Spring Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: pass65

NCSE-Core Nutanix Certified Systems Engineer-Core (NCSE-Core 6.8) Questions and Answers

Questions 4

A prospect indicates a requirement to replicate data offsite for a production workload.

Which three questions the SE ask about the prospect's requirement?

(Choose three.)

Options:

A.

What are the retention requirements?

B.

How much data needs to be replicated?

C.

What OS will be deployed on the server VMs?

D.

What is the WAN speed and latency between source and target sites?

E.

Will Prism Pro be licensed for each cluster?

Buy Now
Questions 5

A prospect customer's expected workload consists of the following: 110 vCPU 512GB RAM * 500TB Storage They need a solution to help decrease storage costs. The majority of their storage requirements come from an imaging application that stores scanned JPEG images. Which two Nutanix capabilities should be leveraged? (Choose two.)

Options:

A.

Erasure Coding

B.

Storage-Only Nodes

C.

Capacity Tier Deduplication

D.

Compression

Buy Now
Questions 6

A customer has deployed Nutanix with Esxi for VDI workloads and is considering Nutanix for a major server virtualization project. The customer is running z/Virtual Machine today for a mission critical workload and would like to consider Nutanix as a potential platform.

Which reason would currently disqualify this prospect as an opportunity?

Options:

A.

Accurate sizing information is not available

B.

Nutanix does not support z/OS or z/VM

C.

There is no assurance of project progression yet.

D.

New hardware will be announced next quarter.

Buy Now
Questions 7

Which three configuration scenarios are valid for the deployment of Prism Central? (Choose three.)

Options:

A.

Environments use Network Address Translation.

B.

Prism Elements and Prism Central art in different subnets.

C.

Environments do not have Internet access.

D.

Prism Elements and Prism Central have proxy configured.

E.

Environments use the 192.168.5.0/24 CVM management network.

Buy Now
Questions 8

Which type of data is distributed by Zookeeper to ensure availability in the case of node or block failure?

Options:

A.

User Data

B.

Metadata

C.

Configuration Data

D.

Snapshot Data

Buy Now
Questions 9

prospect uses Vmware, Oracle, and Microsoft products for a critical application. The prospect prefers an all flash array because they have significantly invested in servers for their Oracle environment to save on licensing costs.

which feature should be discussed to address this objection?

Options:

A.

AHV

B.

Hyper-V support

C.

ABS

D.

All flash nodes

Buy Now
Questions 10

A systems engineer sizers an environment based on the customer's requirement of N+2 resiliency for the entire cluster. In which two ways could the configuration be changed to meet the customer's requirements ? (Choose Two)

Options:

A.

Increase the RAM capacity per Node

B.

Increase the number of Nodes

C.

Increase the CPU capacity per Node

D.

Increase the SSD capacity per Node

Buy Now
Questions 11

A prospect is experiencing disk performance issues in their database environment. The prospect's databases currently run on physical servers and an iSCSI SAN with spinning disks. Which two Nutanix features should an SE discuss with this prospect to address their disk performance issues? (Choose two)

Options:

A.

Snapshots

B.

Data Locality

C.

De-duplication

D.

Erasure Coding

E.

All Flash Nodes

Buy Now
Questions 12

A customer has a requirement to run a single instance Oracle Database VM on AHV that is driving over 250,000 IOPs. Which AOS feature should be positioned to deliver the highest level of performance?

Options:

A.

Volume Group Load Balancer

B.

Data Locality

C.

Shadow Clones

D.

App Mobility Fabric

Buy Now
Questions 13

An administrator needs to relocate an AHV cluster to a new datacenter during a maintenance windows. The cluster will use the same IPs in the new datacenter.

Which two steps should be taken to prepare for this task? (Choose Two)

Options:

A.

Stop all Nutanix Files clusters

B.

Reconfigure IPMI for the new datacenter.

C.

Relocate the linked LDAP server

D.

Shut down all user VMs in the cluster

Buy Now
Questions 14

A customer needs a tool packaged as a VM that uses realistic workloads paired with real-world test scenarios for HCI environments. The goal is to benchmark performance during typica! workflows and failure events. Which Nutanix tool meets these requirements?

Options:

A.

