SAFe-RTE SAFe Release Train Engineer (RTE 6.0) Questions and Answers

Questions 4

Who can the Release Train Engineer work with to help eliminate policies and procedures that demotivate employees?

Options:

A.

Business Owners

B.

Lean-Agile Leaders

C.

Portfolio Managers

D.

Product Management

Buy Now
Questions 5

What promotes alignment between the business owners and product management?

Options:

A.

Quantification of transaction and holding costs

B.

Epics supported by Lean Business Cases

C.

Prioritized Program Backlog

D.

Applying cadence and synchronization

Buy Now
Questions 6

Which statement is true about SAFe Iteration Goals?

Options:

A.

They describe the value of planned Features and Enablers

B.

They provide key performance indicators (KPIs) for tracking progress and value realization

C.

They enable teams to keep aligned with PI Objectives

D.

They provide quantifiable metrics to be used in retrospectives

Buy Now
Questions 7

(What should be measured in a CALMR approach to DevOps?)

Options:

A.

Net Promoter Score (NPS)

B.

Flow through the pipeline

C.

Objectives and Key Results (OKRs)

D.

Code coverage

Buy Now
Questions 8

What is the Scrum Master ' s role in team breakout #1?

Options:

A.

Create mitigation plans for each risk

B.

Resolve dependencies with other teams

C.

Raise team level risks

D.

Facilitate the coordination with other teams for dependencies

Buy Now
Questions 9

When does the Plan-Do-Check-Adjust cycle occur in scrum?

Options:

A.

As part of the lteration retrospective

B.

In the daily stand-up

C.

At the lteration review

D.

A cross all scrum events

Buy Now
Questions 10

When planning for a distributed Program Increment (PI) Planning event with a large dif-ference in time zones, what are two key preparation and facilitation focus areas for a Re-lease Train Engineer (RTE)? (Choose two.)

Options:

A.

Share the outcomes of preparation meetings with local Scrum Masters so they can arrange local rooms

B.

Have a single RTE and technical support person that acts as a central point of communication for all locations

C.

Adjust the PI agenda to 2.5 – 3 days, allowing for overlapping hours

D.

Split up the PI Planning event per time zone and then have the final plan review, confidence vote, and planning retrospective as one centralized meeting

E.

Arrange and test presentation audio and video connectivity in all locations

Buy Now
Questions 11

The team is struggling to agree on the Story point sizing of a new User Story. The Prod-uct Owner was previously a related domain expert and feels the team is wasting time. What should she do?

Options:

A.

Instruct the Scrum Master to resize the Story

B.

Continue to support the team ' s decision on sizing

C.

Suggest the team stop the sizing of the User Story and add it to the next lteration as-is

Buy Now
Questions 12

Which SAFe Principle is being applied when a Release Train Engineer treats Suppliers as partners?

Options:

A.

Build incrementally with fast, integrated learning cycles

B.

Assume variability; preserve options

C.

Decentralize decision-making

D.

Apply systems thinking

Buy Now
Questions 13

Becoming a coach requires a shift from old behaviors to new ones. What are three ex-amples of old behaviors? (Choose three.)

Options:

A.

Focusing on deadlines

B.

Fixing problems for the team

C.

Driving toward specific outcomes

D.

Asking the team for the answers

E.

Facilitating team problem solving

F.

Focusing on business value delivery

Buy Now
Questions 14

Scrum Masters are effective by using scrum methods, supporting SAFe principles and practices, and what else?

Options:

A.

Managing architectural runway

B.

Serving as a customer proxy

C.

Writing stories and enablers

D.

Supporting delivery using Agile practices

Buy Now
Questions 15

What is included in the Inspect and Adapt agenda?

Options:

A.

Program backlog refinement

B.

System Demo

C.

Quantitative and qualitative measurement

Buy Now
Questions 16

The goal of Lean is to deliver the maximum customer value in the shortest sustainable lead time while providing what else?

Options:

A.

The highest possible quality

B.

A Continuous Delivery Pipeline

C.

Significant team contributions

D.

