WELL-AP WELL Accredited Professional (WELL AP) Exam Questions and Answers
Exposure to which of the following contributes to Orcadian photoentrainment. resulting in a " phase advance’’ shift of the circadian phase?
A team is seeking to satisfy Feature A01: Air Quality, Part 2: Meet Thresholds for Organic Gases through VOC monitoring for a 87.50O ft2 (8 120 m2) project What is the minimum number of volatile organic compound (VOC) sensors that the project owner must install?
The owners of a project undergoing WELL Certification want to promote health and wellness. They have created a slide show of each of the WELL features that are achieved by the project, which will run on the screens installed in the lobby. In reviewing the slide-show, the WELL AP notices that a key element is missing.
Which of the following must be determined and included in the slide-show in order to meet the requirements of
Feature: C01 Health and Wellness Promotion?
Please click on the Project Scenario B button to review the project scenario and answer the following question.
BAY TOWERS BY BAYLEAF - SEATTLE, UNITED STATES - PROJECT SCENARIO B. Bay Towers by Bayleaf is a 20-floor commercial building overlooking Elliot Bay in Seattle, United States.
The building enjoys abundant natural light through floor to ceiling windows which take in Elliot Bay city views. Although located behind a major highway (four-lanes of traffic), there is a pedestrian bridge which connects their ground floor reception to the riverfront park on the other side of the highway.
The building is owned and operated by Bayleaf Inc., a real-estate organization. The building is leased at a 70% occupancy rate by a range of tenants, including those in finance, technology and healthcare. The total expected occupancy of the building is 1,000 people.
Bay Towers is mechanically ventilated and currently has MERV 11 filters. As the building owner, Bayleaf provides HVAC fit-out for tenant spaces, but tenants complete the interior walls and supply the finishes and furniture themselves. While no food is provided by Bayleaf, some individual tenants do have pantries where they provide their own snacks and beverages for their own employees.
Bayleaf manages the building and operates the ground floor which includes the reception, building management office, meeting rooms, as well as the elevator banks on each floor and the rooftop. Meeting rooms are common amenities that are able to be booked by the tenants. Bayleaf has two employees that work at desks onsite, a receptionist at the front desk and a property manager in the building management office.
PROJECT SCOPE & GOALS
Bayleaf has enrolled Bay Towers for WELL Core Certification to attract and retain high-quality tenants and address growing tenant demand for well-being facilities.
As part of the WELL Core Certification scope, Bayleaf intends to renovate their ground floor and are open to leveraging some of this space to include health and well-being programming.
The scope of renovation will also include upgrades to the base building, such as staircases, end-of-trip facilities and the air filtration system. The rooftop will also be converted into a public green space for tenants to use for recreation. Tables, chairs and barbeque facilities will be added, as well as several gardens, including edible plots and lawn areas.
Bayleaf is hoping their WELL Core Certification will provide some initial feature compliance for tenants wishing to also pursue WELL Certification for their spaces.
By installing digital displays that promote the consumption of fruits, vegetables and water in the dedicated eating areas, which of the following features could the project team attempt?
Which of the following environmental cues is most important in regulating the body ' s Orcadian rhythm?
Please click on the Project Scenario B button to review the project scenario and answer the following question.
BAY TOWERS BY BAYLEAF - SEATTLE, UNITED STATES - PROJECT SCENARIO B. Bay Towers by Bayleaf is a 20-floor commercial building overlooking Elliot Bay in Seattle, United States.
The building enjoys abundant natural light through floor to ceiling windows which take in Elliot Bay city views. Although located behind a major highway (four-lanes of traffic), there is a pedestrian bridge which connects their ground floor reception to the riverfront park on the other side of the highway.
The building is owned and operated by Bayleaf Inc., a real-estate organization. The building is leased at a 70% occupancy rate by a range of tenants, including those in finance, technology and healthcare. The total expected occupancy of the building is 1,000 people.
Bay Towers is mechanically ventilated and currently has MERV 11 filters. As the building owner, Bayleaf provides HVAC fit-out for tenant spaces, but tenants complete the interior walls and supply the finishes and furniture themselves. While no food is provided by Bayleaf, some individual tenants do have pantries where they provide their own snacks and beverages for their own employees.
Bayleaf manages the building and operates the ground floor which includes the reception, building management office, meeting rooms, as well as the elevator banks on each floor and the rooftop. Meeting rooms are common amenities that are able to be booked by the tenants. Bayleaf has two employees that work at desks onsite, a receptionist at the front desk and a property manager in the building management office.
PROJECT SCOPE & GOALS
Bayleaf has enrolled Bay Towers for WELL Core Certification to attract and retain high-quality tenants and address growing tenant demand for well-being facilities.
As part of the WELL Core Certification scope, Bayleaf intends to renovate their ground floor and are open to leveraging some of this space to include health and well-being programming.