Foundation

B.

Move

C.

X-Ray

D.

Cluster Check

Buy Now
Questions 15

A prospect's storage administrator is concerned about deploying Nutanix for their vSphere server virtualization environment due to anticipated increases to data retention for compliance purposes and associated costs.

Which Nutanix feature should an SE discuss to convince the prospect to

move forward?

Options:

A.

Linear scalability by adding more nodes

B.

Acropolis Block Services

C.

Adding Storage Only nodes

D.

Extending storage container with existing SAN storage

Buy Now
Questions 16

A System engineer (SE) is gathering requirements to size a hybrid cluster to replace a prospect's existing IT test and development environment. The prospective customer has indicated the cluster contains no business critical applications and has provided the aggregate vCPU and RAM requirements of the existing cluster. which two additional items does the SE require to size the cluster?(Choose two)

Options:

A.

Existing Drive Count

B.

Virtual Switch Configuration

C.

Working Data Set

D.

Storage Capacity

Buy Now
Questions 17

With in RVtools output, which tab provides actual utilization information on thick provisioned disk?

Options:

A.

vInfo

B.

vPartition

C.

vCenter

D.

vDisk

Buy Now
Questions 18

A customer needs to increase availability in their Nutanix environment by enabling rack awareness. The current configuration consists of : 1 RF2 cluster consisting of 7 identical NX-3170 1U nodes , All Storage efficiencies are disabled , Which two changes should the systems engineer propose to meet the customer requirements ? (Choose two)

Options:

A.

Add 1 additinal NX-3170 1U node.

B.

Add 2 additional NX-3170 1U nodes.

C.

Distribute nodes across 2 separate racks.

D.

Distribute nodes across 3 separate racks.

Buy Now
Questions 19

Refer to Exhibit.

NCSE-Core Question 19

An administrator increases the cluster RF to 3. The containers are not modified.

What will the new values in the data resiliency dashboard be for FAILURES TOLERABLE for the Zookeeper and Extent Groups components?

Options:

A.

Zookeeper = 1 and Extent Groups = 1

B.

Zookeeper = 2 and Extent Groups = 2

C.

Zookeeper = 2 and Extent Groups = 1

D.

Zookeeper = 1 and Extent Groups = 2

Buy Now
Questions 20

An administrator is auditing the recent alerts on the cluster to report to the management.

Which dashboard in Prism Central can be used to generate this report?

Options:

A.

Alerts

B.

Explore

C.

Apps

D.

Analysis

Buy Now
Questions 21

A prospect is evaluating HEP SimpliVity and Nutanix Software-Only on HPE servers and receives FUD from the competition regarding HPE not supporting or officially partnering with Nutanix.

which two items should be leveraged to overcome concern about product supportability? (Choose two)

Options:

A.

TSAnet

B.

SimpliVity competitive briefing

C.

NX appliances

D.

Nutanix Sizer BOM

E.

Nutanix Software Only HCL

Buy Now
Questions 22

An SE is using the output from RVTools to size the storage capacity for a Nutanix Cluster.

Which value most closely resembles the minimum required storage capacity that should be entered for the aggregate workload in sizer?

Options:

A.

15 TB.

B.

24 TB

C.

37 TB

D.

39 TB

Buy Now
Questions 23

How long must data be 'write-cold' before Erasure Coding can begin optimization?

Options:

A.

1 hours

B.

6 hours

C.

1 days

D.

7 days

Buy Now
Questions 24

A prospect is seeking a Nutanix solution for a mission critical application that needs to sustain two simultaneous node outages and prefers that the cluster be able to fully rebuild both data and metadata in the event hardware issues.

what is the minimum number of nodes required for the cluster?

Options:

A.

4

B.

5

C.

6

D.

7

Buy Now
Questions 25

How should an administrator correct an SSL error when connecting to a Nutanix cluster?

Options:

A.

Add the SSL certificate to the workstation’s trusted people store

B.

Create a new self-signed certificate for the cluster with a 4096 bit key

C.

Create a new SSL certificate for the cluster signed by an AD certificate authority

D.

