Which of the following persons has direct responsibility for the accuracy of production activity reporting?
Which of the following statements about high-volume repetitive manufacturing is true?
To successfully implement a multiple-site pickup of parts from different suppliers, it is necessary that:
A work center has one machine that is operated for one shift per day. The shop runs an 8-hour shift 5 days per week. Machine utilization has been 60% with efficiency at 80%. A routing through this work center has a standard run time of .10 hours per piece. Job number 1234 is for 200 pieces. If the utilization is improved to 80%, the difference in calculated lead time for the job is how many days?
Based on the theory of constraints (TOC) scheduling approach, smaller lots created as a result of splitting order quantities are considered to be:
{exhibit 4705}
The question below is based on the following chart of values relative to upper and lower control limits:
Which of the following types of variation is shown?
Which of the following project characteristics would suggest using the PERT technique, rather than the critical path method?
When an order is split into two orders, the immediate effect on a job shop work center is to increase which of the following elements?
Which of the following actions helps product design and development pursue a strategy of first-to-market?
The primary reason for using an empty conveyance container as a triggering signal is to:
Which of the following approaches provides the reliability necessary to support a tightly integrated manufacturing operation?
With vendor managed inventory, a supplier must obtain which of the following data from the customer to ensure high service levels?
In an attempt to reduce costs associated with information system transactions, which of the following approaches should be considered?
The next job to be performed was selected because it had the least amount of operation time prior to the due date. Which of the following priority sequencing rules was being used?
To decrease time to market for discrete products, it is most effective to improve which of the following phases?
A company produces a part with a nominal diameter of 2.0 inches and a tolerance of ± 0.006 with a standard deviation of 0.001 inches. A sample has the average diameter of 1.996 inches with a standard deviation of 0.001 inches. What is the CPK and process capability?
The actual output of a work center for a given time period can be determined by evaluating the: