RCDDv14.1 BICSI Registered Communications Distribution Designer – RCDDv14.1 Questions and Answers
A program is developing a next-gene ration product line, and one component has been delivered. However, due to a change request, expectations for another component are unmet
What activity should the program manager perform next?
A newly appointed country manager suggests that the regional program manager use a social media platform to expedite communications and address questions. The new country manager used this social media platform at a previous job.
What should the regional program manager do to address the country manager ' s request?
In a budding with one join room for serving as the FR and EF and four dedicated TRs on the same floor a total of__________ 103 mm (4 trade size) conduits should be installed to interconnect the backbone pathways to the ER.
The program manager compiles a program performance report for review by the program governance board. The performance report indicates that the scope, quality and schedule objectives have been me, but costs and resource utilization are higher than expected The program can no longer deliver the planned return-on-investment within an acceptable level and the intended benefits have not yet been realized
After further analysis of the performance indicators the program manager should do which of the following*?
Which requirement does the ICT distribution designer provide to the Mechanical Engineer in charge of the HVAC design for a Telecommunication Space?
An organization must accelerate a product to market. The program manager completes the preliminary program slaps and holds a kick-off meeting Project managers submit their preliminary schedules for review
What should the program manager do next?
A company CEO meets with key customers to learn how they can be better served Alter discovering that some executive team members disagree with each other, the CEO asks the program management office (PWO) to develop a program to better serve key customers based on their strategic importance to the company ' s long-term goals.
What should the program manager do to establish and successfully manage the program ' s direction?
The program director of a four-year program, estimated to require 600.000 person-days effort, notices that team morale has decreased over the last three months. The program is at a critical stage with 70% completion through the last phase. A number of defects are found that result in teams working additional hours. The program director requests that the program management office (PMO) gather metrics to monitor the situation
Which of the following metrics should the PMO capture on a monthly basis?
What is the MAXIMUM number of work areas served by a single Multiuser Telecommunications Outlet Assembly (MUTOA)?
During the program execution stage the component project manager responsible for testing estimates that budgeted hours may exceed 200 hours. What should the program manager do?
When designing horizontal pathways, the ICT distribution designer should consider the design ' s ability to (Select two options.)
What would prevent a program manager from completing program closure once a program has been completed?
A program is near completion and the benefits will be delivered shortly. The program manager prepares to initiate program closeout activities to release the program resources.
Before initiating closeout and releasing the resources, what should the program manager do?
A program manager is concerned because several change requests in a component project are causing delays to the program ' s work package milestones. There are insufficient skilled resources within the component project to complete both the change requests and the milestone tasks.
What should the program manager do next to address this risk?
When designing a video communications network, which type of video communication link is two-person videoconferencing?
The program manager defines the program objectives, requirements and develops a high-level road map. To ensure program alignment with the enterprise strategic plan the program manager should work with which of the following?
Which two of the following apply during a project’s close out process? (Choose two.)
A program manager initiates a new global program to create a higher level of protection for a company ' s intellectual property. The company exhibits a relaxed culture and environment and is intolerant of processes to the point of being considered process-adverse However, the company ' s culture is tolerant of long-term program activities, and provided there is continuous progress on improving the protection of its intellectual property Expectations for rapid progress are low
What should the program manager do next?
For optical fiber cabling, which of the following test instruments is used to locate and identify any anomalies?
The program sponsor returns from a board of directors meeting alter identifying a significant risk to the program schedule. This may Impact the program ' s benefits realization
What should the program manager do next?
Which two of the following items should be considered for inclusion in a comprehensive working outline of a SoW? (Select two options.)
When designing an underground conduit system, a single bend should be NO MORE THAN ________ degrees.
When preparing an upfront cost estimate, the ICT distribution designer MUST consider which two of the following fees? (Select two options.)
The program manager must define the program and understand the organization ' s target market and customer needs. What should the program manager do first?
Where would an ICT distribution designer working for a company responding to a RFP expect to find requirements concerning alternative dispute resolution in the scope of work (SOW)?
Company A recently signed a contract with a strategic business partner, Company B, to jointly roll out a new technology Company B is excited about the joint marketing opportunity Company A ' s component Quality Assurance team has expressed concerns to you the program manager, Ural the product is being rolled out prematurely and has identified potential issues with backend support systems. QA, however, assures you that a manual work around is possible, but not ideal Company B requests an enhancement to the new product. In a meeting with Company B, you determine that additional funding will be required and resources allocated and scheduled
What is your MOST appropriate next step?
A program to implement a company ' s new system is nearing completion and the program manager attempts to close the program However, despite training provided to the operational staff on the new system, there is concern that the defined expected benefits will not be fully realized.
To prevent this concern in the future, which of the following should occur?
A program manager recognizes that a successful resource being used in project A could also be used in project B. What should the program manager do first to leverage the utilization of this resource?
