Spring Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: pass65

H35-911 HCS - Microwave Hardware Installation (written) Questions and Answers

Questions 4

In general, optical fiber transmission delivers lower capacity than microwave transmission.

Options:

A.

True

B.

False

Buy Now
Questions 5

On-tower preparations mainly include selecting the azimuth angle and height for pole mounting based on the engineer experience .

Options:

A.

True

B.

False

Buy Now
Questions 6

After an antenna was hoisted to the tower, the lifting rope can be left it on the tower.

Options:

A.

True

B.

False

Buy Now
Questions 7

Site environmental risks need to be assessed by all personnel on the day of visiting the site, or be assessed on the next day.

Options:

A.

True

B.

False

Buy Now
Questions 8

Which of the following statements about precautions for optical fiber installation are correct?

Options:

A.

Do not bend fibers in the cabinet.

B.

Do not look into optical ports without eye protection.

C.

When routing fibers, take proper measures to avoid any damage to fiber connectors.

D.

Bend fibers in the cabinet to keep the fibers in older.

Buy Now
Questions 9

What are the types installation of direct Mounting Mode Single-Polarized Antenna?

Options:

A.

Separate mounting

B.

Direct mounting

C.

Triple mounting

Buy Now
Questions 10

After an antenna was hoisted to the tower, the lifting rope can be lefle antenna.

Options:

A.

True

B.

False

Buy Now
Questions 11

Which of the following are requirements of operations in dangerous areas?

Options:

A.

Formulate emergency measures and first aid measures for working in dangerous areas.

B.

Place an warning sign and Isolation barrier.

C.

Take protective measures for construction personnel in dangerous areas. Use professional tools for safe operations.

Buy Now
Questions 12

Before power on the microwave equipment at the first time after installation, use a galvanometer to check whether circuit breaker voltage is within the operating voltage range of the device.

Options:

A.

True

B.

False

Buy Now
Questions 13

Multimeter can be used to check whether the antenna aligning are correct or not in the process.

Options:

A.

True

B.

False

Buy Now
Questions 14

What is the height of RTN 950 IDU? (lU=44.45mm)

Options:

A.

1U

B.

2U

C.

4U

D.

3U

Buy Now
Questions 15

A certain amount of rainfall introduces space loss of a distance unit. What is the difference between space loss on a 7 GHz microwave link and that on a 15 GHz microwave link?

Options:

A.

The 7 GHz microwave link attenuation is the same as the space loss with 15 GHz microwave link.

B.

The 7 GHz attenuation Is smaller than the space loss with 15 GHz microwave link.

C.

The 7 GHz microwave link attenuation is larger than the space loss with 15 GHz microwave link.

Buy Now
Questions 16

Cables are distinguished by color. What is the color for an indoor PGND cable?

Options:

A.

Blue

B.

Yellow and green

C.

White

D.

Red

Buy Now
Questions 17

During PI installation, ensure that the service ports of the PI face downward before you fix the PI.

Options:

A.

True

B.

False

Buy Now
Questions 18

Which of the following is correct In operations on powered-on equipment and circuits?

Options:

A.

Operations on powered-on equipment and circuits can be performed only by qualified personnel.

B.

Anyone who wears insulation clothing can perform operations on powered-on equipment and circuits.

C.

Heavy current and weak current-related operations can be performed by non qualified personnel.

Buy Now
Exam Code: H35-911
Exam Name: HCS - Microwave Hardware Installation (written)
Last Update: Apr 30, 2026
Questions: 60

PDF + Testing Engine

$63.52  $181.49

Testing Engine

$50.57  $144.49
buy now H35-911 testing engine

PDF (Q&A)

$43.57  $124.49
buy now H35-911 pdf