Labour Day Sale Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 713PS592

HPE0-S59 HPE Compute Solutions Questions and Answers

Questions 4

You need to setup HPE Synergy frames after hardware components are discovered within HPE OneView.

Put the steps to achieve this goal into the coned order in the answer area on the right.

HPE0-S59 Question 4

Options:

Buy Now
Questions 5

Your customer has me following HPE Synergy setup

- Three frames fully populated with HPE Synergy 480 Gen10 Plus modules and 25Gb/s downlink speed formulating a single logical enclosure

- Two HPE Virtual Connect SE 100Gb F32 Module for Synergy

- Four HPE Synergy 50Gb interconnect Link Module

- Six HPE Synergy Virtual Connect SE 32Gb FC Modules

The customer needs to add a frame.

Which statement about the expansion of this setup is true?

Options:

A.

The additional frame must have HPE Virtual Connect FC modules installed

B.

The customer can grow the existing logical enclosure up to 5 frames

C.

The customer has to create a new logical enclosure for the additional frame

D.

The additional frame cannot have 12Gb SAS connection modules installed

Buy Now
Questions 6

Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They plan to use Distributed Switches and DRS cluster

You are preparing a proposal with the following components:

- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules

- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy

- an appropriate number of the vSphere Standard licenses for each compute node

- one HPE D3940 Storage Modules with 40 SSDs - all required cables and options

Which statement about this proposal is true?

Options:

A.

One HPE Virtual Connect SE 100Gb F32 Module for Synergy should be replaced with 50GD/S ILM

B.

vSphere Standard licenses should be replaced with Enterprise Pius licenses to enable requested features

C.

2 additional HPE Synergy 480 Gen10 Plus compute modules can be added to this setup

D.

20 SSD drives should be removed from this setup, as D3940 supports only 20 SSD or SAS drive.

Buy Now
Questions 7

Refer to the exhibit.

HPE0-S59 Question 7

Which statement about this logical interconnect group is true?

Options:

A.

The master modules are located in the interconnect bays 2 and 5

B.

For the given downlink speed, the maximum number of frames is reached

C.

Both master modules are located in the same HPE S ynergy frame

D.

To use interconnect bay set 3, all compute nodes must be half-height

Buy Now
Questions 8

You configured a vVoI datastore using HPE Storage integration Pack for VMware vCenter.

Which storage object should you check using SSMC to verify whether vVol datastore is configured property?

Options:

A.

App Volume Set

B.

Storage Container

C.

Virtual Volume Set

D.

virtual Volume

Buy Now
Questions 9

You are troubleshooting an HPE OneView server profile that presents a critical state. The server profile was configured with a Link Aggregation Group

What should you check to fix the issue?

Options:

A.

if both FiexNICs are configured with the same speed

B.

If the logical enclosure is built on at least three HPE Synergy frames

C.

if both FiexNICs are connected to different networks

D.

if the logical enclosure is configured with redundant master modules

Buy Now
Exam Code: HPE0-S59
Exam Name: HPE Compute Solutions
Last Update: May 5, 2024
Questions: 60

PDF + Testing Engine

$66.4  $165.99

Testing Engine

$46  $114.99
buy now HPE0-S59 testing engine

PDF (Q&A)

$42  $104.99
buy now HPE0-S59 pdf