Project-Planning-Design ARE 5.0 Project Planning & Design (PPD) Questions and Answers

Questions 4

A 100,000-square-foot distribution warehouse has roof drains around the perimeter.

Which combination of structure and roofing system insulation is most cost effective?

Options:

A.

Level rigid frame with tapered rigid insulation

B.

Sloped rigid frame with rigid insulation

C.

Level open web joists with tapered rigid insulation

D.

Sloped open web joists with rigid insulation

Buy Now
Questions 5

The rehabilitation of a warehouse for a commercial occupancy has a heavy anticipated electrical distribution load and it is expected that the current of the electrical system will be expanded in the near future.

The least expensive and most flexible electrical distribution system would be comprised of which one of the following?

Options:

A.

Paralleled sets of aluminum wire in conduits

B.

Paralleled sets of copper wire in conduits

C.

Single large aluminum or copper conductor

D.

Aluminum or copper bus duct with tap boxes

Buy Now
Questions 6

Program requirements for a hospital with a clear span of 70 feet include minimal disruption of the hospital routine for future mechanical and electrical repairs and alterations and a maximum economical flexibility of the structure.

Which of the following structural systems is most appropriate?

Options:

A.

Interstitial trusses

B.

Plate girders

C.

Composite floor beams

D.

Precast concrete planks

Buy Now
Questions 7

To reduce embodied energy in a 500-unit redevelopment, the architect should create a strategy to include which of the following? Check the three that apply.

Options:

A.

Re-use existing buildings and structures wherever possible

B.

Orient the building to create transitional spaces within the development

C.

Construct buildings and infrastructure from local and low-energy materials where possible

D.

Decrease the percentage of high-rise units

E.

Increase the percentage of single-story units

F.

Use simple geometric structures

Buy Now
Questions 8

An elementary school requires a renovation, selective demolition, and a major addition in order to accommodate a growing student population. An architectural firm has prepared schematic design plans incorporating the school's increased programmatic needs, including an enlarged library, cafeteria, and gymnasium; a secure courtyard; and additional space for administrative offices and classrooms. The main entrance was relocated in order to improve the traffic and pedestrian flow at the beginning and end of the school day, and additional parking was provided to comply with current zoning requirements.

The existing single-story masonry building was built in 1950. Two small additions were built later: the north addition will be kept and repurposed, but the south addition will be demolished. The building contains asbestos and lead in roof soffits, floor tiles, pipe insulation, and window paint. All existing mechanical systems need to be replaced; new systems have not been selected.

Considerations for the renovation include:

•The relocated front entrance must be easily recognizable, highly visible, and secure.

•Interior and exterior materials need to be durable and maintainable in order to withstand frequent student abuse, but also economical due to strict budget limitations.

•Good indoor air quality and increased energy efficiency are priorities for the selection of mechanical equipment.

After completion, the entire school should look uniform, without a distinctive difference between the existing building and new addition.

Building information:

•Construction Type is II-B.

The following resources are available for your reference:

•Existing Plans, including site and floor plans

•Proposed Plans, including site and floor plans

•Cost Analysis

•Zoning Ordinance Excerpts, for off-street parking requirements

•IBC Excerpts, showing relevant code sections

•ADA Standards Excerpts, showing relevant sections from the ADA Standards for Accessible Design

An elementary school library has an occupancy load of 150.

What is the minimum clear opening width required?

Options:

A.

30"

B.

32"

C.

36"

Buy Now
Questions 9

Which of the following need to be considered to enhance the acoustic design of an office building? Check the four that apply.

Options:

A.

Location of noise-sensitive areas relative to noise-producing elements

B.

Type of the structural floor system construction between floors

C.

Minimize the use of steel stud framing and gypsum board for interior partitions

D.

Use of exterior natural or constructed barriers to reduce impact from external noise sources, absorption, and increase reverberation times

E.

Acoustical properties of interior floor, wall, and ceiling finish materials

F.

Selection of interior finish treatments that will decrease sound absorption

Buy Now
Questions 10

Project-Planning-Design Question 10

Refer to the exhibit (photo showing diagonal cracks in a wall).

The structural damage evident in the photograph illustrates a classic example of failure due to which of the following?

Options:

A.

Overturning

B.

In-plane shear

C.

Excessive diaphragm flexure

Buy Now
Questions 11

The use of a central computer system to monitor a building's heating and cooling demands will do which one of the following?

Options:

A.