The scope of renovation will also include upgrades to the base building, such as staircases, end-of-trip facilities and the air filtration system. The rooftop will also be converted into a public green space for tenants to use for recreation. Tables, chairs and barbeque facilities will be added, as well as several gardens, including edible plots and lawn areas.
Bayleaf is hoping their WELL Core Certification will provide some initial feature compliance for tenants wishing to also pursue WELL Certification for their spaces.
Which of the following ongoing procedures is required for water dispensers in Feature W06?
A WELL AP is reviewing a zoning layout for a new WELL commercial fit-out project. Which of the following spaces should be labeled as acoustically quiet zones?
A WELL AP offers design guidance to support active occupants and visitors of a university project with a Bike Score® of 50. There will be approximately 100 peak visitors and 1.500 regular occupants in the building The WELL AP should advise that the university project provide
Which strategy promotes proper hydration and access to drinking water and can contribute to points in the Water concept?
To reduce sound transmission between adjacent spaces, construction plans should specify
A WELL v2™ project is aiming for WELL Precertification. The project learn should submit documents that demonstrate compliance with all preconditions and which of the following allocations of points?
According to Feature: T04 Individual Thermal Control, which of the following is an effective strategy for improving individual thermal comfort in a given space?
The WELL project administrator realizes that a project ' s special circumstances do not meet the WELL features, as written. They would like to explore other means of compliance and cannot find a similar situation in the official International WELL Building Institute™ (IWBI™) guidelines. What should the project administrator do next?
A project team is pursuing Feature A08 Air Quality Monitoring and Awareness The installed air quality monitor density should at least be one sensor per
A)

B)

C)

D)

The space layout plan of a Commercial project has been provided to the design team for comment. The plan shows a combination of open plan offices, breakrooms, circulation, a kitchen and a nap room. Which of the following aspects of the layout should the WELL AP highlight to the architect as presenting a potential acoustic issue?
A client seeking WELL Certification would like to reduce work-induced fatigue. Which strategy should a WELL AP recommend to achieve this goal?
A team is developing a health-oriented mission statement. Which of the following should be included to comply with Feature C02: Integrative Process?
A WELL AP is reviewing the color temperature of lights used for a regularly occupied space in an existing office building. What other design consideration should be taken into account when creating a lighting environment that enhances visual comfort?
A food services company is trying to meet the health goals of the building owner by providing access to healthy foods, including fruits and vegetables. Which of the following strategies would support Feature N01: Fruits and Vegetables?
The Project must provide which of the following pieces of information at registration?
During a project review meeting, a member of the facility management team states that asbestos containing materials (ACMs) may be present within the project boundary. What strategy should the project team follow to evaluate this issue?
To support meal preparation for occupants in an office building, which of the following strategies should the design team include for employees to meet Feature N10: Food Preparation?
A project team is evaluating products to meet Feature X07: Materials Transparency, Part 1: Select Products with Disclosed Ingredients. What strategy should the team take to ensure products meet this feature ' s requirements?
To contribute to Feature A11: Source Separation, which of the following rooms is most likely to require exhaust fans such that the return air is vented outdoors and not recirculated?
A small family-run business owned by an accredited nutritionist has noticed an increase in the number of processed foods brought in by employees for lunch. Which strategy could the WELL AP recommend at no additional cost to the client to meet the requirements of Feature N07 Nutrition Education?
A consultant on a WELL project is working with the design team to enhance speech privacy in conference rooms.
Which of the following would be most effective at maximizing speech privacy in these spaces?
Exposure to which of the following contributes to circadian photoentrainment, resulting in a " phase advance " shift of the circadian phase?
At what stage are documents created that represent policies and operations schedules that are planned to be implemented?
At a local university, lecturers teaching in an auditorium receive feedback that students experience an echo during class.
The following is some basic information about the auditorium:
. There are a total of 200 fully upholstered seats (10 rows of 20 seats each)
. A fabric covered ceiling is installed, suspended 5 ft. (1.52 m) from the concrete slab above
. 50% of the floor is carpeted, with the other 50% bare concrete finish
. The walls are left as bare concrete
Which of the following design interventions would be most likely to reduce reverberation times in the auditorium?
Which of the following hazardous materials have been restricted for use in paints in many countries?
What are possible impacts of poor lighting color rendering and flicker on people ' s health?
A project ' s site previously housed a fuel station and an automotive repair shop. Which strategy should the WELL AP recommend?
Feature C07: Enhanced Health and Wellness Promotion requires projects to cultivate a culture of health through communication, health promotion programs and educational sessions. What is the minimum frequency required of these sessions?
In addition to Feature M02: Nature and Place, the installation of potted plants and an indoor water fountain could contribute to the achievement of which other features?
Please click on the Project Scenario B button to review the project scenario and answer the following question.
