A customer wants to design and deploy Workspace ONE Access to provide an SSO for VMware Aria Suite users. The customer has two data centers with low bandwidth and high latency constraints. The customer requires mitigation against data center failure.

What two design decisions would achieve the customer’s requirements? (Choose two.)

Options:

A.

Deploy SQL Always-on Availability Group cluster across both sites.

B.

Deploy a Workspace ONE Access cluster with internal PostqreSQL in one site.

C.

Deploy a stretched PostgreSQL database cluster across both sites.

D.

Replicate Workspace ONE Access cluster between sites and protect it using VMware Site Recovery Manager.

E.

Deploy a stretched Workspace ONE Access cluster across both sites, connected to stretched database cluster.

Buy Now
Questions 5

A customer wants to deploy Workspace ONE Access for VMware Aria Suite users. The customer wants to achieve the following requirements:

95% availability per month, excluding weekends

The deployment footprint must be minimal

Which design decision should the architect choose?

Options:

A.

Deploy a single Workspace ONE Access node and protect it with VMware Fault Tolerance.

B.

Deploy a single Workspace ONE Access node and protect it withvSphereHigh Availability.

C.

Deploy a Workspace ONE Access cluster and protect it with VMware Fault Tolerance.

D.

Deploy a Workspace ONE Access cluster and protect it withvSphereHigh Availability.

Buy Now
Questions 6

An architect is designing the authentication and identity management component of a private cloud solution and has gathered the following information from the customer.

Single forest multi-domain Active Directory deployment.

Solution must be highly available.

Which approach can the architect take to achieve this?

Options:

A.

Design Workspace One Access as a single node deployment and configure the service as a Single Active Directory Integrated Windows Authentication directory type.

B.

Design Workspace One Access as a clustered deployment and configure the service as a Single Active Directory Integrated Windows Authentication directory type.

C.

Design Workspace One Access as a clustered deployment and configure the service as an LDAP directory type.

D.

Design Workspace One Access as a single node deployment and configure the service as an Active Directory over LDAP directory type.

Buy Now
Questions 7

An architect is designing a VMware Aria Operations for Logs cluster for an organization. Details of the cluster are provided below:

It is a 10-node cluster

No event forwarders are used

How are the collected logs stored in this cluster?

Options:

A.

Redundant copies of the same data are stored in different nodes in the cluster.

B.

A single copy of data is retained without any backup.

C.

Exactly two copies of the data are made and stored in two separate nodes.

D.

Number of data copies and their placement is determined by a complex algorithm.

Buy Now
Questions 8

Refer to the exhibit. A customer wants to collect data from 120,000 objects and given the VMware Aria Operations sizing guide.

3V0-32.23 Question 8

Assuming the customer has no requirements for continuous availability or high availability, what recommendation for the quantity and type of nodes should the architect provide?

Options:

A.

6 Large Nodes

B.

12 Large Nodes

C.

3 Extra Large Nodes

D.

8 Medium Nodes

Buy Now
Questions 9

Which VMware Cloud Management product can help deliver the following use cases:

Continuous operating system compliance enforcement

Automated vulnerability detection and remediation

Options:

A.

VMware Aria Automation Config

B.

VMware Aria Automation Pipelines

C.

VMware Aria Automation for Secure Hosts

D.

VMware Aria Automation for Secure Clouds

Buy Now
Questions 10

An architect is designing a Cloud Management solution for an existing VMware Software-Defined Data Center solution. During the requirements gathering workshop with the customer, the following comment was captured:

The solution must be compliant to Payment Card Industry (PCI) standards.

When creating the design documentation, which design quality should be used to classify the requirements?

Options:

A.

Security

B.

Manageability

C.

Recoverability

D.

Performance

Buy Now
Questions 11

A customer is deploying VMware Aria Operations for Logs in their data centers. The customer has the following:

Three data centers in three geographical locations. Average latency is approximately 20 ms.

L2 stretched networks are not available.

The customer has the following requirement:

Logs collected from any datacenter must be protected against site failure.

Which three design decisions would the architect choose to achieve the requirement? (Choose three.)

Options:

A.

Size a VMware Aria Operations for Logs cluster to accommodate logs from all data centers.

B.

Configure log forwarding from each data center to another one.

C.

Deploy a VMware Aria Operations for Logs cluster in each data center.

D.

Configure forwarding filters to forward logs only once.

