Winter Special Sale Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 713PS592

LEED-AP-ID+C LEED AP Interior Design + Construction (LEED AP ID+C) V4 Questions and Answers

Questions 4

If the client has purchased green power that is not Green-e certified, then the project team should

Options:

A.

accept not earning Energy and Atmosphere Credit, Green Power

B.

provide documentation as to how the green power is equivalent to Green-e certified

C.

apply for an Innovation Credit and explain the situation in a narrative

D.

apply the percentage to Energy and Atmosphere Credit, Renewable Energy Generation

Buy Now
Questions 5

What strategy contributes to achievement of Materials and Resources Credit, Construction and Demolition Waste Management?

Options:

A.

Reuse existing plumbing fixtures

B.

Use on-site soil to re-grade garden

C.

Reuse furniture from the existing space

D.

Return removed carpet to the manufacturer

Buy Now
Questions 6

Which systems must be commissioned to earn Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification?

Options:

A.

Fire suppression

B.

Irrigation controls

C.

Building Envelope

D.

Daylighting controls

Buy Now
Questions 7

A project owner requests that additional outside air be provided to the building occupants in order to improve employee health, welfare, well-being and productivity. However, doing so could make it more difficult to achieve which credit?

Options:

A.

Indoor Environmental Quality Credit, Acoustic Performance

B.

Energy and Atmosphere Credit, Advanced Energy Metering

C.

Energy and Atmosphere Credit, Optimize Energy Performance

D.

Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies

Buy Now
Questions 8

To assess the feasibility of earning Location and Transportation Credit, Reduced Parking Footprint, the project team should be familiar with what local government regulation?

Options:

A.

Minimum number of parking spaces required by the local zoning code

B.

Maximum dimensions for on-street parking spaces allowed by the local zoning code

C.

Minimum number of electric vehicle charging spaces required by the local zoning code

D.

Maximum number of levels in structured parking garages allowed by the local zoning code

Buy Now
Questions 9

Design is underway for a new tenant suite with 4,000 ft2 (371.6 m2) of net occupiable area. The project build-out will include all new HVAC systems. Operable windows are installed as follows:

· A total 75 ft2 (7.0 m2) located within 15 ft. (4.6 m) of all spaces

. A total 50 ft2 (4.6 m2) located within 25 ft. (7.6 m) of all spaces

Which design and documentation strategies must be used to demonstrate compliance with Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

Options:

A.

Tabulate the total area of operable windows to indicate compliance. No mechanical outside air systems required for space HVAC design

B.

Provide MERV 13 (F7) filters on the new HVAC system air handling units. No mechanical outside air systems

required for space HVAC design

C.

Provide new mechanical outside air systems in compliance with ASHRAE 62.1-2010 and document

compliance by tabulating rates in compliance with the standard

D.

Install 25 ft2 (2.3 m2) of new operable windows within 25 ft. (7.6 m) of all spaces and tabulate the total area of operable windows to indicate compliance

Buy Now
Questions 10

To determine the area of interior nonstructural elements, the LEED AP will include which one of the following in the calculation for Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse?

Options:

A.

Up to three layers of a floor assembly

B.

Items that are demolished and not replaced

C.

The interior side of exterior windows and doors

D.

Hazardous materials that are remediated as part of the project

Buy Now
Questions 11

Which of the following statements is correct when defining the project boundary?

Options:

A.

The project boundary must be defined by the limit of construction

B.

The LEED project boundary cannot include more than one building

C.

The gross floor area of the LEED project should be no less than 1,000 ft2 (93 m2)

D.

Contiguous land that is associated with the project that is altered as a result of construction must be included

Buy Now
Questions 12

Which of the following is required for a cooling tower and evaporative condenser in the Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.

Alkalinity testing, drift eliminators and energy star rating

B.

Makeup water meters, conductivity controllers and overflow alarms

C.

Non potable water sources, makeup water meters and bacteria testing

D.