Add the SSL certificate to an AD group policy applied to all computer objects

Buy Now
Questions 26

An administrator protected a DB VM running on a Nutanix cluster with NearSync Replication, which schedules to repeat every 15 minutes to a second site. The daily change rate is low. During nightly backup, the replication windows is missed due to write volume. Which two options describe the expected behaviour? (choose two)

Options:

A.

The administrator needs to re-enable it manually

B.

Protection Domain transitions back to hourly schedule.

C.

NearSync stops working and fails over to the remote site.

D.

The system continuously tries to get to the NearSync schedule.

Buy Now
Questions 27

An administrator is deploying several new application VMs to a Nutanix Cluster. The application is very transactional with a 28/72 random, read/write ratio. What should the administrator do?

Options:

A.

Add one large SSD to each node and enable Flash Mode for the VMs.

B.

Add a minimum of four virtual disks to each VM and aggregate them on guest OS level.

C.

Add a minimum of four SSDs to each node to ensure all write go to the SSDs.

D.

Add one large virtual disk to each VM and use it for all application data.

Buy Now
Questions 28

A prospect's business is growing 100% year over year. The prospect is interested in Nutanix for their main datacenter due to the alility to scale quickly and easily. They have three remote sites that will be refreshed within the next year. Each site needs to replicate to their many datacenter. The SE proposes the Nutanix NX line, and the prospect asks to utilize the Xpress line.

For which reason is the Xpress line the wrong choice? (Choose two)

Options:

A.

SX is limited to two 4-node clusters.

B.

SX has a lower services cost for installation.

C.

SX is limited to one 4-node cluster.

D.

SX licensing does not support cluster-to-cluster replication

E.

SX licensing will not support many-to-many- cluster replication

Buy Now
Questions 29

In a competitive POC scenario, the prospect is testing Nutanix against VxRail and Hyperflex. The customer is interested in an ""All in One"" solution that's simple to deploy, manage, and grow.

Which two test plan items should the SE map to POC success criteria?

(Choose two)

Options:

A.

Deploy HCIbench to determine maximum IOPS.

B.

Deploy Calm to automate application deployment.

C.

Expand the cluster by adding an additional node.

D.

Use a single interface to manage and monitor the full stack.

E.

Enable all data efficiency settings.

Buy Now
Questions 30

Which website acts as a single gateway for all Nutanix deal registrations, forums, software downloads, product documentation product alerts and support interactions?

Options:

A.

my.nutanix.com

B.

nutanixbible.com

C.

support.nutanix.com

D.

portal.nutanix.com

Buy Now
Questions 31

What are two key Nutanix value propositions? (Choose two)

Options:

A.

One-Click Infrastructure Management

B.

Rapid time to value

C.

Highest performance across all workload types

D.

Lowest initial cost than a comparable competitive HCI or 3-tier solution

Buy Now
Questions 32

A customer is evaluating Nutanix to replace their existing 200TB filer. The filer is used to store archived images. To achieve maximum storage density. RF2 and Erasure Coding are proposed. What is the minimum number of nodes required to support the maximum Erasure Coding stripe size of 4/1 (data/parity)?

Options:

A.

4 Nodes

B.

5 Nodes

C.

6 Nodes

D.

7 Nodes

Buy Now
Questions 33

A customer wants to decrease costs and increase efficiency by eliminating NAS silos and adopting a cloud-like mindset. Which Nutanix product meets these requirements?

Options:

A.

Nutanix Calm

B.

Nutanix Xi Frame

C.

Nutanix Files

D.

Nutanix Beam

Buy Now
Questions 34

Which tool could be used to perform a sizing discovery in a general server virtualization environment running both VMware ESXi and Nutanix AHV?

Options:

A.

MAP

B.

Collector

C.

AWR

D.

RVTools

Buy Now
Questions 35

An administrator receive report that VDI desktop performance in an 8-node Nutanix VDI environment is poor. Opening applications takes between 1 and 2 minutes. When investigating the issue, the following conditions are found:

• Cluster memory utilization: 80%

• Cluster SSD utilization: 70%

• Average VM CPU wait time: 11 %

• CVM CPU utilization: 75%

Which action should be taken to improve VDI performance?

Options:

A.

Increase the amount of SSD storage in the cluster

B.

Ad memory to the nodes in the cluster

C.

