Prior to running the puresetup newarray command, which command should an Implementation Engineer run on a new install of a FlashArray//XR4 array?
An Implementation Engineer is setting up a customer environment and has specified a number of NTP servers. Which command should the Implementation Engineer run to list the NTP servers that have been configured?
After racking a new FlashArray with one data pack, how should DirectFlash modules be installed?
For a new FlashArray installation, a customer's network team has NOT provisioned network ports for management connectivity. How Will this affect the installation process?
Which user does an Implementation Engineer use when preparing for the Purity upgrade to complete a HWNDU?
What is the required PSU wattage for a FlashArray// X70R2/R3 or X90R2/R3 array?
When adding a data pack into a FlashArray chassis or a DFS shelf, the drives show "unrecognized" status when running List. What is the cause of this status on the newly inserted drives?
The customer has completed the installation document and has stated that the proxy server address is “10.24.18.120”. What additional information is required?
An Implementation Engineer needs to run the puresetup replace procedure on a FlashArray//XR5 during a controller upgrade. What command should the engineer run to identify the array model?
After running puredb run giveback --safe command once CT0 has been upgraded, how long should the Implementation Engineer wait before continuing with the controller upgrade?
An Implementation Engineer is installing a FlashArray//XL chassis with two DirectFlash Shelves.
What is the minimum rack space required for this installation?
A client needs to upgrade Purity on their FlashArray, but is unable to wait for an available upgrade date from support.
What action should the customer take?
An Implementation Engineer is performing an inventory for an NDU from a FlashArray//X70R2 to a FlashArray//X70R4 and discovers that a complete FlashArray//X70R4 was shipped instead of an NDU kit. What is the minimum hardware the Implementation Engineer should use from the new array to complete the NDU?
An Implementation Engineer is performing a capacity consolidation on an X50R2 that is 83% full. The starting config is X50R2-20/10-22/0. The end config is X50R2-91/0. What steps should the Implementation Engineer follow to complete the work?
An Implementation Engineer is performing a hardware NDU from a fully populated FlashArray//X90R3 to a FlashArray//XL that already contains 20 DFM-Ds. The drive transfer is complete, and the //XL is still in SPM (Shelf Mode). What is the next step the Implementation Engineer should take to continue the upgrade?
During a hardware NDU from a FlashArray//X20R3 to an X20R4-LL (low-line) model, the Implementation Engineer encounters a failure during the power supply check. Voltage readings are correct. What is a likely cause of this failure?
Which Purity command can be used to validate I/O is balanced across initiators?
Which Purity command can be used to validate I/O is balanced across initiators?