E.

Deploy a VMware Aria Operations for Logs stretched across all data centers.

F.

Configure log protection to tolerate one data center failure.

Buy Now
Questions 12

An architect is designing the VMware Aria Operations component of a Cloud Management solution. The following information has been provided by the customer:

The solution must support the monitoring of virtual machines across three physical sites.

The latency between each physical site is less than 10 ms.

The solution must be resilient to a site failure.

The solution should be resilient to a failure within a site.

Which two design decisions should the architect document to meet the requirements? (Choose two.)

Options:

A.

The VMware Aria Operations cluster should be deployed across all sites usinq vSphere Hiqh Availability

B.

The VMware Aria Operations cluster should be deployed across all sites using Continuous Availability

C.

The VMware Aria Operations cluster should be deployed in each site using High Availability

D.

The VMware Aria Operations cluster should be deployed across all clusters usinq vSphere Fault Tolerance

E.

All VMware Aria Operations components should reside on clusters confiqured for vSphere Fault Tolerance

Buy Now
Questions 13

Which two design decisions would an architect document as part of the physical design? (Choose two.)

Options:

A.

VMware Aria Operations Remote Collectors will be deployed in each location.

B.

The solution will use VMware Aria Operations Continuous Availability.

C.

Storage replication for VMware Aria Operations Manager will not be enabled.

D.

The VMware Aria Operations analytics cluster will be comprised of three Large nodes.

E.

vSpherereservation will be used to guarantee a 1:1 vCPU to physical core ratio for data nodes

Buy Now
Questions 14

A customer wants to protect VMware Aria Suite Lifecycle against data loss. They want to achieve a Recovery Point Objective of six hours and a Recovery Time Objective of one hour.

Which three design decisions should the architect make? (Choose three.)

Options:

A.

Backup the VMware Aria Suite Lifecycle usinga VADP-compatible solution.

B.

Backup team must be able to complete the restoration of VMware Aria Suite Lifecycle in six hours.

C.

Backup the VMware Aria Suite Lifecycle configuration to a remote SFTP server.

D.

Backup team must be able to complete the restoration of VMware Aria Suite Lifecycle in one hour.

E.

Backup must run and complete at least even/ six hours

F.

Backup must run and complete at least every one hour

Buy Now
Questions 15

An architect is creating a design for a VMware Cloud Management solution. Based on customer constraints, the design decision has already been made to select VMware Aria Automation (SaaS) as part of the solution.

The architect is evaluating a customer requirement to integrate with an IT Service Management (ITSM) solution that is based on-prem. The vendor of the ITSM solution has previously created an Aria Automation Orchestrator plugin that can be used as the foundation of the integration.

What additional component must the architect include in the solution design that will satisfy the requirement?

Options:

A.

VMware Aria Automation Orchestrator (SaaS)

B.

VMware Aria Automation cloud extensibility proxy

C.

VMware Aria Automation Orchestrator (on-prem)

D.

VMware Aria Automation cloud proxy

Buy Now
Questions 16

An architect is evaluating a customer requirement to include Active Directory users as custom resources to be managed by VMware Aria Automation deployments.

What additional component could the architect include in the solution design that will help satisfy the requirement?

Options:

A.

VMware Aria Automation Orchestrator

B.

VMware Aria Automation Pipelines

C.

VMware Identity Manager

D.

VMware Aria Automation LDAP proxy

Buy Now
Questions 17

An architect is responsible for reviewing the requirements for a new operations management solution design.

Which requirement would be considered a non-functional requirement?

Options:

A.

The solution must support the data collection of up to 10,000 objects.

B.

The solution must support the collection of data across multiple geographical locations.

C.

The solution must authenticate all users with the company's Active Directory domain.

D.

The solution must be capable of supporting a Maximum Tolerable Downtime of four hours

Buy Now
Questions 18

An architect is responsible for creating the design for Cloud Monitoring solution that will be used to monitor a VMware software-defined data center.

Given the information from the Service Owner, which two would be considered as non-functional requirements? (Choose two.)

Options:

A.

The solution must support the monitoring of 2000 virtual machines across two physical data center locations.

B.

The solution must support a monthly availability target of 99.9%.

C.

The solution must support a Recovery Time Objective of four hours.

D.

The solution must support the retention of live data for at least 12 months.

E.

The solution must support the ability to scale by 20 percent over the next five years.