Improved capacity allocation

Buy Now
Questions 17

What is the only true objective measure of an Agile Release Train?

Options:

A.

System Demo

B.

Scrum of scrums

C.

Cumulative flow diagram

D.

Team status report

Buy Now
Questions 18

Which event facilitated by the Release Train Engineer is designed to keep the Agile Re-lease Train on the tracks?

Options:

A.

Daily stand-up

B.

Iteration review

C.

Solution Demo

D.

Scrum of scrums

Buy Now
Questions 19

Which statement is true about estimating Features using Story points?

Options:

A.

More than one team may be involved in the estimation

B.

T-shirt sizing is the best way to estimate features

C.

Feature estimation is performed solely by Product Managers

Buy Now
Questions 20

What should the Release Train Engineer do during the final plan review on Day two of Program Increment (PI) Planning?

Options:

A.

Encourage discussion of each team ' s product Vision as part of the final plan re-view

B.

Verify that each team ' s uncommitted objectives have lower business value than the committed PI Objectives in order to reflect proper prioritization

C.

Facilitate the ROAMing of each team ' s risks

D.

Facilitate all teams when they are presenting their final plans to the entire Agile Release Train

Buy Now
Questions 21

What are two common PI Planning anti-patterns? (Choose two.)

Options:

A.

Stories are created for the Iterations

B.

The team decides which changes need to happen and when

C.

Too much time is spent analyzing each Story

D.

Scrum Masters who work with multiple teams do not have time for their teams

E.

Too much time is spent prioritizing Features

Buy Now
Questions 22

Which two actions must the Release Train Engineer (RTE) take when facilitating the Pro-gram Increment (PI) Planning event? (Choose two.)

Options:

A.

Prioritize the Features

B.

Distribute the PI Planning agenda to the Agile Teams

C.

Purchase sugary snacks

D.

Ensure the facilities are set up appropriately

E.

Wear the RTE visor

Buy Now
Questions 23

How can a Release Train Engineer help unlock intrinsic motivation?

Options:

A.

Give tough feedback supportively and be willing to be more vulnerable

B.

Establish good incentives for aligning with the enterprise ' s goals

C.

Emphasize participation from senior leadership to expedite decisions

D.

Practice healthy conflict resolution between teams and team members

Buy Now
Questions 24

What is the Release Train Engineer ' s (RTE ' s) role during the final plan review during PI Planning?

Options:

A.

Verify that each team ' s uncommitted objectives have lower business value than the committed PI Objectives to reflect proper prioritization

B.

Encourage discussion of each team ' s product Vision as part of the final plan review

C.

Facilitate all teams when they are presenting their final plans to the entire ART

D.

Manage the ROAMing of each team ' s risks

Buy Now
Questions 25

Who provides Agile Release Train context and Vision during Pl Planning?

Options:

A.

Product Owner

B.

Product Management

C.

Release Train Engineer

D.

Business Owner

Buy Now
Questions 26

Which responsibility belongs to the Product Owner?

Options:

A.

Testing Features

B.

Assigning Pl Objectives

C.

Prioritizing the Team Backlog

Buy Now
Questions 27

What is an input to the Program Increment Planning process that highlights how Product Management plans to accomplish the Vision?

Options:

A.

Top ten Features

B.

Top 20 Features

C.

Business context

D.

Program board

Buy Now
Questions 28

What are the three key items communicated on the Program Board? (Choose three.)

Options:

A.

Feature delivery dates

B.

PI Objectives

C.

Program risks

D.

Milestones

E.

Dependencies between teams

F.

Team velocity

Buy Now
Questions 29

What is an anti-pattern for a Release Train Engineer facilitating a scrum of scrums meet-ing?

Options:

A.

Run the meeting in front of the program board

B.

Facilitate the meeting using a focused and visible agenda and timebox

C.

Address the most important questions for Program Increment (PI) execution

D.

Review individual team performance

Buy Now
Questions 30

What is communicated on the ART planning board?

Options:

A.

ART PI risks

B.

Dependencies between teams

C.

Team velocity

D.