Eliminate the use of a facility manager

B.

Interactively select the least energy-intensive system or combination of systems

C.

Increase the cost of energy consumption

D.

Be primarily for solar-heating and natural-cooling systems

Buy Now
Questions 12

An architect is designing overhangs for a building on a site in the southeastern United States. The architect desires to minimize heat gain during the summer months.

Click in the sun on the solar path diagram that the architect should consider when designing the overhangs.

Project-Planning-Design Question 12

Options:

Buy Now
Questions 13

Click on the area of the concrete beam elevation where steel reinforcing will most improve the beam's span capability.

Project-Planning-Design Question 13

Options:

Buy Now
Questions 14

An architect has just received client approval of the Schematic Design documents for a three-story, outpatient medical clinic. The clinic is located within a mixed-use development governed by

a City-approved Planned Development (PD) document. The medical clinic design utilizes standardized departmental layouts and includes outpatient clinics, as well as treatment spaces,

administrative spaces and public/lobby spaces.

The site needs to accommodate four different vehicular traffic flows: patient traffic, staff traffic, service and delivery traffic, and emergency services traffic. In addition, a pedestrian plaza

must connect to the mixed-use development sidewalks. The plaza must provide space for bicycle parking and will serve as the future bus stop.

The site design addresses several challenges related to building orientation. The southeast facade, with excellent visibility from the highway, is the location of all service equipment. The

building entrance faces northwest, convenient to the parking but not visible from the highway.

The client believes future patient volumes will outgrow the clinic. The PD document allows for a planned Phase 2 development on the adjacent vacant site to the southwest. Phase 2 would

include a second building (2 story, 80,000 BGSF) and/or a parking deck.

Other considerations for the project include:

    Protected tree requirements are defined in the PD document.

    Easy pedestrian access must be provided from Sycamore Boulevard.

    All required parking for the clinic must be accommodated on site.

    Programmed area includes 109,450 Departmental Gross Square Feet (DGSF) / 130,184 Building Gross Square Feet (BGSF).

    Exterior material percentages are dictated by the PD document and shall not exceed specific percentages for Primary and Secondary Finishes.

    All service equipment needs to be screened; see PD document for restrictions.

    Signage opportunities are important to the client.

    Acoustical privacy is a concern of the healthcare system.

The following resources are available for your reference:

    Drawings, including a perspective, plans, and exterior elevations

    Building Program, including client's departmental program and detailed program for Treatment 01 (Infusion)

    Exterior Material Cost Comparisons

    Planned Development Document

    IBC Excerpts, showing relevant code sections

    ADA Excerpts, showing relevant sections from the ADA Standards for Accessible Design

The architect and civil engineer are coordinating the design of the proposed pedestrian plaza fronting along Sycamore Boulevard and reviewing estimates for the cost of street trees. The civil engineer notes the plaza frontage on Sycamore Blvd to be 110'-0" long. Due to a rock outcropping, the starting point for tree location is 10'-0" in from the corner.

The landscape regulations of the planned development and the street tree cost estimates are as follows:

    'Cathedral' Live Oak: $250 per tree

    Allee Elm: $200 per tree

    American Holly: $125 per tree

What is the minimum cost for street trees along the frontage described?

Options:

A.

$1,000

B.

$1,600

C.

$2,000

Buy Now
Questions 15

Which of the following roofing types is the most appropriate for installation during below-freezing weather conditions on a roof with less than a 2:12 slope?

Options:

A.

A cold-tar built-up roof

B.

A self-sealing shingle roof

C.

A ballasted EPDM roof

Buy Now
Questions 16

Project-Planning-Design Question 16

Refer to the exhibit (graph of moving walkway speed vs. nominal passengers per hour).

Based on the graphic shown, which of the following moving walkway speeds will deliver 4,500 passengers per hour utilizing a single lane?

Options:

A.

110 ft per minute

B.

130 ft per minute

C.

150 ft per minute

D.

170 ft per minute

Buy Now
Questions 17

Project-Planning-Design Question 17

Refer to the exhibit (building subjected to wind with force diagrams A, B, C, D).

Which of the force diagrams shown correctly represents the resultant wind forces causing an overturning effect on the building and the forces that resist this overturning effect? (Direction and point of application of forces are to be considered; magnitude of forces is not.)

Options:

A.

A

B.

B

C.

C

D.

D

Buy Now
Questions 18

The architect's greatest contribution to good seismic design is in the design of which of the following?

