Spring Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: pass65

LEED-AP-ID+C LEED AP Interior Design + Construction (LEED AP ID+C) V4 Questions and Answers

Questions 4

A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of the project's gross floor will be

completed by the time of occupancy. LEED certification is being sought. Which rating system would be the most

appropriate one to use?

Options:

A.

LEED Interior Design and Construction

B.

LEED Building Design and Construction

C.

LEED for Homes

D.

No rating system

Buy Now
Questions 5

A tenant moving into an existing building will need to install new HVAC, power, lighting systems and other equipment.

Which of the following resources would help the tenant meet the requirements of Energy and Atmosphere Credit, Optimize Energy Performance?

Options:

A.

Green Seal Standard 11

B.

ANSI/ASHRAE Standard 62.1-2010

C.

ANSI/ASHRAE/IESNA Standard 90.1-2010

D.

South Coast Air Quality Management District (SCAQMD)

Buy Now
Questions 6

A luxury hotel project is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies. Which of the following credits would be applicable?

Options:

A.

Regional Priority Credit, Optimize Energy Performance

B.

Indoor Environmental Quality Credit, Quality Views, Exemplary Performance

C.

Indoor Environmental Quality Credit, Acoustic Performance, Exemplary Performance

D.

Energy and Atmosphere Credit, Enhanced Commissioning, Exemplary Performance

Buy Now
Questions 7

Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.

Commercial dishwashers and coffee makers

B.

Residential clothes washers and dishwashers

C.

Residential dishwashers and drinking fountains

D.

Commercial clothes washers and coffee makers

Buy Now
Questions 8

According to the Integrative Process Credit, Integrative Process the discovery phase of site selection for an existing

building should identify

Options:

A.

lighting levels

B.

operational schedules

C.

transportation options

D.

thermal comfort ranges

Buy Now
Questions 9

A renovation project includes both a new kitchen sink and shower and an existing lavatory and water closet within the LEED project boundary. How would the project perform the Water Efficiency Credit, Indoor Water Use Reduction calculations?

Options:

A.

Include only the newly installed fixtures and exclude the existing fixtures

B.

Include only the existing fixtures and exclude the newly installed fixtures

C.

Include all fixtures (new and existing); the baseline for the existing fixtures would be the flush/flow rates of the existing fixtures prior to retrofit

D.

Include all fixtures (new and existing); the baseline for the existing fixtures would be the same baseline flush/flow rates used for the new fixtures

Buy Now
Questions 10

A project seeking to achieve Indoor Environmental Quality Credit, Low Emitting Materials has outdated certifications demonstrating that the wall and ceiling paint are low emitting materials. What should the LEED AP do?

Options:

A.

Unattempt the credit

B.

Submit documentation as is

C.

Request that the room be repainted with compliant paint

D.

Obtain current certifications for the wall and ceiling paints

Buy Now
Questions 11

For the achievement of Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse, how are hazardous materials accounted for in the calculation?

Options:

A.

Included in the numerator only

B.

Included in the denominator only

C.

Included in both the numerator and denominator

D.

Excluded from both the numerator and denominator

Buy Now
Questions 12

In addition to the basic requirements for Energy and Atmosphere, Fundamental Commissioning and Verification, which is required to achieve Energy and Atmosphere, Enhanced Commissioning, Option 1?

Options:

A.

Develop and implement a commissioning plan

B.

Review the contractor's submittals for compliance with design documents

C.

Verify the installation and performance of the systems being commissioned

D.

Review the owner's requirements and the basis of design for clarity and completeness

Buy Now
Questions 13

A design team is working on the hotel interior project in a hot and dry location. A heating, ventilating and air conditioning (HVAC) system is within the project scope. Which of the following strategies will contribute to minimization of ozone depleting potential and global warming potential for the project?

Options:

A.

Purchasing carbon offsets

B.

Providing operable windows

C.

Incorporating evaporative cooling

D.

Using multiple small packaged units

Buy Now
Questions 14

A tenant is soliciting proposals for a Commissioning (Cx) agent for Energy and Atmosphere Credit, Enhanced Commissioning. Which qualification must the agent meet?

Options:

A.

Subcontractor of construction manager

B.

Not an employee of the project design firm

C.

Member of the Building Cx Association

D.

Commissioning Authority (CxA) with experience in at least one prior project

Buy Now
Questions 15

For Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification, the final Cx report must include the

Options:

A.

Corrective Action Plan

B.

Thermal Comfort Survey

C.

functional performance tests

D.

mechanical drawings showing all equipment installed

Buy Now
Questions 16

A project has performed an energy model which has resulted in the following energy end use consumption:

LEED-AP-ID+C Question 16

To meet the requirements for Energy and Atmosphere Credit, Advanced Energy Metering, Option 2. Advanced Metering, energy meters must be installed for energy end uses in

Options:

A.

space cooling, interior fans and receptacles

B.

interior lighting, space heating, space cooling and interior fans

C.

interior lighting, space heating, space cooling, interior fans and receptacles

D.

exterior lighting, interior lighting, space heating, space cooling, interior fans, service water heating and receptacles

Buy Now
Questions 17

A project team is pursuing certification for a medical clinic with 150 full time employees and 250 peak visitors. The project team is considering the Location and Transportation Credit for Bicycle Facilities. Providing which of the following is a minimum requirement to earn the credit?

Options:

A.

A bicycle maintenance program for employees

B.

At least one on-site shower and changing facility for employees

C.

