Spring Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: pass65

InsuranceSuite-Analyst Associate Certification - InsuranceSuite Analyst - Mammoth Proctored Exam Questions and Answers

Questions 4

Identify which of the following are phases in the Guidewire Project Lifecycle:

Options:

A.

Maintenance

B.

Delivery

C.

Inception

D.

Deployment

E.

Initiation

F.

Development

Buy Now
Questions 5

A project team is considering rebuilding a complex claims calculation feature from their legacy system within the new Guidewire Cloud implementation, rather than leveraging the base InsuranceSuite functionality. Based on maximizing value principles, which two potential impacts are most likely to arise from this approach? (Choose two)

Options:

A.

Improved system performance compared to base configuration

B.

Challenges with future Guidewire platform updates

C.

Reduced implementation effort and cost

D.

Increased maintenance responsibilities

E.

Increased ease of future Guidewire updates

Buy Now
Questions 6

Which of the following statements describe the importance of acceptance criteria in a software implementation project? (Select three)

Options:

A.

They describe desired system functionality when “done” from the business perspective

B.

They describe how to correctly configure and code requirements

C.

They facilitate the writing of automated test scenarios with BDD

D.

They are acceptance tests

E.

They are used to confirm whether the user story can be accepted

Buy Now
Questions 7

A project team is elaborating requirements for a new policy administration process. During a requirements workshop, a senior stakeholder insists on replicating a complex data entry screen from their legacy system, which requires multiple redundant fields and deviates significantly from the standard Guidewire user interface flow. This approach is preferred by the stakeholder because it is familiar to existing agents.

Based on Guidewire principles and strategies for maximizing InsuranceSuite value, which two actions should the Business Analyst prioritize during requirements elaboration to address this request?

Options:

A.

Document the requested screen layout and workflow precisely as described to ensure stakeholder satisfaction.

B.

Create detailed screen mockups of the requested legacy design for documentation purposes, prior to completing any analysis.

C.

Review the standard Guidewire process flows and user interface for the relevant business activity to understand the out-of-the-box capabilities.

D.

Engage a developer to build a prototype of the legacy screen layout for stakeholder review.

E.

Focus on the underlying business need and challenge whether the legacy design is necessary, using Guidewire-standard approaches where possible.

Buy Now
Questions 8

A Quality Analyst is reviewing how a standard Guidewire InsuranceSuite application has been adapted for a specific insurer. Which approaches represent key ways in which the application's behavior and appearance can be tailored without writing extensive custom code?

Choose 2 options.

Options:

A.

Adjusting system parameters and options through administrative tools.

B.

Developing custom integration components using Java.

C.

Configuring user roles and permissions to control access and functionality.

D.

Modifying the database triggers and stored procedures.

E.

Utilizing the built-in business rules engine to define conditional logic.

F.

Replacing the standard user interface framework with a custom-built UI.

Buy Now
Questions 9

Which of the following roles are typically found in the core project implementation team? choose two

Options:

A.

Product Owner

B.

Designer

C.

Quality Analyst

D.

Project Manager

E.

Subject Matter Expert

Buy Now
Questions 10

Gosu rules are:

Options:

A.

Managed in Business Rules UI screens

B.

Created and maintained by developers

C.

Capable of handling complex logic

D.

Configured by Analysts after they are documented in the User Story Cards

Buy Now
Questions 11

Why is it important for non-developers to have a basic understanding of the data model?

Options:

A.

It is necessary for analysts writing configuration scripts

B.

It helps them determine whether a field exists in the out-of-the-box product

C.

It helps them know the underlying data when documenting change requests

D.

It helps them complete product configuration

Buy Now
Questions 12

A Guidewire Cloud project team is looking for ways to accelerate their implementation by leveraging existing, standardized assets for common integrations or specific lines of business.

Which TWO types of pre-built content available through official Guidewire channels are designed to provide these ready-to-use starting points?

Options:

A.

Project Risk Register Template

B.

Ready for Guidewire Accelerators

C.

Xmind Mind Map

D.

User Story Card Template

E.

Guidewire Go products

Buy Now
Questions 13

Identify which of the following are phases in the Guidewire Project Lifecycle:

Options:

A.

Pre-Inception

B.

Sprint 1

C.

Inception

D.

Development

E.

Testing

F.

Maintenance

Buy Now
Questions 14

The goal of an elaboration workshop is to identify value-driven changes to the OOTB User Story that supports business processes. Who are the key stakeholders in this process?

Options:

A.

Business Analyst

B.

Scrum Master

C.

Development resources

D.

Subject Matter Expert

Buy Now
Questions 15

A project team for a new inland marine policy system needs to integrate their Guidewire application with a third-party document production vendor. They are evaluating the benefits of using a pre-built integration accelerator available on Guidewire Marketplace.

Beyond simply enabling the connection, which key advantages do these pre-built integration solutions offer to significantly reduce implementation effort and total cost of ownership?

Choose 2 options.

Options:

A.

The extension pack eliminates the need for in-house integration expertise.

B.

They require extensive custom coding for specific vendor APIs.

C.

They necessitate manual data mapping documentation for every new Cloud release.

D.

Partial solutions that provide a starting point for meeting the particular needs of the project.

E.

Promote faster implementation due to being pre-configured to meet a specific need.

Buy Now
Questions 16

A Business Analyst at PinnacleSure is preparing for an upcoming sprint. They are reviewing User Story Cards to ensure they accurately reflect the refined requirements.

User Story Cards are refined throughout a Guidewire project to capture changing business requirements and to specify what will be (or has been) __________________ for the project.