Water treatment calculations, overflow alarms and system performance narrative

Buy Now
Questions 13

Which of the following would achieve an exemplary performance credit?

Options:

A.

Conducting two goal setting workshops

B.

Demonstrating a 55% potable water savings

C.

Achieving an 80% parking capacity reduction

D.

Signing a one-year contract for renewable energy

Buy Now
Questions 14

A photovoltaic (PV) system was installed after commissioning (Cx) was completed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification?

Options:

A.

No action is necessary as the PV system is not required to be commissioned

B.

The PV system installer should commission their own installations and share the results with the project owner

C.

The building's electrical engineer should commission the installation and share the results with the project owner

D.

The Cx agent for the project must return and conduct or oversee the commissioning of the PV system

Buy Now
Questions 15

During value engineering a project team is looking to see if they can reduce the number of thermal comfort controls. The project's LEED AP notices there are thermostats in the public restroom and says they can be eliminated because public restrooms are considered

Options:

A.

unoccupied space

B.

densely occupied space

C.

shared multioccupant space

D.

nonregularly occupied space

Buy Now
Questions 16

For an Interior Design and Construction project to earn Innovation Credit, LEED Accredited Professional, who must submit their credentials as a principal participant of the project team?

Options:

A.

The project administrator

B.

A LEED AP without specialty

C.

The LEED AP with any specialty

D.

The LEED AP with ID+C specialty

Buy Now
Questions 17

A luxury hotel project is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies. Which of the following credits would be applicable?

Options:

A.

Regional Priority Credit, Optimize Energy Performance

B.

Indoor Environmental Quality Credit, Quality Views, Exemplary Performance

C.

Indoor Environmental Quality Credit, Acoustic Performance, Exemplary Performance

D.

Energy and Atmosphere Credit, Enhanced Commissioning, Exemplary Performance

Buy Now
Questions 18

Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.

Commercial dishwashers and coffee makers

B.

Residential clothes washers and dishwashers

C.

Residential dishwashers and drinking fountains

D.

Commercial clothes washers and coffee makers

Buy Now
Questions 19

Which material would have the largest contribution to Materials and Resources Credit, Building Product Disclosure and Optimization- Sourcing of Raw Materials, Option 2. Leadership Extraction Practices?

Options:

A.

75% Rainforest Alliance Certified flooring with a total cost of $3,000 USD

B.

10% Rainforest Alliance Certified furniture with a total cost of $30,000 USD

C.

50% Rainforest Alliance Certified wood veneer with a total cost of $5,000 USD

D.

100% Rainforest Alliance Certified wheatboard with a total cost of $2,000 USD

Buy Now
Questions 20

Which of the following should a project team take into consideration during the discovery phase of site selection to earn Integrative Process Credit?

Options:

A.

Thermal comfort ranges, plug and process load needs

B.

Programmatic and operational parameters, and building schedule

C.

Transportation, building features, lighting levels and building envelope attributes

D.

Occupant's well-being, building site attributes, transportation and building features

Buy Now
Questions 21

For a retail LEED Interior Design and Construction project, the products include 25% by cost Cradle to Cradle v3, Gold certified products, and 25% by cost products assessed with the GreenScreen List Translator. Which of the following Materials and Resources and Innovation credits can the project team achieve?

Options:

A.

Materials and Resources Credit, Interiors Life-Cycle Impact Reduction Option 3. Design for Flexibility and Innovation Credit, Exemplary Performance

B.

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients, Option

1. Material Ingredient Reporting and Innovation Credit, Exemplary Performance

C.

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients, Option

2. Material Ingredient Optimization and Innovation Credit, Exemplary Performance

D.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,

Option 2. Leadership Extraction Practices and Innovation Credit, Exemplary Performance

Buy Now
Questions 22

Which of the following information is needed to document the non-structural elements that will be reused from the existing space in a LEED AP Interior Design and Construction project?

Options:

A.