Which two of the following roles do an ICT distribution designer use to ensure a timely and cost-effective telecommunications construction project? (Select two options.)
What is a simplified cone of protection for lightning strikes as it pertains to a structure (building, pole, etc.)?
The program manager wants to ensure that a program contributes to shareholder value. The program manager should verify alignment with which of the following?
When responding to a submittal that has been rejected and/or has comments written by a reviewer, the ICT distribution designer may need to perform which two of the following actions? (Select two options.)
A program manager evaluates conflicting stakeholder demands associated with cost, schedule, and intended benefits. The implementation team has a strong interest in cost and schedule, and a limited interest in the benefits being produced. The client is only focused on benefits.
Which of the following actions should the program manager take?
Program A is dependent upon program B lo complete benefits sustainment for two benefits Program A is on track to meet program benefits However program B ' s program manager has just advised that program B has been closed.
What should program A ' s program manager update and review first with the stakeholders?
A program manager joins a learn to fix a troubled enterprise-wide customer relationship management (CHM) system Analysis indicates that duplicate customer information data is resulting in redundant client information. The program manager accesses the knowledge repository tor similar programs to gather historical data and trends. A corrective action is identified, and a change in process is implemented to regain data integrity
What should the program manager do with the knowledge gained from this activity?
Which two of the following are ADVANTAGES of underground conduit systems? (Select two options.)
A program manager is concerned that a program will be unable to achieve its intended benefits. How should the program manager handle this concern?
After meeting with the program sponsor and stakeholders, the program manager is asked by the sponsor to accelerate the program to replace two legacy financial systems. The legacy systems are at risk of premature failure.
What should the program manager do next?
In which of the following design phases does the ICT distribution designer perform coordination with stakeholders and other disciplines (e.g.. mechanical, architectural, electrical) to ensure that the design is constructive and that any conflicts are resolved early in the process?
You are designing a multi-story dwelling and need to place the CTR ' s. Every floor is not available. What is the alternate spacing for the CTRs?
In specifying labels and pruned tags that meet Underwriters Laboratories (UL) 969 Standard, marking and labeling systems are provided following the listed metrics. Which two of the following are REQUIRED for the UL standard? (Select two options.)
A program manager building the world ' s largest cruise ship is resolving the conflict between the two main sponsors who cannot agree on the number of food and beverage outlets to have onboard. What should the program manager do?
When sizing an underground entrance facility, what is the MINIMUM amount of 103 metric designator conduits (4 trade size) that should be specified by the ICT distribution design?
You are designing distribution for a seven unit townhouse with in slab conduits. What is the MINIMUM number of 27 mm (1 in) rigid PVC Type 2 or metallic conduit that is required to satisfy distribution to each unit?
In a program ' s definition phase a program manager in country A is assigned to expand a restaurant chain into country B. communications management plan zThe program manager creates the program team by identifying the required protect management resources
Which of the following represents an initial step needed to evaluate available resources that are aligned with me program ' s needs ' '
A company wants to perform a preliminary stakeholder analysis lo assess a new program ' s support. What should the program manager develop ' ?
Using an earth ground resistance tester, what is the recommended MAXIMUM value for resistance between any two points along the entire length of a bonding or grounding conductor (not including the earth electrode system)?
AI the beginning of the second year of a five-year strategic cycle, the program management team attends a checkpoint session to review the state of the company ' s strategy During the previous year, the company needed to comply with new government regulations that impacted this strategy.
Based on this information, what should the program manager do?
What is used to facilitate MINOR changes to the Project Requirements?
Request lot Information (RFI)
A utility company manages its capital improvement projects (CIP) using engineers, project managers, and program managers. A new sponsor from the utility company assesses the CIP and decides to reorganize it into a program. They invite seven companies to discuss their approach to monitor and control the program and its constituent protects.
Where should the program manager incorporate this input?
An ICT distribution designer is representing a client during a project execution. What is the designer ' s role in the Vendor and Contractor Coordination?
A program manager assigns project managers lo five component projects and continues to develop the program team. Which of the following represents the program manager ' s strategy?
i program with six projects has been running for three years. The company ' s procurement and contracts department has compiled a qualified seller list. The program manager determines that one of the projects must be outsourced
he program manager will use the qualified seller list to do which of the following?
A software development program will launch iterative versions of new software called Alpha over two years Following that, a program will be released to the program team and developers to create new software called Beta While the program manager prepares the program closure plan tor Alpha, the program sponsor expresses concern about its support after program closure.
What should the program manager do as part of Alpha ' s program closure plan?
In a RFI, an ICT distribution designer instructs the contractor to test all the fibers In a PON Installation. Which of the following testing requirements does the designer include?
A new program is comprised of four component projects. The program manager must assign project managers to each of the tour projects. There are eight potential project managers to consider. What should the program manager do before assigning the project managers?
Which type of scheduling chart utilizes predecessor and successor relationships when identifying tasks?