BAY TOWERS BY BAYLEAF - SEATTLE, UNITED STATES - PROJECT SCENARIO B. Bay Towers by Bayleaf is a 20-floor commercial building overlooking Elliot Bay in Seattle, United States.
The building enjoys abundant natural light through floor to ceiling windows which take in Elliot Bay city views. Although located behind a major highway (four-lanes of traffic), there is a pedestrian bridge which connects their ground floor reception to the riverfront park on the other side of the highway.
The building is owned and operated by Bayleaf Inc., a real-estate organization. The building is leased at a 70% occupancy rate by a range of tenants, including those in finance, technology and healthcare. The total expected occupancy of the building is 1,000 people.
Bay Towers is mechanically ventilated and currently has MERV 11 filters. As the building owner, Bayleaf provides HVAC fit-out for tenant spaces, but tenants complete the interior walls and supply the finishes and furniture themselves. While no food is provided by Bayleaf, some individual tenants do have pantries where they provide their own snacks and beverages for their own employees.
Bayleaf manages the building and operates the ground floor which includes the reception, building management office, meeting rooms, as well as the elevator banks on each floor and the rooftop. Meeting rooms are common amenities that are able to be booked by the tenants. Bayleaf has two employees that work at desks onsite, a receptionist at the front desk and a property manager in the building management office.
PROJECT SCOPE & GOALS
Bayleaf has enrolled Bay Towers for WELL Core Certification to attract and retain high-quality tenants and address growing tenant demand for well-being facilities.
As part of the WELL Core Certification scope, Bayleaf intends to renovate their ground floor and are open to leveraging some of this space to include health and well-being programming.
The scope of renovation will also include upgrades to the base building, such as staircases, end-of-trip facilities and the air filtration system. The rooftop will also be converted into a public green space for tenants to use for recreation. Tables, chairs and barbeque facilities will be added, as well as several gardens, including edible plots and lawn areas.
Bayleaf is hoping their WELL Core Certification will provide some initial feature compliance for tenants wishing to also pursue WELL Certification for their spaces.
How many workstations need to be height-adjustable to satisfy the requirements of the preconditions?
A client taking up one floor of a high-rise building is pulling together materials for an upcoming stakeholder charrette and has asked the WELL AP to review the information to ensure that the requirements of Feature C02: Integrative Process will be met. The WELL AP noticed that the list of invitees seemed long. In order to accommodate an effective charrette, which of the following groups should the WELL AP suggest that the client remove from the list of invitees?
Which of the following hazardous materials is known to impair the intellectual development of children and the unborn during pregnancy?
Which of the following layouts would meet the requirements to provide enough exposure to meet the precondition in Light?
Which of the following is an accurate list of the core parameters that impact thermal comfort in a mechanically conditioned space?
According to the WELL Building Standard™, approximately what percentage of the global adult population fails to achieve activity guidelines and is considered physically inactive?
Workplace family support includes parental leave policies that give paid paternity and maternity leave for the primary caregiver during any 12-month period for at least
An employer will be leasing a new building that has one central space for a cafeteria. Which of the following conditions should the employer look for in order to comply with Feature N08: Mindful Eating?
What should the minimum size be for a restorative space in a project with 30 regular occupants to comply with Feature M07: Restorative Spaces?
A new employee indicates to the human resources department of a project undergoing WELL Certification that they have a peanut allergy. Due to their role, the employee is required to attend catered meetings within the office for prospective clients. The project is trying to update their catering policy to accommodate the employee ' s health condition. Which of the following strategies should the WELL AP suggest to meet Feature N09 Special Diets?
Which of the following ergonomic design strategies would a project team implement to achieve Part 1: Support Visual Ergonomics of Feature V02: Ergonomic Workstation Design?
A company is moving is 1, 500 employees into a new office building, which has lust passed documentation review. The building contractor has handed over the project. And the certificate of occupancy was granted two months ago Currently, 650 employees occupy the building. Which of the following steps should the WELL AP advise the project team to take next?
A building operations staff and a WELL AP are developing a cleaning plan for a new office building. What is the best strategy to minimize environmental damage from the cleaning process?
Which of the following design strategies implemented in the meeting rooms would help the protect achieve Feature S04: Reverberation Time?
A project team has completed the stakeholder charrette and created a plan detailing the project ' s health-oriented mission prior to construction. What must the team do upon project completion for Feature C02: Integrative Design?
There is evidence to suggest that environments with poor acoustics may lead to an increase in which of the following health impacts?
A WELL AP is monitoring the ongoing submission of documents required for a WELL Certified project. Which strategy should the WELL AP use to ensure the requirements are met?
A WELL project for a first recertification elects to be reviewed under the version for which it achieved initial certification. Under which of the following will the project be reviewed for subsequent recertifications?
A permanently installed an conditioner was used during construction What should be done to this equipment prior to occupancy?