Elevations and space plans

B.

A tracking spreadsheet and cut sheets

C.

Cut sheets and drawings indicating elements to be reused

D.

Drawings indicating elements to be reused and a tracking spreadsheet

Buy Now
Questions 23

What percentage of occupants require individual control of thermal systems under Indoor Environmental Quality, Thermal Comfort?

Options:

A.

25%

B.

50%

C.

75%

D.

90%

Buy Now
Questions 24

A project team is pursuing certification for a medical clinic with 150 full time employees and 250 peak visitors. The project team is considering the Location and Transportation Credit for Bicycle Facilities. Providing which of the following is a minimum requirement to earn the credit?

Options:

A.

A bicycle maintenance program for employees

B.

At least one on-site shower and changing facility for employees

C.

Seven short-term bicycle storage spaces within 50 ft. (15 m) of the project's main entrance

D.

Six long-term bicycle parking spaces within 50 ft. (15 m) of the project's main entrance

Buy Now
Questions 25

A project's installed water fixtures do not exceed WaterSense maximum levels. Which compliance path should the LEED AP select under Water Efficiency Prerequisite, Indoor Water Use Reduction, and what type of documentation is required to demonstrate compliance with this path?

Options:

A.

Compliance Path 1: Prescriptive Achievement; product cutsheets

B.

Compliance Path 2: Usage-Based Calculation; indoor water use calculations

C.

Compliance Path 1: Prescriptive Achievement; indoor water use calculations

D.

Compliance Path 2. Usage-Based Calculation; prescriptive compliance confirmation

Buy Now
Questions 26

A project owner is seeking Location & Transportation Credit, Surrounding Density and Diverse Uses for an office that is being relocated. In order to promote walkability and reduce the distance driven by employees, which of the following solutions should the project owner consider?

Options:

A.

An employee transportation management plan

B.

A location that has retail shops within the same building

C.

An employee survey measuring occupant usage of public transit

D.

A location that is within 1/2 mi. (0.80 km) of four different basic services

Buy Now
Questions 27

A project team is pursuing certification for a performing arts center in an urban neighborhood. The project will earn one point from the Location and Transportation Credit, Surrounding Density and Diverse Uses. The project team is considering the Location and Transportation Credit for Reduced Parking Footprint. Which of the following needs to be included in the credit calculation?

Options:

A.

The project is located in an area without a code minimum and cannot meet this credit

B.

A 20% reduction in the number of parking spaces from the calculated base ratio of the performing arts center

C.

Existing on-street parking spaces in the public right-of-way along the street in front of the project's main entrance

D.

Existing parking spaces in a privately-owned parking deck being leased to the project staff that are 1/8 mi.

(0.40 km) away

Buy Now
Questions 28

Which of the following sinks is classified as a private lavatory faucet under Water Efficiency Credit, Indoor Water Use Reduction?

Options:

A.

A sink in a shared office restroom

B.

A sink in a private office bathroom

C.

A sink in a private hotel room bathroom

D.

A sink in an employee restroom in a retail store

Buy Now
Questions 29

The Commissioning Authority (CxA) must report results, findings and recommendations directly to the

Options:

A.

owner

B.

architect

C.

contractor

D.

project manager

Buy Now
Questions 30

Regarding the Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices, in addition to materials costs, what information is needed to determine the total cost of each product?

Options:

A.

Taxes and delivery costs

B.

Taxes and installation costs

C.

Installation equipment and labor

D.

Transportation costs and installation labor

Buy Now
Exam Code: LEED-AP-ID+C
Exam Name: LEED AP Interior Design + Construction (LEED AP ID+C) V4
Last Update: Dec 4, 2024
Questions: 100

PDF + Testing Engine

$66  $164.99

Testing Engine

$50  $124.99
buy now LEED-AP-ID+C testing engine

PDF (Q&A)

$42  $104.99
buy now LEED-AP-ID+C pdf