PI Objectives

Buy Now
Questions 31

What is one technique for building a one-team culture across the ART?

Options:

A.

Ensure the team leader does not show vulnerability

B.

Rotate team members to new teams to facilitate relationship building

C.

Foster an environment in which the whole ART succeeds and fails together

D.

Review each teams ' predictability measure with the ART

Buy Now
Questions 32

In what way is a value stream map different from a process flow?

Options:

A.

A value stream map uncovers local problems in functional organizations

B.

A value stream map measures the flow of value and identifies bottlenecks for improvement

C.

A value stream map is used to define Solution Context

D.

A value stream map can be operational or developmental; process flows are only operational

Buy Now
Questions 33

SAFe is based on four primary bodies of knowledge which include Agile development, systems thinking, DevOps, and what type of product development?

Options:

A.

Incremental product development

B.

Adaptive product development

C.

Lean product development

D.

Iterative product development

Buy Now
Questions 34

What behavior is an important part of the Release Train Engineer (RTE) role?

Options:

A.

Encourage teams to self-organize

B.

Manage dependencies for teams

C.

Provide teams with answers about Features

D.

Drive teams to specific outcomes

Buy Now
Questions 35

What is this statement describing? " Agile Teams continuously adapt to new circumstanc-es and enhance the methods of value delivery. "

Options:

A.

Continuous Improvement

B.

Continuous Delivery

C.

Continuous Integration

D.

Continuous Deployment

Buy Now
Questions 36

What is one way to use the results from Value Stream mapping?

Options:

A.

Focus on one component to optimize

B.

Calculate the metrics and share them with the ART

C.

Move from bottleneck to bottleneck, eliminating as many as possible

D.

Identify methods for developers to code faster

Buy Now
Questions 37

What action can result in reduced collaboration between teams during the Program Increment (PI) Planning event?

Options:

A.

Skip the Inspect and Adapt event

B.

Include inexperienced team members

C.

Start the Agile Release Train without a System Team in place

D.

Overprepare for PI Planning

Buy Now
Questions 38

The ART is near the end of the final Iteration of its first PI. Integration into staging is more challenging

than estimated. The ART adds a week to the Innovation and Planning (IP) Iteration for integration and

testing. Why is this action considered an anti-pattern?

Options:

A.

Overall, train velocity goes up, and the time-to-market goes down

B.

It decreases job satisfaction by removing autonomy and purpose

C.

It reduces the overall predictability established through cadence and synchronization

D.

It substantially decreases the predictability of the Solution Intent

Buy Now
Questions 39

(Which event facilitated by the Release Train Engineer (RTE) is designed to keep the ART on the tracks?)

Options:

A.

Solution Demo

B.

Iteration Review

C.

Team Sync

D.

Coach Sync

Buy Now
Questions 40

What foundational issue most often leads to team dysfunction?

Options:

A.

Absence of trust

B.

Weak Lean-Agile leadership

C.

Fear of conflict

D.

Lack of commitment

Buy Now
Questions 41

Program Increment (PI) Planning is a major event that requires preparation, coordina-tion, and communication. What are two key areas a Release Train Engineer should focus on to support a successful PI Planning event? (Choose two.)

Options:

A.

Organizational readiness - Strategic alignment; roles, teams, and train setup

B.

Architectural readiness - Defining the Architectural Runway

C.

Operational readiness - Facilitating PI events such as scrum of scrums, Iteration Planning, and System emo

D.

Facilities readiness - Space and logistics for the event

E.

Process readiness - The operational rhythm that enables SAFe governance

Buy Now
Questions 42

What is one benefit of the Innovation and Planning (IP) Iteration?

Options:

A.

It allows for additional planned work

B.

It allows for building in quality and compliance

C.

It provides an estimating guard band

D.

It provides an opportunity to integrate and perform end-to-end testing

Buy Now
Questions 43

The Release Train Engineer (RTE) learns the teams feel the business value needs to reflect the effort

and progress. What is one technique the RTE can use to provide the Business Owners a better

understanding of the value the teams have created?