Increase the number of vCPU cores allocated to the CVM

D.

Add CPU resources to the cluster

Buy Now
Questions 36

An SE is working to size a prospects environment that includes production Oracle databases.

Which Oracle output should the SE request from the prospect to collect accurate sizing information?

Options:

A.

STATSPACK

B.

Active Session History Report

C.

Oracle Export Schema

D.

Automatic Workload Repository Report

Buy Now
Questions 37

A prospective customer has a requirement for Data-at-Rest-Encryption for all their data Which two license options are available to address this requirement? (Choose two)

Options:

A.

Pro with the Encryption SKU

B.

Ultimate

C.

Pro

D.

Starter with the Encryption SKU

Buy Now
Questions 38

An SE is in the discovery phase with a new customer. The customer is frustrated with the lack of transparency into their environment with the current monitoring tools. The customer has difficulty correlating the degradation of the end user experience with point-in-time events.

Which Prism feature should the SE demonstrate to show relevant value?

Options:

A.

Analysis page with custom charts and event reporting

B.

A specific virtual machine's Performance Summary

C.

Event tab on the Alerts page

D.

A specific virtual machine's virtual disk Additional Stats

Buy Now
Questions 39

A prospect wants to target Nutanix as infrastructure for running VMs built as part of their new Continuous Integration and Delivery (CICD) pipeline. Hundreds of builds will occur per day across their development organization.

Which two items should the SE identify to begin sizing the Nutanix deployment? (Choose two.)

Options:

A.

The configuration manager that the customer will use with the application builds

B.

The frequency and lifespan of each application build

C.

The build manager that the company will use for the builds

D.

The configuration/specs of the VMs within each application build

Buy Now
Questions 40

A customer needs to expand an existing cluster to accommodate workloads. The workloads require 5TB of storage capacity (1.2TB of working set data), 64GB of memory, and 10 physical CPU cores. Their current cluster is configured as follows:

• 4x NX-3060-G5 nodes

• Each node is configured with 2x E5-2620v4 processors (8 Cores each), 128GB RAM, 2x 960GB SSDs, and 4x 2TB HDDs

• The cluster is configured as RF2 and is sized for N+1 availability

• Each CVM is configured with 32GB of memory

To maintain optimal metadata balance and data availability, which configuration should be recommended?

Options:

A.

2x NX-3060-G5 - 2x E5-2620v4 processors, 128GB RAM, 2x 960GB SSDs, 4x 2TB HDDs

B.

1x NX-6035C-G5 - 2x E5-2620v4 processors, 128GB RAM, 1x 1920GB SSDs, 5x 4TB HDDs

C.

1x NX-3060-G5 - 2x E5-2620v4 processors, 128GB RAM, 2x 1920GB SSDs, 4x 2TB HDDs

D.

3x NX-1065-G5 - 2x E5-2620v4 processors, 128GB RAM, 1x 1920GB SSDs, 2x 4TB HDDs

Buy Now
Questions 41

A customer has two mission-critical applications and needs to have them backup up to a remote location. The remote location is connection using a leased line and has an average latency of 7 ms. Which Nutanix technology will provide the shortest PRO possible?

Options:

A.

AsyncDR

B.

NearSync

C.

Metro Availability

D.

Leap

Buy Now
Questions 42

Which functionality allows workloads to continue to run on the host when as AOS upgrade occurs?

Options:

A.

Acropolis Dynamic Scheduler

B.

High Availability

C.

CVM Autopathing

D.

Autonomous Extent Store

Buy Now
Questions 43

A guest VM should be able to tolerate simultaneous failure of two nodes or drives.

What are the minimum requirements for the Nutanix cluster?

Options:

A.

3 nodes with cluster RF 3 and container RF 3

B.

3 nodes with cluster RF 3 and container RF 2

C.

5 nodes with cluster RF 2 and container RF 3

D.

5 nodes with cluster RF 3 and container RF 3

Buy Now
Questions 44

A customer performs a 1-click, non-disruptive upgrade on a 3-node Nutanix cluster. While the CVM on Node A is rebooting, a VM on Node A overwrites an existing block of data. How does Nutanix AOS ensure data integrity during the upgrade?

Options:

A.