Options:

A.

Structural components and connections

B.

Building's interior partition arrangement

C.

Building's plan and cross-sectional configuration

D.

Site location and building orientation

Buy Now
Questions 19

Refer to the exhibit (multi-use building with apartments, offices, stores, parking).

Project-Planning-Design Question 19

The multipurpose building shown is located in a cold-winter, mild-summer climate.

Which of the following is the best location for the mechanical equipment floor?

Options:

A.

Parking level

B.

Store level

C.

Between the office and apartment levels

D.

Top floor

Buy Now
Questions 20

An elementary school requires a renovation, selective demolition, and a major addition in order to accommodate a growing student population. An architectural firm has prepared schematic design plans incorporating the school's increased programmatic needs, including an enlarged library, cafeteria, and gymnasium; a secure courtyard; and additional space for administrative offices and classrooms. The main entrance was relocated in order to improve the traffic and pedestrian flow at the beginning and end of the school day, and additional parking was provided to comply with current zoning requirements.

The existing single-story masonry building was built in 1950. Two small additions were built later: the north addition will be kept and repurposed, but the south addition will be demolished. The building contains asbestos and lead in roof soffits, floor tiles, pipe insulation, and window paint. All existing mechanical systems need to be replaced; new systems have not been selected.

Considerations for the renovation include:

•The relocated front entrance must be easily recognizable, highly visible, and secure.

•Interior and exterior materials need to be durable and maintainable in order to withstand frequent student abuse, but also economical due to strict budget limitations.

•Good indoor air quality and increased energy efficiency are priorities for the selection of mechanical equipment.

After completion, the entire school should look uniform, without a distinctive difference between the existing building and new addition.

Building information:

•Construction Type is II-B.

The following resources are available for your reference:

•Existing Plans, including site and floor plans

•Proposed Plans, including site and floor plans

•Cost Analysis

•Zoning Ordinance Excerpts, for off-street parking requirements

•IBC Excerpts, showing relevant code sections

•ADA Standards Excerpts, showing relevant sections from the ADA Standards for Accessible Design

The project team decides to cover the roof area above the gymnasium and platform with 350 watt, stationary, photovoltaic (PV) panels. Each panel requires 20 square feet, accounting for access aisles and safety clearances. The PV system will be tied to the local power company's electrical grid, and will not have battery storage. The school is located in a region that gets an average of 4 usable hours of sunlight per day.

Which of the following PV system design considerations apply to this project? Check the three that apply.

Refer to the project involving an elementary school renovation and addition with photovoltaic (PV) panels on the gymnasium roof (350-watt panels, 20 sq ft each, ~4 usable sunlight hours/day). The PV system is grid-tied without battery storage.

Which of the following PV system design considerations apply? Check the three that apply.

Options:

A.

The PV system will provide emergency power for the school if the grid goes down.

B.

The gymnasium and platform structural system must be designed to support the load of the PV system.

C.

The PV system will be made up of approximately 273 panels.

D.

The PV system will reduce the need for artificial lighting in the gymnasium and platform areas.

E.

The PV panels should be mounted toward the student pick-up/drop-off.

F.

The PV system will produce approximately 95.5 kW during peak sun conditions.

Buy Now
Questions 21

Which of the following types of heating system would be appropriate when the design requires a very compact system that has a low initial cost, is easily zoned, and has a quick response to temperature changes?

Options:

A.

Electric

B.

Hydronic

C.

Forced air

D.

Combination forced air/hydronic

Buy Now
Questions 22

A site has been engineered with a 1:20 grade.

Which of the following sidewalk designs would be the most cost-effective way to get from the top to the bottom and still be in compliance with the accessibility standards?

Options:

A.

Switchback ramps at 1:12 with a handrail

B.

Cutting diagonally across the slope at 1:10 with a handrail

C.

Cutting diagonally across the slope at 1:12 with no handrail

D.

At the same grade as the slope with no handrail

Buy Now
Questions 23

If evaluating on a life-cycle basis, which of the following effects is the major reason for using native or adapted plantings on-site?

Options:

A.

Reduction in irrigation water and fertilizer

B.

Reduction in root adaptation time period

C.

Reduction in transplantation costs

Buy Now
Questions 24

In high-rise building construction, which advantages does the use of composite floor decking offer over the use of flat plates? Check the four that apply.

Options:

A.

Composite decks provide positive reinforcement for concrete slabs.

B.