Options:

A.

externally validated

B.

implemented by developers

C.

configured in the application

D.

a testing strategy

E.

financially approved

F.

the project plan

Buy Now
Questions 17

An insurer is developing a new Commercial Property line of business and aims to leverage as much pre-built content as possible to accelerate the implementation. Which of the following are specifically designed to provide ready-to-use policy products or a standardized process and application for developing a policy product?

Options:

A.

Guidewire Studio files, for direct configuration changes

B.

Guidewire GO products, which are approved collections of pre-built product model content

C.

Legacy System Adapters, designed for migrating historical data

D.

User Story Handbooks, which provide best practices for documenting requirements

E.

Product Adoption Resources, which offer guidance on implementing features

F.

Advanced Product Designer (APD)

Buy Now
Questions 18

A Business Analyst working on a Guidewire Workers' Compensation implementation needs to understand the existing data structure to support a new reporting requirement.

A Business Analyst utilizes the Data Dictionary to __________________ and to __________________ for potential configuration changes.

Options:

A.

analyze business workflows, document integration points

B.

track project progress, monitor system performance

C.

understand data relationships, identify required data elements

D.

explore entity structure, determine valid data values

E.

view application logic, generate system reports

F.

modify UI components, manage typelist permissions

Buy Now
Questions 19

An insurance company’s project team is transitioning from Inception to Sprint Zero for their Commercial Property product implementation. A critical step is the organization of confirmed user story cards for development. At the conclusion of the Inception phase, the process for building out user story cards is guided by __________________ and ensures alignment with strategic business objectives.

Options:

A.

Key decision log

B.

Requirements elaboration

C.

Project communication matrix

D.

Comprehensive test suite

E.

Change management strategy

F.

Conceptual sprint plan

Buy Now
Questions 20

Please select Elaboration session best practice(s):

Options:

A.

Don’t allow multiple conversations to go on at the same time

B.

Don’t suggest that something is out of scope

C.

Revisit decisions made in prior sessions

D.

Focus on the client’s current workflow in order to write requirements that define their current system

Buy Now
Questions 21

What features have been added to InsuranceSuite to make it more accessible to disabled users that Business Analysts should consider when making changes to the User Interface? (Choose two)

Options:

A.

Braille keyboard support for the visually impaired

B.

New screen settings for user interface magnification and color contrast

C.

User interface support with closed captions for the hearing impaired

D.

Screen reader support with Alt text and WAI-ARIA attributes

Buy Now
Questions 22

For Guidewire Cloud implementations, in which phases or activities does the Quality Analyst team play a critical role in ensuring project quality?

Choose 2 options.

Options:

A.

During the Stabilization phase, to conduct end-to-end testing, performance testing, and support User Acceptance Testing (UAT)

B.

Exclusively during the Launch phase, to provide direct end-user support for the deployed application

C.

Defining the overall project governance structure and roles (Shared Responsibility Model)

D.

Participating in Story Huddles with analysts and developers to understand the requirements

E.

During the Inception phase, to develop the detailed configuration for all required user interface screens

F.

During the Deployment phase, to verify project adherence to Guidewire Cloud Standards

Buy Now
Questions 23

A typelist is:

Options:

A.

A set of references to another entity

B.

A set of values used as the source of drop-down lists

C.

A set of fields or attributes related to an object

D.

Associated with a typekey field

Buy Now
Questions 24

Please select User Story Card best practices from the list below. (Choose two)

Options:

A.

Include field requirements in the UI Mock-up tab

B.

Change a requirement number after the story card has been published

C.

Include a requirement number for traceability

D.

Review every requirement with the team

Buy Now
Questions 25

A Business Analyst on a Commercial Property insurance implementation is analyzing a complex underwriting workflow screen. To quickly pinpoint the screen's architectural location, including its underlying Page Configuration Format (PCF) files, which keyboard shortcut is designed to provide this specific information?

Options:

A.

ALT + CTRL + W

B.

ALT + CTRL + I

C.

ALT + CTRL + T

D.

ALT + SHIFT + W

E.

ALT + SHIFT + I

F.

ALT + SHIFT + T

Buy Now
Questions 26

A commercial general liability insurer is initiating a new Guidewire implementation.

What are the primary advantages of leveraging Guidewire's standard user story cards during the initial phases of this project?

Choose 2 options.

Options:

A.

Accelerating the requirements gathering process and expediting user story reviews

B.

Automating all data migration activities effectively

C.

Reducing overall development effort by maximizing functional alignment

D.

Finalizing detailed design specifications for integrations

E.

Providing definitive, unchangeable project estimates from day one

F.

Eliminating the need for custom configuration during the development sprint 0

Buy Now
Questions 27

_____ is a high-level sprint plan that is delivered at the end of Inception. It is used to provide guidance on which stories are prioritized based on value or risk.

Options:

A.

Prioritized Sprint Plan

B.

Pre-Inception Sprint Plan

C.

Conceptual Sprint Plan

D.

Development Sprint Plan

E.

Risk-based Sprint Plan

Buy Now
Questions 28

A project team is tasked with implementing several common integration patterns for their new Guidewire Cloud application. They want to maximize efficiency and leverage existing Guidewire resources to provide a strong starting point for development efforts. Which resources should the team prioritize utilizing as pre-built starting points for these solutions?

Options:

A.

Application logic configuration files

B.

RACI matrices for roles and responsibilities

C.

Guidewire Cloud Standards for compliance

D.

User Story Cards for requirements elaboration

E.

Accelerators

Buy Now
Exam Name: Associate Certification - InsuranceSuite Analyst - Mammoth Proctored Exam
Last Update: May 12, 2026
Questions: 96

PDF + Testing Engine

$63.52  $181.49

Testing Engine

$50.57  $144.49
buy now InsuranceSuite-Analyst testing engine

PDF (Q&A)

$43.57  $124.49
buy now InsuranceSuite-Analyst pdf