A project team is considering rebuilding a complex claims calculation feature from their legacy system within the new Guidewire Cloud implementation, rather than leveraging the base InsuranceSuite functionality. Based on maximizing value principles, which two potential impacts are most likely to arise from this approach? (Choose two)
Which of the following statements describe the importance of acceptance criteria in a software implementation project? (Select three)
A project team is elaborating requirements for a new policy administration process. During a requirements workshop, a senior stakeholder insists on replicating a complex data entry screen from their legacy system, which requires multiple redundant fields and deviates significantly from the standard Guidewire user interface flow. This approach is preferred by the stakeholder because it is familiar to existing agents.
Based on Guidewire principles and strategies for maximizing InsuranceSuite value, which two actions should the Business Analyst prioritize during requirements elaboration to address this request?
A Quality Analyst is reviewing how a standard Guidewire InsuranceSuite application has been adapted for a specific insurer. Which approaches represent key ways in which the application's behavior and appearance can be tailored without writing extensive custom code?
Choose 2 options.
Which of the following roles are typically found in the core project implementation team? choose two
Why is it important for non-developers to have a basic understanding of the data model?
A Guidewire Cloud project team is looking for ways to accelerate their implementation by leveraging existing, standardized assets for common integrations or specific lines of business.
Which TWO types of pre-built content available through official Guidewire channels are designed to provide these ready-to-use starting points?
The goal of an elaboration workshop is to identify value-driven changes to the OOTB User Story that supports business processes. Who are the key stakeholders in this process?
A project team for a new inland marine policy system needs to integrate their Guidewire application with a third-party document production vendor. They are evaluating the benefits of using a pre-built integration accelerator available on Guidewire Marketplace.
Beyond simply enabling the connection, which key advantages do these pre-built integration solutions offer to significantly reduce implementation effort and total cost of ownership?
Choose 2 options.
A Business Analyst at PinnacleSure is preparing for an upcoming sprint. They are reviewing User Story Cards to ensure they accurately reflect the refined requirements.
User Story Cards are refined throughout a Guidewire project to capture changing business requirements and to specify what will be (or has been) __________________ for the project.
An insurer is developing a new Commercial Property line of business and aims to leverage as much pre-built content as possible to accelerate the implementation. Which of the following are specifically designed to provide ready-to-use policy products or a standardized process and application for developing a policy product?
A Business Analyst working on a Guidewire Workers' Compensation implementation needs to understand the existing data structure to support a new reporting requirement.
A Business Analyst utilizes the Data Dictionary to __________________ and to __________________ for potential configuration changes.
An insurance company’s project team is transitioning from Inception to Sprint Zero for their Commercial Property product implementation. A critical step is the organization of confirmed user story cards for development. At the conclusion of the Inception phase, the process for building out user story cards is guided by __________________ and ensures alignment with strategic business objectives.
What features have been added to InsuranceSuite to make it more accessible to disabled users that Business Analysts should consider when making changes to the User Interface? (Choose two)
For Guidewire Cloud implementations, in which phases or activities does the Quality Analyst team play a critical role in ensuring project quality?
Choose 2 options.
A Business Analyst on a Commercial Property insurance implementation is analyzing a complex underwriting workflow screen. To quickly pinpoint the screen's architectural location, including its underlying Page Configuration Format (PCF) files, which keyboard shortcut is designed to provide this specific information?
A commercial general liability insurer is initiating a new Guidewire implementation.
What are the primary advantages of leveraging Guidewire's standard user story cards during the initial phases of this project?
Choose 2 options.
_____ is a high-level sprint plan that is delivered at the end of Inception. It is used to provide guidance on which stories are prioritized based on value or risk.
A project team is tasked with implementing several common integration patterns for their new Guidewire Cloud application. They want to maximize efficiency and leverage existing Guidewire resources to provide a strong starting point for development efforts. Which resources should the team prioritize utilizing as pre-built starting points for these solutions?