Shear connectors are not required between the concrete and the beams below.

C.

Metal decks provide a working platform, eliminating the need for wood planking.

D.

Composite decks serve as forms for concrete, eliminating the need for forming and stripping.

E.

Lightweight concrete may be used to reduce dead weight of the structure.

F.

Steel construction provides decreased sound transmission compared to flat plate systems.

Buy Now
Questions 25

Project-Planning-Design Question 25

Refer to the exhibit (site designs A through D with tree and shrub placement and prevailing northwest winds indicated).

Which of the following site designs would best protect the structure from prevailing northwest winds?

Options:

A.

Site Design A

B.

Site Design B

C.

Site Design C

D.

Site Design D

Buy Now
Questions 26

An elementary school requires a renovation, selective demolition, and a major addition in order to accommodate a growing student population. An architectural firm has prepared schematic design plans incorporating the school's increased programmatic needs, including an enlarged library, cafeteria, and gymnasium; a secure courtyard; and additional space for administrative offices and classrooms. The main entrance was relocated in order to improve the traffic and pedestrian flow at the beginning and end of the school day, and additional parking was provided to comply with current zoning requirements.

The existing single-story masonry building was built in 1950. Two small additions were built later: the north addition will be kept and repurposed, but the south addition will be demolished. The building contains asbestos and lead in roof soffits, floor tiles, pipe insulation, and window paint. All existing mechanical systems need to be replaced; new systems have not been selected.

Considerations for the renovation include:

    The relocated front entrance must be easily recognizable, highly visible, and secure.

    Interior and exterior materials need to be durable and maintainable in order to withstand frequent student abuse, but also economical due to strict budget limitations.

    Good indoor air quality and increased energy efficiency are priorities for the selection of mechanical equipment.

After completion, the entire school should look uniform, without a distinctive difference between the existing building and new addition.

Building information:

    Construction Type is II-B.

The following resources are available for your reference:

    Existing Plans, including site and floor plans

    Proposed Plans, including site and floor plans

    Cost Analysis

    Zoning Ordinance Excerpts, for off-street parking requirements

    IBC Excerpts, showing relevant code sections

    ADA Standards Excerpts, showing relevant sections from the ADA Standards for Accessible Design

Which of the following is the maximum height the platform can be above the gymnasium floor per the proposed design?

Options:

A.

2'-6"

B.

1'-9"

C.

1'-6"

Buy Now
Questions 27

An architect is selecting a mechanical system for the first floor of a hotel in a temperate climate. They must consider the following:

• The building footprint covers 95% of the small urban site.

• The first floor has an open floor plan that includes a lobby, bar, and restaurant.

• The plan can only accommodate one 500 sf mechanical room.

What mechanical system should the architect recommend?

Options:

A.

Geothermal heat pump

B.

Packaged terminal air conditioners

C.

Variable refrigerant flow system

Buy Now
Questions 28

In the design of a project, the architect should do which of the following in order to respond to the requirements imposed by governmental authorities that have jurisdiction over the project?

Options:

A.

Implement a code search checklist to capture key design code information.

B.

Implement a staff training program that will guarantee compliance with all applicable codes.

C.

Include a provision in the construction contract that delegates code compliance to the contractor.

D.

Include a provision in the architect's contract with the owner that ensures compliance with all applicable codes.

Buy Now
Questions 29

Project-Planning-Design Question 29

Refer to the exhibit (table showing energy embodied and annual energy demand for Type L and Type H walls).

In the table, Type L wall is lightly insulated and Type H wall is heavily insulated. Approximately how many heating seasons would it take to recover the extra energy involved in selecting the Type H construction?

Options:

A.

One-third of a heating season

B.

Two-thirds of a heating season

C.

Two heating seasons

D.

Three heating seasons

Buy Now
Questions 30

An architect is designing an office building on an infill lot. The client wants to look at site design strategies to prevent erosion and collection of excess surface water resulting from the new construction.

Which one of the following strategies directly addresses the client's requirement?

Options:

A.

Install pervious paving

B.

Install a catchment area

C.

Install horizontal overhangs

Buy Now
Exam Name: ARE 5.0 Project Planning & Design (PPD)
Last Update: Aug 9, 2025
Questions: 100

PDF + Testing Engine

$63.52  $181.49

Testing Engine

$50.57  $144.49
buy now Project-Planning-Design testing engine

PDF (Q&A)

$43.57  $124.49
buy now Project-Planning-Design pdf