Buy Now
Questions 19

An architect is planning an installation of VMware Aria Operations. Currently, the vSphere management cluster reports CPU contention which is not recommended for a VMware Aria Operations installation.

To mitigate any potential VMware Aria Operations performance issues, which two design decisions should be made? (Choose two.)

Options:

A.

Disable the balloon driver

B.

1:1 ratio between pCPU and vCPU

C.

Choose High Performance option for Power Management Policy

D.

Remove share reservations and limits on the VMware Aria Operations appliances

E.

Set NUMA placement to manual

Buy Now
Questions 20

A company is planning the Aria Automation design as part of the logical design for a cloud management solution project. There are design requirements that VMware Aria Automation be deployed on-prem in a VMware Cloud Foundation environment, and also support high availability.

Which design decision supports the requirements?

Options:

A.

Deploy the VMware Aria Automation cluster nodes as medium-size or larger appliances.

B.

Ensure that the nodes of a VMware Aria Automation cluster are included within a vSphere Distributed Resource Scheduler (DRS) anti-affinity rule so that each node is located on a different host.

C.

Deploy VMware Aria Automation as a cluster of three nodes with an embedded load balancer in the default management vSphere cluster.

D.

Place the VMware Aria Automation cluster nodes on the cross-instance NSX network segment.

Buy Now
Questions 21

An architect is designing a new VMware Aria Cloud Management solution. During the requirements gathering workshop, the customer made the following comments:

The monthly uptime target of the cloud management solution must be 99.9%.

All components of the cloud management solution must be deployed with a N+1 redundancy.

When creating the design documentation, how should these requirements be classified?

Options:

A.

Performance

B.

Recoverability

C.

Availability

D.

Manageability

Buy Now
Questions 22

An architect is responsible for creating the design for a Cloud Management solution that will be used to automate and govern a VMware Software Defined Data Center.

Given the information from the service owner, which two statements would be considered business requirements? (Choose two.)

Options:

A.

The solution must be redundant to a minimum of N+1 including during planned maintenance.

B.

The solution must provide business-aware IT control to enforce security and compliance.

C.

The solution must provide a self-service portal.

D.

The solution must enable faster time to market for new applications and services.

E.

The solution must support cloud agnostic cloud templates creation.

Buy Now
Questions 23

A security team has a requirement to detect unauthorized access or login failures across multiple VMware Aria products and send relevant details to a third-party tool.

Which Cloud Management component provides this capability?

Options:

A.

VMware Aria Operations

B.

VMware Aria Operations for Networks

C.

VMware Aria Operations for Logs

D.

VMware Aria Operations for Applications

Buy Now
Questions 24

What two statements are true about VMware Aria Operations Manager high availability (HA)? (Choose two.)

Options:

A.

To enable HA, you must deploy at least 3 data nodes, plus the primary node.

B.

If the primary node fails, the replica node can take over all functions of the primary node.

C.

With HA. data stored in the primary node is partially backed up on the replica node.

D.

Data collection must be restarted from the administrative interface when the primary node fails.

E.

Upon failure of the primary node, failoverto the replica is automatic.

Buy Now
Questions 25

An architect designed a VMware Aria Operations for Logs cluster for an organization with the following details:

The cluster has 3-nodes with 2 event forwarders sending logs to this cluster.

The VMware Aria Operations for Logs cluster is part of the disaster recovery protection process.

What should be the proper sequence of steps in the Disaster Recovery protection run-book for recovering VMware Aria Operations for Logs cluster?

Options:

A.

1. Restore the worker nodes

2. Restore master node

3. Restore the forwarders

4. Restore any recovered agents

B.

1. Restore the master node

2. Restore worker nodes in any order

3. Restore the forwarders

4. Restore any recovered agents

C.

1. Restore the forwarders

2. Restore worker nodes in any order

3. Restore the master node

4. Restore any recovered agents

D.

1. Restore the master node

2. Restore worker nodes in a specific defined order

3. The forwarders

4. Restore any recovered agents

Buy Now
Exam Code: 3V0-32.23
Exam Name: Cloud Management and Automation Advanced Design
Last Update: Jun 28, 2025
Questions: 86

PDF + Testing Engine

$63.52  $181.49

Testing Engine

$50.57  $144.49
buy now 3V0-32.23 testing engine

PDF (Q&A)

$43.57  $124.49
buy now 3V0-32.23 pdf