LEED-AP-ID+C LEED AP Interior Design + Construction (LEED AP ID+C) V4 Questions and Answers
A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of the project's gross floor will be
completed by the time of occupancy. LEED certification is being sought. Which rating system would be the most
appropriate one to use?
A tenant moving into an existing building will need to install new HVAC, power, lighting systems and other equipment.
Which of the following resources would help the tenant meet the requirements of Energy and Atmosphere Credit, Optimize Energy Performance?
A luxury hotel project is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies. Which of the following credits would be applicable?
Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?
According to the Integrative Process Credit, Integrative Process the discovery phase of site selection for an existing
building should identify
A renovation project includes both a new kitchen sink and shower and an existing lavatory and water closet within the LEED project boundary. How would the project perform the Water Efficiency Credit, Indoor Water Use Reduction calculations?
A project seeking to achieve Indoor Environmental Quality Credit, Low Emitting Materials has outdated certifications demonstrating that the wall and ceiling paint are low emitting materials. What should the LEED AP do?
For the achievement of Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse, how are hazardous materials accounted for in the calculation?
In addition to the basic requirements for Energy and Atmosphere, Fundamental Commissioning and Verification, which is required to achieve Energy and Atmosphere, Enhanced Commissioning, Option 1?
A design team is working on the hotel interior project in a hot and dry location. A heating, ventilating and air conditioning (HVAC) system is within the project scope. Which of the following strategies will contribute to minimization of ozone depleting potential and global warming potential for the project?
A tenant is soliciting proposals for a Commissioning (Cx) agent for Energy and Atmosphere Credit, Enhanced Commissioning. Which qualification must the agent meet?
For Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification, the final Cx report must include the
A project has performed an energy model which has resulted in the following energy end use consumption:

To meet the requirements for Energy and Atmosphere Credit, Advanced Energy Metering, Option 2. Advanced Metering, energy meters must be installed for energy end uses in
A project team is pursuing certification for a medical clinic with 150 full time employees and 250 peak visitors. The project team is considering the Location and Transportation Credit for Bicycle Facilities. Providing which of the following is a minimum requirement to earn the credit?
If the client has purchased green power that is not Green-e certified, then the project team should
Which of the following would contribute to the Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 2. Diverse Uses?
Drywall is purchased from a local manufacturer for a total materials cost of $10,000 USD. The specification of the drywall is:
· 5% of the product is comprised of post-consumer recycled paper sourced from a pulp mill 25 mi. (40 km) away;
· 50% of the product is post-consumer recycled gypsum attained from a facility 30 mi. (48 km) away;
· new gypsum is extracted from a mine 175 mi. (282 km) away.
What is the contributing value of the drywall to Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices?
Discussing the project goals to help identify the credits and options that the team should attempt is an example of
A project needs 5,000 ft2 (464.5 m2) of raised flooring. The tenant wants to refurbish and install an existing raised floor from another building as part of the project. If this material will equate to 14% of the overall project materials cost, which credit would this contribute towards?
A tenant with 1,000 employees wishes to pursue LEED Interior Design and Construction Certification for their space in which they will be the sole tenant. Which of the following building attributes will help the tenant achieve points in the Location and Transportation category?
Which project team members should be present at a goal setting workshop when using an Integrative Process project approach?
What percentage of occupants require individual control of thermal systems under Indoor Environmental Quality, Thermal Comfort?
Which of the following phases should be included in the Integrative Process Credit, Integrative Process in order to comply with the intent of this credit?
Which of the following should a project team take into consideration during the discovery phase of site selection to earn Integrative Process Credit?
A proposed LEED project will be located within the boundary of a development that has been successfully certified at the Silver level under LEED for Neighborhood Development. The project will earn 10 points from the Location and Transportation Credit, LEED for Neighborhood Development Location. How many additional credit points are available to the project team under the Location and Transportation category?
What should a team focus on first to significantly improve energy performance or achieve the lowest possible operation cost?