Exhibit:

In this future marina layout, assuming that there are fewer than 10 slips being cabled, what would be the pre-cabling guideline to follow for terminal A?
A company initiates a program to reorganize its sales and production departments. Three production departments are located at the three production plants next to the company ' s headquarters Five regional sales departments are located at different locations around the world.
At this stage of the program, what is the first step?
A software company ' s program manager is conducting closing procedures for a program. At the last steering committee meeting, realized benefits were presented to the program governance board.
What should the program manager do next?
The program manager completed the program ' s benefits analysis and planning activities. What will this ensure tor the program?
XYZ Company hires you to make its transitioning procedure more effective in meeting close-out requirements. You review XYZ ' s transitioning procedures to eliminate any that do not belong in the close-out phase.
Which of the following procedures should you removed?
Before working on equipment, what is the FINAL step in the lockout/tagout (LOTO) procedure?
An organization requests that a junior project manager, with no previous experience or training in the industry take over a complex program component. The program component involves senior subject matter experts and has dependencies with other large projects to deliver key benefits to the organization.
How should the junior project manager respond to this request?
The program manager has a global program with live component projects. The program sponsor wants the management plans, processes/procedures and technology to be uniform across the program. The requirements will create issues and result in increased costs. The program sponsor is new and has imposed these new requirements six months into a three-year program.
What should the program manager do next?
Exhibit:

A pay telephone using coins needs to be installed in a public area. In the specifications, it is required that the telephone shall meet the ADA (Americans with Disability Act) requirement for side reach using a wheelchair. What will be the maximum reachable height or the value of " X " ?
Stakeholders make ad-hoc requests on a routine basis. This causes duplication of reporting and communication gaps that affect the program ' s performance
To resolve this situation, which of the following must go through critical review and change " ?
What is the MAXIMUM length of continuous conduit allowed before a pull point or pull box needs to be installed?
The program manager plans to address a negative cost variance generating a red flag in the program management status report. What should the program manager do?
The ICT distribution designer is hired to design a Telecommunications Room on the third floor of a building. The size of the floor is 20 m by 26 m (92 x 85 It). What is to be the MINIMUM size of the TR?
Which type of protection for electrical power stations provide isolation against a rise in potential of station ground and also provide drainage protection against longitudinally-induced voltages?
You are designing a system requiring the transmission of data. Your system must perform higher than ________ kHz in order to do so.
For a cost estimate, an ICT distribution designer should produce a document listing each task with a cost placed beside them. The type of document used is a
The customer of a three-year program does not want to receive any intermediate details on the program. The program appears to be in trouble and the customer is concerned about a new system ' s cost. The program manager has provided monthly performance reports throughout the program ' s lite cycle.
Which of the following would the customer be interested in reviewing?
To accommodate telephone, data, CATV, security and multimedia, a MINIMUM of ________ strands of optical fiber auxiliary disconnect outlet (ADO) cable should be provided.
A program is midway through the program delivery phase when a key stakeholder asks if the program is meeting its defined objectives.
How should the program manager demonstrate the program ' s progress " ?
A voice over IP network that converges voice capabilities with softphones. Video communications, instant messaging is referred to as
Which two of the following components are included in a backbone distribution system (BDS)? (Choose two.)
A program to implement a new payroll processing system at a healthcare company is nearing completion and is under budget. What should the program manager do next?
When designing for horizontal pathways in an environment that requires fire-stopping for penetrating a rated wall, what is the MAXIMUM till ratio for telecommunications cabling in a cable tray?
A large automaker begins a program to create the next-generation car. As the program team is composed, key stakeholders are identified
Key stakeholders for the program should include which of the following?
A company is building a global monitoring network in 40 countries. The program completes the planning phase and a review is conducted of the program components ' strategic alignment with the intended program and company goals. The review identifies issues that should be resolved to improve program progress. One of the issues identified is the lack of incorporation of both software and configuration management tools
Which of the following must be addressed?
Based on the estimated work area size, what is the MAXIMUM number of work areas that a telecommunications enclosure shall serve?
A program is completed and the expected benefits are realized Before executing the transition and closing of the program, what should the program manager do?
A program manager notices that one project manager tends to withdraw during important team discussions to avoid conflict. What technique could the program manager use to gam more input from this project manager?
Telecommunications systems typically combine multiple digital data streams into one data stream. What is this process called?
During program execution, how does a program manager ensure that benefits are being realized in accordance with program governance*?
An insurance company launches a program to consolidate the multiple systems used by its agents This program will benefit stakeholders by offering efficient policy administration processes, improved customer service and the ability to grow market share However, since the new program will also introduce new policies and pricing controls, some stakeholders are opposed to its implementation
To obtain consensus among stakeholders, what should the program manager do?
In a design type Scope of Work (SoW) the ICT distribution designer is responsible for providing
A program sponsor is concerned about the status of high-priority risks and budget variances. The program manager should refer lo which of the following?
