A project owner has hired a Commissioning Authority (CxA) to develop a Commissioning (Cx) Plan which will be
submitted in the LEED application to document Energy and Atmosphere Credit, Existing Building Commissioning -
Analysis, Option 1. Existing Building Commissioning. At a minimum, what should be included in the Cx Plan?
What is the diversion percentage of ongoing consumables in order to achieve exemplary performance as specified in Materials and Resources Credit, Solid Waste Management - Ongoing?
How is the energy baseline determined in Minimum Energy Performance if the building type is not addressed by the ENERGY STAR® rating tool?
When calculating Water Efficiency Credit, Outdoor Water Use Reduction, the irrigation of athletic fields
A building is certified in LEED EB v2.0. Upon recertification, which LEED Operations and Maintenance version should be used?
An ASHRAE Level 1 walkthrough analysis contributes to what prerequisite or credit?
A district energy system provides chilled and hot water to a building on a campus. What equipment must be commissioned to meet the requirements of Energy and Atmosphere Credit, Existing Building Commissioning - Analysis, Option 1. Existing Building Commissioning?
In order to earn Indoor Environmental Quality Credit, Green Cleaning - Custodial Effectiveness Assessment, what is the highest APPA Leadership in Educational Facilities' Custodial Staffing Guidelines score a facility may achieve?
Discussing the project goals to help identify the credits and options that the team should attempt is an example of
What is the allowed maximum tenant space exclusion for Energy and Atmosphere Prerequisite, Minimum Energy Performance?
Which materials or products are covered in Materials and Resources Prerequisite, Facility Maintenance and Renovations Policy?
The maximum number of points in the Innovation Category that can be achieved by exemplary performance is
Storage locations are required for which of the following recyclable materials?
A LEED project is considering converting 75% of its existing composite roof to a vegetated roof. The project's landscape architect also suggests an open-grid pavement system for 30% of the site paving, and colored concrete for 25% of the site paving. Which of the following factors must be considered when selecting the materials for these strategies?
An individual tenant in a multi-tenant building is unwilling or unable to provide their purchasing data. How does this affect the overall requirement for Materials and Resources Credit, Purchasing - Ongoing?
When tracking waste data during the performance period for Materials and Resources Credit, Solid Waste Management - Ongoing, which strategy may be used to document total and diverted waste?
What percentage of individual occupant spaces must have individual lighting controls in projects seeking Option 1.
Lighting Control in Indoor Environmental Quality Credit, Interior Lighting?
A manufacturing plant is increasing units produced and the number of employees annually. The building is documenting compliance with Energy and Atmosphere Prerequisite, Minimum Energy Performance, Case 2, Option 1. Path 2 Benchmark Against Typical Buildings Using Comparables. Which of the following should be used to normalize the building's energy use?
When conducting the Indoor Environmental Quality Credit, Occupant Comfort Survey what is the minimum percentage of building occupants that must respond?
What is the maximum distance between readings required to represent the illumination levels at the property perimeter to earn the Sustainable Sites Credit, Light Pollution Reduction?
Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?
According to Sustainable Sites Credit, Rainwater Management, what is the maximum time allowed to comply with a failed inspection?
A building manager changes the sequence of operation for boilers to better match heating demand as a result of an ASHRAE Level 2 analysis. Which of the following is an example of an appropriate topic for training of building operations staff to continue implementation of this change and meet the requirements of Energy and Atmosphere Credit, Existing Building Commissioning - Implementation?
A building owner wishes to provide better Indoor Environmental Quality to the building occupants while containing capital costs. The LEED AP suggests pursuing Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2. Filtration. However, the existing HVAC system was not designed to accommodate the required filters but is otherwise efficient and operating well. Which strategy would enable credit achievement?
Which of the following transportation modes can be included as an alternative commuting method in the calculation for Location and Transportation Credit, Alternative Transportation?
A benefit of recommending LED lamps in an environmentally preferable purchasing policy is that they
What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?
The development of a five-year plan under Sustainable Sites Credit, Site Improvement Plan contributes to the achievement of
At a minimum, which two factors must be continuously monitored by the system in order to achieve Indoor Environmental Quality Credit, Thermal Comfort?
Under Indoor Environmental Quality Credit, Interior Lighting, outlet powered task lighting contributes towards
compliance for what category of building space?
Who is the best person to serve as the Indoor Environmental Quality Manager to successfully implement Indoor Environmental Quality Credit, Indoor Environmental Quality Management Program?
What is the required frequency for conducting a waste stream audit in maintaining a high-performing solid waste management program?
Presuming all water fixtures meet the LEED Operations and Maintenance Rating System requirements, which of
the following statements is correct when considering baseline water usage in relation to water use?
A LEED AP performs several on-site reviews for LEED compliance and encounters the following scenarios. Which scenario requires the installation of additional meters to comply with Energy and Atmosphere Prerequisite, Building-Level Energy Metering?
Which of the following is considered an ongoing purchase for the purpose of calculating Materials and Resources
Credit, Solid Waste Management - Ongoing?
Which of the following environmental concerns is exacerbated by impervious surfaces?
Which of the following prerequisites or credits have synergies with Materials and Resources Prerequisite, Facility Maintenance and Renovation Policy?
A project is using an on-site captured rainwater system and municipally treated wastewater for both flush fixtures and irrigation. To which of the following Water Efficiency prerequisites or credits can these alternative water sources be applied?
In densely populated rooms, CO2 monitors must be located a minimum of how many feet (meters) above the floor?
For an office building with few visitors, which of the following actions must the project team do in order to comply with Location and Transportation Credit, Alternative Transportation?