What is an arc-flash boundary?

Options:

A.

The approach limit distance within which inadvertent movement exposes personnel to increase ris due to electrical arc-over potential.

B.

The approach limit distance from energized electrical equipment within which a person is considered to be exposed to full circuit voltage.

C.

The approach limit distance within which a person could receive a second-degree burn in the event that an electrical arc flash were to occur

D.

The distance within which qualified personnel can safely perform bare-handed work on exposed energized electrical equipment operating at 50 volts or more.

Buy Now
Questions 5

Which of the following voltages should be included on the dc disconnected label to indicate MAXIMUM system voltage?

Options:

A.

Temperature-corrected V

B.

Non-temperature-corrected V

C.

Source circuit V

D.

600 V

Buy Now
Questions 6

A 15 kW system has a total derate factor of 0.90. After 5 years, output drops by 2% annually due to degradation. What is the AC output in year 5?

Options:

A.

11.5 kW

B.

12.2 kW

C.

12.9 kW

D.

13.5 kW

Buy Now
Questions 7

An installer is sizing conductors for a 200-foot PV source circuit with a current of 8A at 400V DC. The design specifies a 1.5% voltage drop using copper wire at 30°C. What is the minimum wire size required?

Options:

A.

12 AWG

B.

10 AWG

C.

8 AWG

D.

6 AWG

Buy Now
Questions 8

According to the 2020 National Electrical Code (NEC), what is the minimum required working clearance in front of a 1000V DC PV inverter installed in a non-dwelling unit?

Options:

A.

30 inches wide, 36 inches deep

B.

36 inches wide, 36 inches deep

C.

36 inches wide, 48 inches deep

D.

48 inches wide, 48 inches deep

Buy Now
Questions 9

A PV system equipped with rapid shutdown requires a label stating ‘’RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM’’.

Which is the BEST description of where this label is required?

Options:

A.

On or within 3 ft. of the ac disconnect

B.

On or within 3 ft. of the ac disconnect

C.

On or within 3 ft. of the ac disconnect

D.

On or within 3 ft. of the ac disconnect

Buy Now
Questions 10

A PV module has a NOCT of 47°C. At 1000 W/m² and 35°C ambient, what is the cell temperature?

Options:

A.

47°C

B.

55°C

C.

59°C

D.

63°C

Buy Now
Questions 11

A 15 kW array has a PR of 0.88 and 1600 kWh/m²/year insolation. What is the annual output?

Options:

A.

19,800 kWh

B.

21,120 kWh

C.

22,440 kWh

D.

24,000 kWh

Buy Now
Questions 12

A PV array’s tilt is 15° at a latitude of 35°N. What is the annual energy loss compared to optimal tilt?

Options:

A.

1-2%

B.

3-5%

C.

6-8%

D.

10-12%

Buy Now
Questions 13

Per NEC 690.4, who is qualified to install a PV system?

Options:

A.

Anyone with basic electrical knowledge

B.

A licensed electrician or supervised trainee

C.

Only a NABCEP-certified installer

D.

A journeyman with PV experience

Buy Now
Questions 14

A technician has been called to a scale due to a low-performing array. The technician will perform tests in the 24-source circuit combiner box. After putting on the correct PPE and turning off and performing lock.tagout of the inverted and combiner disconnect. Which is the next step to safely begin electrical testing in the combiner box?

Options:

A.

Open all fuse holders in the combiner box.

B.

Test for voltage on the positive out

C.

Remove any surge suppression devices from the circuits.

D.

Test for current on each source circuit coming into the combiner box.

Buy Now
Questions 15

A PV system is designed with a 48V battery bank and a 5 kW inverter. The load requires 20 kWh/day, and the system must have 2 days of autonomy with a maximum depth of discharge (DoD) of 50%. What is the minimum battery capacity required in Ah?

Options:

A.

417 Ah

B.

833 Ah

C.

1000 Ah

D.

1667 Ah

Buy Now
Questions 16

A PV system operates at 800V DC. What is the minimum distance for unqualified personnel per NFPA 70E restricted approach boundary?

Options:

A.

1 foot

B.

3 feet

C.

7 feet

D.

10 feet

Buy Now
Questions 17

A PV system interconnects at a 480V three-phase service. The inverter output current is 20A per phase. What is the minimum size of the equipment grounding conductor (EGC) per NEC 250.122 if the OCPD is 30A?

Options:

A.

14 AWG

B.

12 AWG

C.

10 AWG

D.

8 AWG

Buy Now
Questions 18

A PV module shows burn marks near the junction box. What is the most likely cause?

Options:

A.

Overcurrent condition

B.

Ground fault

C.

Loose connection

D.

Lightning strike

Buy Now
Questions 19

A PV array is installed with a rapid shutdown system per NEC 690.12. The array is 15 feet from the service entrance. What is the maximum voltage allowed within the array boundary 30 seconds after shutdown initiation?

Options:

A.

30V

B.

80V

C.

120V

D.

240V

Buy Now
Questions 20

How should stratification be eliminated in a set of large, stationary, stationary flooded lead-acid batteries?

Options:

A.