    Work with the team to ensure they are actively involved when the Business Owners score the

business value achieved

    Educate teams that business value provides the Enterprise with a metric of how fast the team

executed work during the PI

Deliverable

Options:

A.

Illustrate the link between business values and the market communications/release objectives tied to the three to six-month Enterprise Strategy

B.

Publish the team business values and coach teams that these values are for tracking each ART

Buy Now
Questions 44

Which SAFe tool might the RTE use to identify areas for an ART to improve how its Con-tinuous Delivery Pipeline (CDP) functions?

Options:

A.

Agile Product Delivery core competency assessment

B.

Facilitate a CDP sync every iteration

C.

Conduct empathy interviews with system architects/engineers

D.

Architectural runway program backlog enablers

Buy Now
Questions 45

(The teams on the ART just finished the second Iteration in the PI and have nothing to demonstrate at the System Demo. What steps should be taken next?)

Options:

A.

Stop working on any new functionality and fully integrate and test the system; adjust scope based on learnings

B.

Require every team demonstrate their team increment to the stakeholders separately in the team branch

C.

Re-architect the system so that there are no dependencies between the teams, and integration is not needed

D.

Continue to work on new functionality and reserve time to fully integrate the system during the IP Iteration

Buy Now
Questions 46

What are three actions to take to support a Continuous Integration (CI) culture? (Choose three.)

Options:

A.

Purchase a CI tool

B.

Ensure fixing a failed integration attempt is always the top priority

C.

Secure senior leadership support before starting CI

D.

Integrate often

E.

Follow up with CI ceremonies

F.

Make integration results visible

Buy Now
Questions 47

Which of the following roles should help facilitate an ART Sync?

Options:

A.

Business Owner

B.

Epic Owner

C.

Product Owner (PO)

D.

Product Management

Buy Now
Questions 48

An effective Scrum Master is a team-based servant leader who helps the team do what?

Options:

A.

Embrace relentless improvement through Iteration retrospectives

B.

Understand and operate within Lean Budgets

C.

Develop better and more specialized skill sets

D.

Manage the team ' s own backlog

Buy Now
Questions 49

Which statement is true about the definition of done (DoD)?

Options:

A.

The DoD is not used by the teams because it is used as a method to manage tech-nical debt across the ART

B.

At the higher levels there is only one DoD for everything that passes through the Agile Release Train to a Solution increment or a release

C.

The teams share one common DoD

D.

The DoD should evolve as system capabilities evolve

Buy Now
Questions 50

The Release Train Engineer (RTE) is to attend multiple reviews and status meetings to discuss the Agile Release Train ' s (ART) progress at the end of each Iteration. What ac-tion could the RTE take to manage expectations?

Options:

A.

Determine the RTE ' s capacity for attending meetings and do not exceed it

B.

Make status available at the end of every other Iteration rather than every Itera-tion

C.

Delegate some program reporting and meeting attendance to Scrum Masters on the train

D.

Encourage interested parties to attend the System Demo

Buy Now
Questions 51

What are two examples of team-level events? (Choose two.)

Options:

A.

Backlog refinement

B.

System Demo

C.

Daily stand-up

D.

Program Increment Planning

Buy Now
Questions 52

How are the 5 Whys used?

Options:

A.

To coach a team through powerful questions

B.

To brainstorm ideas

C.

To define acceptance criteria for a Story

D.

To identify a root cause(s) of a problem

Buy Now
Questions 53

Which core competency describes the ability to deliver continuous value?

Options:

A.

Organizational Agility

B.

Lean Portfolio Management

C.

Business Agility

D.

Agile Product Delivery

Buy Now
Questions 54

Which of the Core Competencies of Business Agility includes aligning strategy with execution?

Options:

A.

Organizational Agility

B.

Lean Portfolio Management

C.

Agile Product Delivery

D.

Lean-Agile Leadership

Buy Now
Questions 55

How does a Release Train Engineer view the role of functional managers on the Agile Release Train?

Options:

A.

As decision makers

B.

As developers of people

C.

As a content authority for work

D.

