H20-923_V1.0 HCSP-Field-Data Center Facility V1.0 Questions and Answers

Questions 4

After installing the FusionCol8000-C (110–440 kW), inject water to preserve the pressure for the chilled water pipes to how many MPa. After 30 minutes, check that no leakage occurs. Preserve the pressure for 24 hours. If the pressure drop is less than 0.01 MPa and no leakage occurs, the pipes do not leak.

Options:

A.

0.8

B.

0.5

C.

1

D.

1.2

Buy Now
Questions 5

If the SPD indicator of a smart module is green, the SPD is running properly. If the SPD indicator is red, the SPD is faulty and must be replaced immediately.

Options:

A.

True

B.

False

Buy Now
Questions 6

During wizard startup, when you enter the screen for selecting commissioning items for the first time, all items are selected by default. Which item is mandatory. You can deselect other commissioning items that are not mandatory.

Options:

A.

Commissioning the indoor fans

B.

Commissioning the condensate pump

C.

Commissioning the humidifier

D.

Commissioning the cooling system

Buy Now
Questions 7

What is the upstream input voltage range of the UPS5000-H?

Options:

A.

360 V–600 V

B.

220 V–240 V

C.

380 V–415 V

D.

138 V–485 V

Buy Now
Questions 8

The frequency of power supply equipment can be 50 Hz, 60 Hz, or 70 Hz.

Options:

A.

True

B.

False

Buy Now
Questions 9

The FusionCol8000-A230 unit uses two systems. Each system uses three compressors connected in parallel and two EEVs.

Options:

A.

True

B.

False

Buy Now
Questions 10

Which of the following statements are true about the industry trend of the data center cooling systems?

Options:

A.

Liquid cooling systems are widely used in high-density solutions.

B.

Cloud + AI – data centers enter a new energy-saving era.

C.

Evaporative cooling systems become the main solution for large data centers.

D.

Higher inlet and outlet water temperatures are the trend of large data center cooling.

Buy Now
Questions 11

Which of the following models is a Huawei in-room chilled water horizontal air supply product?

Options:

A.

NetCol5000-A070U

B.

FusionCol8000-C210H

C.

FusionCol5000-A050H

D.

NetCol8000-C070D

Buy Now
Questions 12

After replacing the fan, choose "Menu > _____ > Performance Maintenance" on the main screen to enter the "Performance Maintenance" screen and clear the accumulated runtime of the indoor fan.

Options:

A.

Alarms

B.

Settings

C.

Running

D.

Maint

Buy Now
Questions 13

The maintenance bypass switch cannot be turned on when the UPS5000-H works in normal mode.

Options:

A.

True

B.

False

Buy Now
Questions 14

The rated output capability of a single power module for the UPS5000-H is how many kVA.

Options:

A.

50

B.

100

C.

30

D.

60

Buy Now
Questions 15

The NetEco can be deployed on any virtualization platform.

Options:

A.

True

B.

False

Buy Now
Questions 16

Which of the following statements are true about the routine maintenance of a UPS?

Options:

A.

Environment check: Check whether the temperature and humidity of the equipment room meet the recommended environment requirements. Check whether the equipment room is clean and tidy.

B.

UPS status check: Check whether the UPS works in normal mode, whether an alarm is generated, and whether the UPS is in a proper load.

C.

Routine maintenance of vulnerable components: Periodically check the UPS fan operation, whether there is noise, and whether the rotation speed is abnormal.

D.

If there is no alarm on the UPS panel, do not need to check the installation environment, temperature, and humidity onsite.

Buy Now
Questions 17

The UPS5000-H-1200 kVA and UPS5000-H-1600 kVA have two power cabinets and one bypass cabinet, and are equipped with the MDU, ECU, and surge protection box.

Options:

A.

True

B.

False

Buy Now
Questions 18

Which of the following conditions will not cause the wizard startup commissioning to fail?

Options:

A.

The condensate pump is stuck.

B.

The indoor fan 2 drive is faulty.

C.

The electronic expansion valve is not opened.

D.

The water leakage rope is not installed.

Buy Now
Exam Code: H20-923_V1.0
Exam Name: HCSP-Field-Data Center Facility V1.0
Last Update: Feb 14, 2026
Questions: 60

PDF + Testing Engine

$63.52  $181.49

Testing Engine

$50.57  $144.49
buy now H20-923_V1.0 testing engine

PDF (Q&A)

$43.57  $124.49
buy now H20-923_V1.0 pdf