Summer Sale - Special Discounts Limited Time 55% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 63r59951

H35-560 HCIA-LTE-RNP&RNO V1.0 Questions and Answers

Questions 4

Which of the following access preamble formats supports the largest cell radius?

Options:

A.

Format0

B.

Format2

C.

Format3

D.

Format4

Buy Now
Questions 5

The drive test scenario judges the success of the handover, usually based on the signaling. On the terminal side, which of the following signaling starts the handover process?

Options:

A.

Measurement Control

B.

Measurement Report

C.

Handover Request

D.

Handover Command

Buy Now
Questions 6

Before the cluster optimization test, the target area must be divided into clusters. Which of the following statements are correct? (Multiple choice)

Options:

A.

The cluster division should span different areas of the test (planning) full coverage business

B.

Make full use of the terrain (mountains and rivers)

C.

Refer to the existing cluster division for network engineering maintenance

D.

When dividing the cluster, the drive test in each cluster can be completed in one day, usually about 6 hours for one drive test

Buy Now
Questions 7

The single-station verification test only needs to verify whether the cell status in the idle mode is normal.

Options:

A.

True

B.

False

Buy Now
Questions 8

Assuming other conditions are unchanged, if the power parameter PB is changed from 0 to 1, then which of the following statements is correct?

Options:

A.

Cell reference signal power is increased by 3dcorrect

B.

Cell reference signal power is increased by 1dB

C.

Cell reference signal power is reduced by 3dB

D.

Cell reference signal power is reduced by 1dB

Buy Now
Questions 9

The current frequency spectrum of China Mobile's F-band is 1880MHz to 1900MHz.

Options:

A.

True

B.

False

Buy Now
Questions 10

When doing PCI planning, what principles need to be met? (multiple choice)

Options:

A.

Avoid cells with overlapping coverage areaspcimold3same

B.

Of all the districtsPCIAll different

C.

Cells that meet the reuse degreePCICan be the same

D.

Need for cells with overlapping coverage areasPCImold3same

Buy Now
Questions 11

In large, medium and small cities, many streets have tall buildings on both sides. To avoid time dispersion, the cell antenna azimuth of nearby base station cannot be installed on the street.

Options:

A.

True

B.

False

Buy Now
Questions 12

In single-site verification, within the visible target coverage area of ​​the base station, which of the following principles should be met for the RSRP compliance rate of the test road?

Options:

A.

The probability that F band meets RSRP> -HOdBm and RS-SINR> -3dB is greater than 98%; D band is greater than 90%

B.

The probability that F band meets RSRP> -105dBm and RS-SINR> -3dB is greater than 98%; D band is greater than 90%

C.

The probability that F band meets RSRP> -lOOdBm and RS-SINR> -3dB is greater than 98%; D band is greater than 90%

D.

The probability that F band meets RSRP> -95dBm and RS-SINR >・3dB is greater than 98%; D band is greater than 90%

Buy Now
Exam Code: H35-560
Exam Name: HCIA-LTE-RNP&RNO V1.0
Last Update: Apr 22, 2024
Questions: 84

PDF + Testing Engine

$74.7  $165.99

Testing Engine

$51.75  $114.99
buy now H35-560 testing engine

PDF (Q&A)

$47.25  $104.99
buy now H35-560 pdf