AOS marks the replica as read only and waits until the original replica is back online to prevent corruption.

B.

AOS writes two copies across the remaining nodes to maintain resiliency

C.

AOS leverages Erasure Coding to maintain resiliency.

D.

AOS only overwrite the available copy and waits until the original copy is back online before restoring resiliency

Buy Now
Questions 45

A large retailer company recently employed a CIO who decided that all operations should be migrated to public cloud offerings. After 7 months, the project was be a failure and determined to the CIO exited. The retailer’s infrastructure consisted of tens of thousand’s of VMs on thousands of hosts supported by dozen of storage arrays. Only 10% of workloads were migrated to public cloud during the CIO’s tenure.

Which open ended discovery questions should the SE ask to determine pain points or gaps? (Choose two)

Options:

A.

What challenges triggered the public cloud initiative?

B.

Which public cloud offering(s) are utilized?

C.

Is de-duplication q requirement for your workloads?

D.

What are your end users asking for that you cannot deliver today?

Buy Now
Questions 46

A prospective customer wants to build a private cloud in addition to provisioning workloads across multiple public cloud providers.

Presently, the staff lacks the time and skillset for on-premises infrastructure management.

Which two features should qualify this project as a Nutanix opportunity?

(choose two)

Options:

A.

Flow

B.

Calms

C.

Cloud Connect

D.

All falsh nodes

E.

Prism 1-Click operations

Buy Now
Questions 47

An administrator needs to move a Nutanix host from one cluster to another.

Which step should the administrator take after evacuating VMs from the host to be moved?

Options:

A.

From the Task menu in Prism, select Cluster details, then un-check the host from the list

B.

In Prism, highlight the host in the Hardware pane and select Remove Host

C.

In Prism, highlight the host in the Hardware pane and select Remove from Metadata Ring

D.

From the Task menu in Prism, select Licensing hen delete the host license.

Buy Now
Questions 48

An administrator has a VM that consumes large amounts of storage and has the following characteristics:

• Create large / sequential writes

• Data must be kept for years

• Data is normally only accessed at the end of the year to run report

The administrator decides to use Erasure Coding to save space.

Which feature should the administrator utilize to save space for this VM?

Options:

A.

Inline Compression

B.

Flash Mode

C.

Cache Dedup

D.

Post-Process Compression

Buy Now
Questions 49

Which method can be used to migrate a VM configured for UEFI-boot from a Nutanix Hyper-V cluster to AHV?

Options:

A.

Live Migration

B.

Storage vMotion

C.

Nutanix Move

D.

Cloud Connect

Buy Now
Questions 50

A customer recently deployed Nutanix for VDI workloads and determine AFS is suitable for their departmental shares. They ask about infrastructure requirements providing the following file workloads specifics:

• 11.8 TB of data.

• 360000 files.

• 2400 Users.

• 800 shares.

Based on the exhibit,

NCSE-Core Question 50

which criteria shared by customer supports the requirement of additional nodes?

Options:

A.

800 shares.

B.

11.8 TB of data.

C.

360000 files.

D.

2400 Users.

Buy Now
Questions 51

An administrator needs to configure Acropolis File Service (AFS). The administrator is setting up AFS for the first time on the Nutanix cluster.

How many file services VMs are created by default?

Options:

A.

4

B.

3

C.

2

D.

1

Buy Now
Questions 52

A customer's current AHV cluster for mixed server workloads consists of 7 NX-3060-G6 nodes with intel Skylake processors spread across two blocks. Growing demand for resources requires the customer to order three additional NX-3060-G7 nodes with Intel Cascade Lake processors. Which supported approach allows the customer the most efficient use of their additional resources?

Options:

A.

Create a new cluster using a new block populated by the three additional nodes.

B.

Expand the cluster by fully populating the existing blocks, and adding a new block populated with two nodes

C.

Expand the cluster by fully populating the existing blocks with the three additional nodes

D.

Expand the existing cluster by adding a new block populated with the three additional nodes

Buy Now
Questions 53

Prospective customer explains their current infrastructure and upcoming goals. They are a fast-growing software company with approximately 3000 employees. Engineering accounts for approximately half of total staff and is behind on product releases.