As problem solvers

Buy Now
Questions 56

What is the main reason why some teams never reach Stage 4 (Performing) in the stag-es of high performing teams?

Options:

A.

Because leadership is spontaneous

B.

Because the team is not structured correctly

C.

Because there are conflicts

D.

Because no one guides them

Buy Now
Questions 57

Which statement is true about scrum?

Options:

A.

lt is an ideal method for static design requirements

B.

lt is a team-based framework

C.

lt is a Lean system engineering technique

D.

lt is a set of technical software practices

Buy Now
Questions 58

Which role should the Release Train Engineer play related to a hackathon event?

Options:

A.

Ensure the teams have allocated story points in the Innovation and Planning Itera-tion during the Program Increment to account for the effort

B.

Get approval for work to be done in the hackathon

C.

Allow the teams as much flexibility as possible to promote innovation

D.

Work with development leaders to make sure they give clear and detailed guid-ance to the developers on what is expected

Buy Now
Questions 59

Why is a confidence vote held at the end of program increment (Pl) planning?

Options:

A.

To build shared commitment to the plan

B.

To remove the risks for the Pl

C.

To ensure the business owners accept the plan

D.

To hold the teams accountable if the Agile release train (ART) does not deliver on its commitment

Buy Now
Questions 60

What hourly activity helps keep teams on track and facilitates early identification of risks during the

Team Breakout portion of PI Planning?

Options:

A.

Iteration Review

B.

ART planning board inspection

C.

Coach Sync

D.

Business Owner feedback meeting

Buy Now
Questions 61

What is one way Kanbans are used in SAFe?

Options:

A.

To manage queue length

B.

To manage runway cadence

C.

To manage Program Increment (Pl) Objectives

Buy Now
Questions 62

During Program Increment (PI) Planning, a scrum of scrums occurs just before the draft plan review. The Scrum Master from one team raises an issue that one of the Product Managers just showed up to the planning area with a priority wish list of items. These items do not align with the Feature prioritization. What is the most likely planning anti-pattern causing this sudden impediment?

Options:

A.

There is strong alignment between business and marketing

B.

Planning decisions have been centralized

C.

Prioritization by Product Management was performed autonomously not collaboratively

D.

There is no social network that Solution development relies on

Buy Now
Questions 63

What is a common reason why a team is unable to estimate a story?

Options:

A.

The team does not understand the tasks related to the story

B.

The story lacks acceptance criteria

C.

The team has no experience in estimating

D.

The story does not include a role

Buy Now
Questions 64

(What is one action the Release Train Engineer (RTE) can take to facilitate team growth?)

Options:

A.

Provide a team Vision

B.

Encourage continuous learning

C.

Encourage skill specialization

D.

Facilitate conflict

Buy Now
Questions 65

What are the three measurement domains supporting Business Agility?

Options:

A.

Outcomes, Competency, and Flow

B.

PI Objectives, ART predictability measure, and KPIs

C.

ART predictability measure, SAFe outcomes, and Competency

D.

Key Performance Indicators (KPIs), PI Objectives, and Flow

Buy Now
Questions 66

What are two responsibilities of the Release Train Engineer as chief Scrum Master for the Agile Release Train (ART)? (Choose two.)

Options:

A.

Break down Features into Stories

B.

Escalate ART impediments

C.

Provide the go/no-go decision for large initiatives

D.

Analyze Epics in the Portfolio Kanban

E.

Facilitate Program Increment (PI) Planning

Buy Now
Questions 67

Iteration Goals serve what purpose?

Options:

A.

To align team members to a common purpose

B.

To define the what, the how, and the how much

C.

To set preliminary PI Objectives

Buy Now
Exam Code: SAFe-RTE
Exam Name: SAFe Release Train Engineer (RTE 6.0)
Last Update: May 17, 2026
Questions: 225

PDF + Testing Engine

$64.99  $185.69

Testing Engine

$49.99  $142.83
buy now SAFe-RTE testing engine

PDF (Q&A)

$54.99  $157.11
buy now SAFe-RTE pdf