Labour Day Sale Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 713PS592

H12-425_V2.0 HCIP-Data Center Facility Deployment V2.0 Questions and Answers

Questions 4

Which of the following are components of NetCol8000-E220? (Choose three.)

Options:

A.

Indirect heat exchange system

B.

Mechanical auxiliary cooling system

C.

Spray system

D.

Electric control system

Buy Now
Questions 5

In operant conditioning, the subject is free to make responses at any time, So conditioning is measured by the rate of responding. In most other Ways, however, their forms of learning are essentially the same.

Options:

A.

When UPSs are connected in parallel, connect loads to the pL terminal.

B.

When a single UPS works and loads are of the same importance, connect all loads to the sL terminal.

C.

When a single UPS works and loads are divided into two levels, connect the primary load to the sL terminal and thesecondary load to the pl_ terminal.

D.

When the UPS is overloaded, the loads connected to the sL terminal will be powered off first to ensure continuous power supply to the loads connected to the pj_ terminal.

Buy Now
Questions 6

Due to simple operations and easy interconnection, which of the following communication types is recommended for NetEco northbound integration?

Options:

A.

WebService

B.

SNMP

C.

FTP

D.

PoE

Buy Now
Questions 7

As the altitude increases, the air density decreases, and the heat exchange capability of the air in a unit volume decreases. In this case, NetCol8000-E220 works with derating.

Options:

A.

True

B.

False

Buy Now
Questions 8

If multiple SmartLi battery cabinets are combined, press and hold the POWER ON/OFF button on each battery management module for more than 2s, and then switch on the battery circuit breaker in any cabinet to start all battery cabinets.

Options:

A.

True

B.

False

Buy Now
Questions 9

When will the bypass module of Huawei integrated UPS to start to work?

Options:

A.

Both the active and standby ECMs are abnormal.

B.

The power module overload times out.

C.

The UPS works in ECO mode, and the bypass voltage is within the preset range.

D.

The UPS is lust powered on and the inverter is not started.

Buy Now
Questions 10

Which of the following statements about ECC800-Pro features are true?

Options:

A.

Supports multiple unlocking method including access card, password, fingerprint, and facial recognition.

B.

Supports the connection of eight access control devices and four cameras for a single smart module.

C.

Supports the cascadingof a maximum of 4 ECC800-Pros.

D.

Supports wizard-based deployment and commissioning.

Buy Now
Questions 11

When the UPS5000-E works in normal mode, in which condition will the UPS automatically transfer to bypass mode?

Options:

A.

Mains outage occurs.

B.

The power module is overloaded for a period longer than the specified time.

C.

Power module overtemperature occurs.

D.

Bypass module hardware is faulty.

Buy Now
Questions 12

Which of the following methods can be used to open the access control for the FusionModule2000 smart module?

Options:

A.

Fingerprint

B.

Card reader

C.

Password

D.

Facial recognition

Buy Now
Questions 13

In the FusionModule2000, the skylight actuator can control the rotating skylight in the aisle containment of the modular data center.

Options:

A.

True

B.

False

Buy Now
Questions 14

A data center is at the Tier IV level and uses Huawei FusionModule2000 smart module. In this smart module, the PDU8000 integrated PDF cannot be used to supply power to IT loads and precision air conditioners at the same time because isolation requirements are not met.

Options:

A.

True

B.

False

Buy Now
Questions 15

When installing a water-cooled module, what is the minimum distance between the module and the wall?

Options:

A.

300 mm

B.

400 mm

C.

500 mm

D.

600 mm

Buy Now
Questions 16

After all historical alarms of the NetCol5000-A are deleted, the deletion operation is not logged.

Options:

A.

True

B.

False

Buy Now
Exam Code: H12-425_V2.0
Exam Name: HCIP-Data Center Facility Deployment V2.0
Last Update: May 9, 2024
Questions: 55

PDF + Testing Engine

$66.4  $165.99

Testing Engine

$46  $114.99
buy now H12-425_V2.0 testing engine

PDF (Q&A)

$42  $104.99
buy now H12-425_V2.0 pdf