This department has been building their own infrastructure using available hardware, SaaS offerings, and public cloud.

There's a new CIO attempting to gain control of existing and incoming

information systems while supporting the agile environment responsible for their rapid innovation with a minimal staff. From this information, which two addressable pain points or gaps should be discerned?(Choose two)

Options:

A.

System availability issues

B.

SQL Server performance issues

C.

""Shadow IT"" that increases the risk of security breaches and brand damage

D.

Slow response time from the infrastructure group (SLAs) that could result in product release delays

E.

significantly degraded end user experience

Buy Now
Questions 54

A prospect has 8500GB of capacity provisioned for a non-production VMware cluster. As Part of migrating to Nutanix. the prospect agrees to convert any thick provisioned disks to thin provisioned disks. Based on additional data. the total active working set for the cluster has been datermined to be 1TB. When entering the Raw input workload into Sizer, what is the minimum amount of HDD Capacity required for the workload? ??

Options:

A.

3.0TiB

B.

3.5TiB

C.

4.0TiB

D.

7.5TIB

Buy Now
Questions 55

A customer who uses Nutanix for mission critical workloads is considering migrating public cloud workloads to Nutanix. The customer has experienced difficulty auditing where applications reside and understanding cloud costs on a per application basis.

Which Nutanix product should be discussed to address the customer'sneeds?

Options:

A.

Xi

B.

Beam

C.

Calm

D.

Prism Pro

Buy Now
Questions 56

During a sales motion with a new prospect, the prospect asks to do a POC so they can experience Nutanix in their environment.

What is the most important item the SE must have in place with the prospect before moving forward with a POC?

Options:

A.

Start date of the POC

B.

Defined and measurable success criteria

C.

Meeting frequency

D.

Number of Nodes/Block to be used during the POC

Buy Now
Questions 57

A systems engineer is creating a workload for a Sizer Scenario that requires Disaster Recovery (DR) resources with a Recovery Point Objective (RPO) of 6 hours. The "Protect VMs and other Entities" setting is set to Yes. Async is selected for the RPO. Which two other options must be enabled to have Sizer create a DR cluster? (Choose two)

Options:

A.

Disaster Recovery

B.

Backup

C.

Remote Snapshot

D.

NearSync

Buy Now
Questions 58

Refer to the exhibit.

NCSE-Core Question 58

A prospect provides the data shown captured from their existing environment using RVTools. The prospect has additional historical CPU utilization data that indicates peak CPU utilization never exceeds 50% on either physical host.

Which vCPU:pCore ratio should be used in Sizer?

Options:

A.

2:1

B.

3:1

C.

4:1

D.

5:1

Buy Now
Questions 59

An SE is conducting a first call presentation with their Account Executive and a prospect. The prospect needs to build a private cloud but has been unable to implement the solution in-house, since using their traditional architecture would require integrating server, storage and networking solutions from six different vendors.

The cost and complexity of that approach is too high. Also their current infrastructure is not built for scalability or performance.

The prospect has considered upgrading their traditional server and SAN storage platforms but could not meet requirements for scale and performance using this approach.

In what order should the SE present the critical product and technology portions of the First Customer Presentation to the IT Director?

Options:

A.

Native convergence of traditional infrastructure.

Scalable distributed system.

Data locality and distributed data.

Application automation with Calm.

Xi Cloud Services.

B.

Application automation with Calm.

Xi Cloud Services.

Native convergence of traditional infrastructure.

Scalable distributed system.

Data locality and distributed data.

C.

Xi Cloud Services.

Application automation with Calm.

Native convergence of traditional infrastructure.

Scalable distributed system.

Data locality and distributed data.

D.

Data locality and distributed data.

Scalable distributed system.

Native convergence of traditional infrastructure.

Xi Cloud Services.

Application automation with Calm.

Buy Now
Exam Code: NCSE-Core
Exam Name: Nutanix Certified Systems Engineer-Core (NCSE-Core 6.8)
Last Update: May 16, 2026
Questions: 198

PDF + Testing Engine

$63.52  $181.49

Testing Engine

$50.57  $144.49
buy now NCSE-Core testing engine

PDF (Q&A)

$43.57  $124.49
buy now NCSE-Core pdf