Seven short-term bicycle storage spaces within 50 ft. (15 m) of the project's main entrance

D.

Six long-term bicycle parking spaces within 50 ft. (15 m) of the project's main entrance

Buy Now
Questions 18

If the client has purchased green power that is not Green-e certified, then the project team should

Options:

A.

accept not earning Energy and Atmosphere Credit, Green Power

B.

provide documentation as to how the green power is equivalent to Green-e certified

C.

apply for an Innovation Credit and explain the situation in a narrative

D.

apply the percentage to Energy and Atmosphere Credit, Renewable Energy Generation

Buy Now
Questions 19

Which of the following would contribute to the Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 2. Diverse Uses?

Options:

A.

An existing bus stop located 1/4 mi. (0.40 km) away from the LEED project's main entrance

B.

An existing restaurant that is 3/4 mi. (1.20 km) away from the LEED project's main entrance

C.

An existing fast-food restaurant with no drive-in service located 1/8 mi. (0.20 km) away from the LEED project's main entrance

D.

A planned school that will be occupied within 18 months of the date of the LEED project's initial certificate of occupancy and is located 1/4 mi. (0.40 km) away from the LEED project's main entrance

Buy Now
Questions 20

Drywall is purchased from a local manufacturer for a total materials cost of $10,000 USD. The specification of the drywall is:

· 5% of the product is comprised of post-consumer recycled paper sourced from a pulp mill 25 mi. (40 km) away;

· 50% of the product is post-consumer recycled gypsum attained from a facility 30 mi. (48 km) away;

· new gypsum is extracted from a mine 175 mi. (282 km) away.

What is the contributing value of the drywall to Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices?

Options:

A.

$5,500 USD

B.

$9,750 USD

C.

$11,000 USD

D.

$19,500 USD

Buy Now
Questions 21

Discussing the project goals to help identify the credits and options that the team should attempt is an example of

Options:

A.

documenting LEED credits

B.

creating the Basis of Design

C.

developing the LEED Scorecard

D.

implementing the Commissioning Plan

Buy Now
Questions 22

A project needs 5,000 ft2 (464.5 m2) of raised flooring. The tenant wants to refurbish and install an existing raised floor from another building as part of the project. If this material will equate to 14% of the overall project materials cost, which credit would this contribute towards?

Options:

A.

Innovation Credit, Option 1. Innovation

B.

Materials and Resources Credit, Construction and Demolition Waste Management

C.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices

D.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 1. Raw Material Sourcing and Extraction Disclosure

Buy Now
Questions 23

A tenant with 1,000 employees wishes to pursue LEED Interior Design and Construction Certification for their space in which they will be the sole tenant. Which of the following building attributes will help the tenant achieve points in the Location and Transportation category?

Options:

A.

A car sharing program

B.

60 bike racks and seven shower/changing rooms

C.

Electric car charging stations in the parking garage

D.

A bus line with 30 daily rides with a bus stop within 1/2 mi. (0.80 km) of the building entrance

Buy Now
Questions 24

Which project team members should be present at a goal setting workshop when using an Integrative Process project approach?

Options:

A.

Only the design team members

B.

Owner, designer, and contractor

C.

All principal project team members

D.

Project team members with LEED® Credentials

Buy Now
Questions 25

What percentage of occupants require individual control of thermal systems under Indoor Environmental Quality, Thermal Comfort?

Options:

A.

25%

B.

50%

C.

75%

D.

90%

Buy Now
Questions 26

Which of the following phases should be included in the Integrative Process Credit, Integrative Process in order to comply with the intent of this credit?

Options:

A.

Discovery; design and construction; occupancy; operations and feedback

B.

Discovery and design; construction and occupancy; post occupancy and operations

C.

Pre-design and design; construction and occupancy; post occupancy and operations

D.

Pre-design and design; construction and pre-occupancy; post occupancy and operations

Buy Now
Questions 27

Which of the following should a project team take into consideration during the discovery phase of site selection to earn Integrative Process Credit?

Options:

A.

Thermal comfort ranges, plug and process load needs

B.

Programmatic and operational parameters, and building schedule

C.

Transportation, building features, lighting levels and building envelope attributes

D.

Occupant's well-being, building site attributes, transportation and building features

Buy Now
Questions 28

A proposed LEED project will be located within the boundary of a development that has been successfully certified at the Silver level under LEED for Neighborhood Development. The project will earn 10 points from the Location and Transportation Credit, LEED for Neighborhood Development Location. How many additional credit points are available to the project team under the Location and Transportation category?

Options:

A.

Zero additional points are available under the Location and Transportation category

B.

Two additional points are available only in Location and Transportation Reduced Parking Footprint

C.

Eight additional points are available under the Location and Transportation category

D.

18 additional points are available under the Location and Transportation category

Buy Now
Questions 29

What should a team focus on first to significantly improve energy performance or achieve the lowest possible operation cost?

Options:

A.

Choosing energy efficient systems

B.

Conducting a simple box energy model

C.

Implementing passive design strategies

D.

Performing commissioning of energy systems

Buy Now
Exam Code: LEED-AP-ID+C
Exam Name: LEED AP Interior Design + Construction (LEED AP ID+C) V4
Last Update: May 10, 2026
Questions: 100

PDF + Testing Engine

$63.52  $181.49

Testing Engine

$50.57  $144.49
buy now LEED-AP-ID+C testing engine

PDF (Q&A)

$43.57  $124.49
buy now LEED-AP-ID+C pdf