Rotate the battery positions

B.

Add 50% diluted sulfuric acid.

C.

Enable equalization.

D.

Discharge to 80 depth of discharge.

Buy Now
Questions 21

A PV system designer is selecting an inverter for a 12 kW array with a maximum power point voltage range of 300-450V DC. Which inverter specification is most critical to verify compatibility?

Options:

A.

Maximum AC output current

B.

Inverter efficiency rating

C.

DC input voltage operating range

D.

Nominal AC output voltage

Buy Now
Questions 22

A ground-mount array uses driven piles with a lateral load capacity of 500 lbs. The wind load calculation yields a lateral force of 600 lbs per pile. What must be done?

Options:

A.

Increase pile depth

B.

Add additional piles

C.

Use a different foundation type

D.

Any of the above

Buy Now
Questions 23

A site has a known magnetic declination of 14 west. What should the corrected azimuth reading of the array be in order to be facing true south?

Options:

A.

270

B.

194

C.

180

D.

166

Buy Now
Questions 24

A PV system’s inverter displays a ground-fault error. What is the first troubleshooting step?

Options:

A.

Replace the inverter

B.

Check array insulation resistance

C.

Verify DC disconnect operation

D.

Inspect AC wiring

Buy Now
Questions 25

What is the maximum allowable voltage drop for a PV source circuit conductor run of 100 feet, using 10 AWG copper wire, if the system operates at 48V DC and the design specifies a 2% voltage drop?

Options:

A.

0.48V

B.

0.96V

C.

1.44V

D.

1.92V

Buy Now
Questions 26

A commercial 600v carport-mounted PV system is installed with rigid running under the parking lot to an inverter pad located at the edge of the parking lot. At what depth below the parking lot base MUST condult be buried?

Options:

A.

12 in.

B.

18 in.

C.

24 in.

D.

36 in.

Buy Now
Questions 27

A bank of batteries with capability of supplying 250A and a maximum voltage of 325V is housed in a concrete structure in a very humid location. There is service access alsie between rows of batteries. What is the REQUIRED safety distance between the rows of batteries.

Options:

A.

3 ft. when insulted conducted conductors are used between terminals.

B.

3-1/2 If the building is equipped with a dehumidifier and the batteries are on insulting surfaces

C.

4 ft Whether or not the building is equipped with a dehumidifier or the batteries are insulting surfaces

D.

6 ft. When the floor is insulated and no dehumidifier is installed.

Buy Now
Questions 28

A bifacial array gains 15% additional power from rear-side irradiance. If the front-side output is 10 kW, what is the total output?

Options:

A.

11.0 kW

B.

11.5 kW

C.

12.0 kW

D.

12.5 kW

Buy Now
Questions 29

Which of the following MUST be referenced for determining a site’s design wind speed?

Options:

A.

The NEC version in effect

B.

The jurisdiction’s local building code in effect

C.

The ASHRAE Handbook_fundamentals in effect

D.

The module manufacture’s design wind speed

Buy Now
Questions 30

A PV system was installed in July 2017 under the 2017 NEC. The system has a string inverter located inside a garage on a wall 10 ft, from the outside wall and 1oft, from the ac load center at the point of utility connection. The PV system has a PV array on the roof. Which of the following represents the PV rapid shutdown system requirement for the controlled PV system conductors associated with this PV array?

Options:

A.

Within the array boundary and more than 3.ft from the point of entry of the building.

B.

More than 1 ft, from the PV array or more than 3 ft, from the point of entry of the building.

C.

More than 1 ft, from the VP array and more than 5 ft. In length the building.

D.

More than 10ft, from the PV array or more than 5 ft. in length inside the building

Buy Now
Questions 31

A PV system has a 1000V DC array feeding a transformerless inverter. What is the minimum insulation rating for the DC conductors per NEC 690.35?

Options:

A.

600V

B.

1000V

C.

1500V

D.

2000V

Buy Now
Questions 32

A PV system produces 12,000 kWh annually at a site with 1500 kWh/m²/year insolation. The array area is 50 m². What is the system efficiency?

Options:

A.

12%

B.

14%

C.

16%

D.

18%

Buy Now
Questions 33

A project is using a PV module with a 25-38dc maximum power voltage range and a single input inverter with an operating windows of 250vdc-450dc. The dwelling the system is to be installed on has a 5:12 roof with a southeastem face that can accommodate 14 modules and southwestern face that can accommodate 10 modules. What is the MAXIMUM number of modules that can be installed for proper inverter maximum power point tracking?

Options:

A.

14

B.

18

C.

20

D.

24

Buy Now
Questions 34

A homeowner is weighing the PV module options for a roof-mounted solar array. Which is a correct option to present to the homeowner?

Options:

A.

Building-integrated PV shingles will be flush or nearly flush with other shingles, but the electrical energy produced will be less than polycrystalline or monocrystalline modules.

B.

Rapid shutdown requirements within 1 ft of the array boundary.

C.

Polycrystalline modules are more shade-tolerance than either amorphous or monocrystalline modules and allow a larger array to be installed, including in area where shading could be seasonally problematic.

