At Marks4sure, we are dedicated to providing IT professionals with the most accurate and reliable preparation materials for the Huawei H19-132_V1.0 exam. To support your certification journey, we have made a selection of our premium 2026 HCSP Presales practice questions and answers available completely free. You can take this practice test as many times as you need. Every question includes a detailed, expertly verified explanation to ensure you fully grasp the core security concepts before test day.

Questions 4

Which of the following products are Huawei's modular data-center solutions for indoor scenarios?

Select All that Apply.

Options:

A.

FusionModule500

B.

FusionModule800

C.

FusionModule2000

D.

FusionModule1000

Buy Now
Questions 5

Which of the following UPSs does the FusionModule500 support?

Select All that Apply.

Options:

A.

10kVA

B.

3kVA

C.

6kVA

D.

15kVA

Buy Now
Questions 6

In FusionModule800 5.0, the air conditioner uses electrode humidification for humidifying.

Options:

A.

True

B.

False

Buy Now
Questions 7

Which of the following verification outcomes does not affect BOQ submission?

Options:

A.

Controlled part

B.

EOP part

C.

Configuration error

D.

Alarm configuration [intended: configuration warning]

Buy Now
Questions 8

The standard protection rating of FusionDC1000A is _____.

Options:

A.

IP42

B.

IP65

C.

IP66

D.

IP55

Buy Now
Questions 9

When submitting a BOQ, a prompt stating“Dynamic package instance part number is missing”appears. What should I do next?

Options:

A.

Ignore the prompt and continue to submit the BOQ

B.

Insert a replacement part number manually

C.

Delete the error part number

D.

Apply for package part

Buy Now
Questions 10

In the FusionDC1000A-40ft-IT solution, cold and hot aisles are present between cabinets in the equipment area of the prefabricated module. The sliding door seals an aisle, creating hot-aisle containment.

Options:

A.

True

B.

False

Buy Now
Questions 11

A configuration model can be added from Favorites to any BOQ.

Options:

A.

True

B.

False

Buy Now
Questions 12

In the FusionDC1000A-40ft N+X scenario, the UPS supports two ATS inputs and has a maximum power capacity of 60 kVA (with 2+0 redundancy).

Options:

A.

True

B.

False

Buy Now
Questions 13

Which components are included as standard in the FusionModule800 BC5L configuration?

Select All that Apply.

Options:

A.

Temperature sensor

B.

PAD

C.

Smoke sensor

D.

Smart Door Lock

Buy Now
Questions 14

FusionDC1000A-40ft supports a maximum IT power of 50 kW.

Options:

A.

True

B.

False

Buy Now
Questions 15

FusionDC1000A's anti-seismic rating reaches _____.

Options:

A.

9

B.

10

C.

12

D.

11

Buy Now
Questions 16

Which of the following actions can be performed on a BOQ from theMy Quotationpage?

Select All that Apply.

Options:

A.

Submit

B.

Copy

C.

Share

D.

Split

Buy Now
Questions 17

Which of the following is included among the service configuration types offered by Meta CPQ?

Options:

A.

Maintenance service

B.

Implementation service

C.

Supervision service

D.

All of the above

Buy Now
Questions 18

The configurator is among the marketing tools developed within the basic function of product configuration. It can be understood as a complex vending machine.

Options:

A.

True

B.

False

Buy Now
Questions 19

Regarding the integrated UPS used in FusionModule2000, which of the following statements are correct?

Select All that Apply.

Options:

A.

In FusionModule2000 version 6.0, the integrated UPS supports continuous cooling for air conditioners.

B.

The integrated UPS uses Huawei's self-developed high-density circuit breakers, reducing the size by 25%, thus allowing more power modules to be accommodated.

C.

The integrated UPS combines UPS input, output, air conditioning power distribution, and IT power distribution, saving 1-2 cabinet spaces compared to traditional solutions.

D.

Huawei integrated UPS has a single cabinet power capacity of up to 180 kW.

Buy Now
Questions 20

The air conditioners in the FusionDC1000A-40ft-IT solution use a wet-film humidifier instead of a traditional humidifier, thereby reducing power consumption.

Options:

A.

True

B.

False

Buy Now
Questions 21

The FusionModule800 uses the typical configuration mode, with core components pre-installed at the factory. How long does it take to deploy services on site?

Options:

A.

4 hours

B.

2 days

C.

1 day

Buy Now
Questions 22

Compared with the conventional data-center construction approach, the FusionModule800 occupies a larger area.

Options:

A.

True

B.

False

Buy Now
Questions 23

The FusionDC1000A solution uses a __________ height module.

Options:

A.

5.2m

B.

2.9m

C.

3.6m

D.

4.15m

Buy Now
Questions 24

The installation height requirement for the FusionModule2000 is greater than 2.6 m.

Options:

A.

True

B.

False

Buy Now
Questions 25

Which of the following Sparts can be ordered through the SCT?

Options:

A.

EOS (End of Service & Support) Spart

B.

Prohibited Spart

C.

EOP (End of Production) Spart

D.

Not EOM (End of Marketing) Spart

Buy Now
Questions 26

Which of the following systems should be included in a complete data center?

Select All that Apply.

Options:

A.

Monitoring system

B.

Power system

C.

Cooling system

Buy Now
Questions 27

When using the SCT configurator for the first time, first apply for an account and the required permission.

Options:

A.

True

B.

False

Buy Now
Questions 28

Which of the following UPSs does the FusionModule800 support?

Select All that Apply.

Options:

A.

3kVA

B.

20kVA

C.

6kVA

D.

10kVA

Buy Now
Questions 29

According to the training materials, which safety-management phase is described by the following statement? Statement: Proactively correct other people’s violations, and demonstrate concern for others’ safety, team honor, and safety beyond work.

Options:

A.

Supervision and management

B.

Team management

C.

By instinct

D.

Self-management

Buy Now
Questions 30

Which of the following BOQ types may be used to place orders for demo products in SCT?

Options:

A.

Demo BOQ

B.

Promotional BOQ

C.

Normal BOQ

Buy Now
Questions 31

In-row air-cooled cooling is utilized in the FusionDC1000A-40ft-IT solution.

Options:

A.

True

B.

False

Buy Now
Exam Code: H19-132_V1.0
Exam Name: HCSA-Presales-Data Center Facility (Modular DC) V1.0
Last Update: Nov 11, 2026
Questions: 106

PDF + Testing Engine

$55.71   $185.69

Testing Engine

$42.85   $142.83

PDF (Q&A)

$47.13   $157.11