D.

Microinverters can be installed with either polycrystalline or monocrystalline modules, negating the need for rapid shutdown compliance.

Buy Now
Questions 35

Which electrical connection requires the use of a torque device to complete the connection per NEC requirements?

Options:

A.

Crimp-on log to the battery cable

B.

Screw terminals on an ac receptacle outlet

C.

Underground direct-burial twist-on wire connector

D.

Soldered splices in a conduit body

Buy Now
Questions 36

A ground-mount PV system is planned for a site with a soil bearing capacity of 2000 psf. The array footing design requires a minimum bearing pressure of 1500 psf. What is the safety factor for this installation?

Options:

A.

0.75

B.

1.33

C.

1.5

D.

2.0

Buy Now
Questions 37

A module’s STC power is 300W, with a temperature coefficient of -0.40%/°C. At 65°C, what is the power loss percentage?

Options:

A.

12%

B.

14%

C.

16%

D.

18%

Buy Now
Questions 38

A metal condult containing an array circuit with Vmo of 400Vdc is connected to a metal enclosure at the location where the concentric knockouts have been punched by the manufacturer. Which method of attachment should be used?

Options:

A.

Grounding bushing

B.

Insulated bushing

C.

Sealing locknut

D.

Threaded coupling

Buy Now
Questions 39

A grid-interactive PV system with battery backup is being installed with a ground-mounted PV array located 200 ft, from the inverter and batteries. The dc PV output circuit has overcuit has overcurrent protection rated from 30A. To reduce voltage drop between the array and batteries, the output circuit wire size was determined to be 6 AWG. The fused dc disconnect between the inverted and batteries is rated for 300A. What is the required size of the equipment grounding conductor between the metal battery case and the inverter?

Options:

A.

10 AWG

B.

8 AWG

C.

6 AWG

D.

4 AWG

Buy Now
Questions 40

A ground-fault protection device (GFPD) trips during commissioning. What is the most likely cause per NEC 690.5?

Options:

A.

Open circuit in the array

B.

Reverse polarity in a source circuit

C.

Insulation failure between a conductor and ground

D.

Overcurrent in the inverter output

Buy Now
Questions 41

A PV system is installed in a location with an average annual ambient temperature of 30°C. If the module’s NOCT (Nominal Operating Cell Temperature) is 45°C, what is the expected cell temperature under standard operating conditions (800 W/m² irradiance)?

Options:

A.

45°C

B.

50°C

C.

55°C

D.

60°C

Buy Now
Questions 42

When commissioning a PV system, which test is most critical to verify proper operation of the array before connecting to the inverter?

Options:

A.

Insulation resistance test

B.

Open-circuit voltage test

C.

Short-circuit current test

D.

Ground-fault detection test

Buy Now
Questions 43

A PV technician is installing a 6.5KWac inverter using a 40A backfed breaker. The single line shows a 200A panelboard with a 200A breaker, but the installer finds that the panelbord actually has a 150A main breaker. Which of the following is the CORRECT installation option?

Options:

A.

Replace the 200A panel with a 150A panel.

B.

Install a 30A backfed circuit breaker.

C.

Change the main circuit breaker to a 200A unit.

D.

Complete the installation as noted above.

Buy Now
Questions 44

A PV system requires labeling per NEC 690.56. Which of the following must be posted at the point of interconnection?

Options:

A.

"PV System Disconnect"

B.

"Warning: Dual Power Sources"

C.

"Maximum AC Voltage"

D.

"Do Not Disconnect Under Load"

Buy Now
Questions 45

According to the NEC, where on a residential PV system MUST the labeling describing the type of rapid shutdown be located?

Options:

A.

On the rapid shutdown initiation device.

B.

On or no more than 1 m (3. 3 ft) from the service disconnecting meant

C.

At point on the residence designated by the AKJ and fire marshal

D.

A close as practicable to the PV array requiring rapid shutdown

Buy Now
Questions 46

A 20 kW array has a measured output of 16 kW at 800 W/m² irradiance. What is the performance loss due to irradiance?

Options:

A.

10%

B.

20%

C.

25%

D.

30%

Buy Now
Questions 47

An installer is terminating PV conductors in a combiner box. What is the minimum torque specification for a 10 AWG connection if not specified by the manufacturer?

Options:

A.

10 in-lb

B.

20 in-lb

C.

30 in-lb

D.

40 in-lb

Buy Now
Questions 48

An installer troubleshooting a ground-mounted array finds It to be performing as expected most of the time, but a ground-fault error is indicated on hot days. The inverter is in a shaded location. Which of the following should the installer check for FIRST when troubleshooting this array?

Options:

A.

High voltage

B.

Loose module connections

C.

Pinched module wiring

D.

Intermittent ground connections

Buy Now
Exam Code: PVIP
Exam Name: PV Installation Professional (PVIP) Board Certification
Last Update: Apr 30, 2026
Questions: 160

PDF + Testing Engine

$322.48  $921.36

Testing Engine

$322.48  $921.36
buy now PVIP testing engine

PDF (Q&A)

$322.48  $921.36
buy now PVIP pdf